Loading...
HomeMy WebLinkAboutC2017-333 - 5/5/2017 - NA CITY OF CORPUS CHRISTI AMENDMENT NO.4 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas,a Texas home-rule municipal corporation("City")and LNV.Inc.("Consultant"), agree to the following amendments to the Contract for Professional Services for O.N. Stevens Water Treatment Plant High Service Building No. 3(Project No. E11066): Original Contract February 13, 2013 Administrative Approval $47,500.00 Amendment No. 1 October 15, 2013 Motion No. 2013-159 $2,358,103.00 Amendment No. 2 April 1, 2015 Administrative Approval $28,600.00 Amendment No. 3 February 15,2016 Administrative Approval $2,581.16 In the Original Contract, Exhibit A, Scope of Services shall be amended as set forth in the attached Amendment No.4, Exhibit"A". In the Original Contract,Exhibit A, Fees shall be amended based on the modified scope of services in the attached Amendment No. 4, Exhibit A for a fee not to exceed $20,300.00, for a total restated fee not to exceed $2,457,084.16. All other terms and conditions of the February 13, 2013 Contract for Professional Services between the City and Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect. 0 OFC• • - Cif STI . /7 LNV, I C.� tSIIt 09/17 ;Fie H. Gr. , P.E. �� tate n�endecker, P.E. Date V Y E�utive Dire to of amu. is �orks I President 801 Navigation, Suite 300 Corpus Christi, TX 78408 APPROVED AS TO LEGAL FORM (361)883-1984 Office (361) 883-1986 Fax ouvw_ at/1,A Aimee Alcorn-Reed loganb@Invinc.com �t 2017.04.28 15:25:17-05'00' Assistant City Attorney Date ATTEST _ . ,e I! 4e ,---S":5-713-71 �) City Secretary Date Project Number E11066 Accounting Unit 4096-062 Account 550950 Activity E11066-01-4096-EXP Account Category 50950 Fund Name Water 2015 CIP 2017-333 5/05/17 1066 ONSWTP RIGH SRVC BLDG NO 31UIENOMENT NO 4 CONTRACT DOC REV.tW1l15 LNV Inc. INDEXED LNV Solutions Today with a engineers architects contractors Vision for Tomorrow April 11, 2017 Mr. Jeff Edmonds, P.E. Director of Capital Programs City of Corpus Christi P.O. Box 9277 Corpus Christi, Texas 78469-9277 RE: AMENDMENT NO. 4 TO PROFESSIONAL SERVICES CONTRACT O.N. Stevens Water Treatment Plant- High Service Pump Building No. 3 City Project E11066 Mr. Edmonds: In response to the City's request, we are proposing Amendment No. 4 in the amount of $20,300 to provide additional services for the O.N. Stevens Water Treatment Plant - High Service Pump Building No. 3 project (E11066) for a total re-stated project fee of $2,457,084.16. Based on the proposed scope of work and construction, a plan set of approximately six (6) drawings with project specifications are anticipated as part of this amendment. PROJECT BACKGROUND Original Contract On February 18, 2013, LNV received formal Notice to Proceed (NTP) for engineering services associated with the preliminary design of the new High Service Pump Building No. 3 for a total fee of $47,500. This contract provided the scope of work for the full design and construction of the new pump building by evaluating and inspecting the proposed site, performing system-wide hydraulic modeling, and developing design criteria, including demand projections, master plan recommendations, and recommendations from the Elevated Storage Tanks - Citywide and Alternative Capacity Requirement (ACR) projects. Amendment No. 1 On October 17, 2013. LNV received formal Notice to Proceed (NTP) for Amendment No. 1, which was approved by City Council on October 15, 2013 by Motion No. M2013-159, to provide all Basic and Additional Services associated with the design and construction of the new High Service Pump Building No. 3 and Alternative Power Expansion for a fee not-to-exceed $2,358,103 for a total restated fee not-to-exceed $2,405,603. The new pump building is anticipated to have the capability to deliver treated water to the distribution system from the existing clearwells (Clearwell No. 1 and Page 1 of 4 Amend. No. 4 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 Exhibit A OFFICE 361.883 1984 FAX 361 883 1986 WWW LNVINC COM Page 1 Of 5 • No. 2) and future clearwells (Clearwell No. 3 and No. 4). The completion of this project would allow the City to decommission High Service Pump Building No. 1. Amendment No. 2 On April 9, 2015, LNV received formal Notice to Proceed (NTP) for Amendment No. 2 to provide Additional Service No. 23 - Geotechnical - Subsurface Investigation for the new High Service Pump Building No. 3 for a fee not-to-exceed $28,600 for a total restated fee not-to-exceed $2,434,203. This additional service provided a geotechnical investigation of the proposed site for the new pump building and a geotechnical engineering report, which included recommendations for the types of foundations and pavement sections that should be considered in the design of the High Service Pump Building No. 3. Amendment No. 3 On February 16, 2016, LNV received formal Notice to Proceed (NTP) for Amendment No. 3 to provide additional Basic Services (Design and Construction Administration) and Start-up, Warranty, SCADA and Equipment O&M Manual, Windstorm Certification, and Geotechincal - Subsurface Investigation Additional Services associated with the new High Service Pump Building No. 3 for a fee not-to-exceed $2,581.16 for a total restated fee not-to-exceed $2,436,784.16. This amendment reallocated unused funds from the Peer Review Coordination and Response Additional Service in the amount of $138,053.70, along with the additional fee of $2,581.16 to complete the scope of services for Amendment No. 3. The scope of services for Amendment No. 3 included the following tasks: • High Service No. 2 Pump Discharge Control Valve Replacement • High Service No. 2 Motor Protection Relay(MPR) Replacement • Clearwell No. 1 Repairs • Existing Alternative Power Building Retrofit and Windstorm Certification PURPOSE OF AMENDMENT NO. 4 The City staff has requested professional services to assess and propose a solution to address underground erosion issues around Clearwell No. 2 and potential weak unstable soils along the drainage ditch south of the High Service Pump Building No. 3, which were encountered during construction. The purpose of Amendment No. 4 is to provide professional services to meet the City's request and mitigate the unseen erosion issues and ensure the integrity of the existing Clearwell No. 2 and fortify the embankment of the existing drainage ditch. The professional services that will be provided for Amendment No. 4 will include design, construction administration, and topographic survey for developing plans and specifications for the improvements to mitigate the erosion issues that will be issued to the Contractor and incorporated into their work scope for the High Service Pump Building No. 3 project. Page 2 of 4 Amend. No.4 Exhibit A 801 NAVIGATION I SUITE 3W I CORPUS CHRISTI,TEXAS 78408 Page 2 of 5 OFFICE 361.883 1984 I FAX 361.883.19M I WWW.INVINC.COM • • SCOPE OF WORK BASIC SERVICES 2. Design Phase An additional budget allowance of $13,420 has been requested under Amendment No. 4 to address the underground erosion issues that were encountered around Clearwell No. 2 during construction. These erosion issues are intended to be addressed by designing a means for stormwater surrounding Clearwell No. 2 to be conveyed to a central location and sent away from the site to the proposed stormwater outfall structure. Along with these improvements, the Engineer will also provide erosion control measures to minimize any potential erosion along the drainage ditch surrounding the outfall structure south of High Service Pump Building No. 3. All improvements will be incorporated into plans and specifications sealed by a Texas Registered Professional Engineer(PE). 3. Construction Administration Phase An additional budget allowance of $2,880 has been requested under Amendment No. 4 to provide construction administration services for the design and construction of the recommended improvements around Clearwell No. 2 and along the drainage ditch south of the High Service Pump Building No. 3. During this phase, the Engineer will prepare change orders as authorized by the City and provide interpretations and clarifications regarding the requirements of the work associated with Amendment No. 4, as shown in the plans and specifications. This task also allows the Engineer to review and approve all submittals and requests for information (RFIs) associated with this work to ensure the appropriate equipment is purchased and installed properly. The Engineer will also perform a final inspection with City staff and assist in addressing any fingering concerns that may arise. ADDITIONAL SERVICES: 4. Topographic Survey An additional budget allowance of $4,000 has been requested under Amendment No. 4 to provide additional topographic survey at Clearwell No. 2 and ground elevations in the area along the drainage ditch surrounding the stormwater outfall south of High Service Pump Building No. 3. The data obtained by the topographic survey will provide necessary information to assess and design the erosion control measures around Clearwell No. 2 and along the drainage ditch surrounding the stormwater outfall. Page 3 of 4 Amend. No.4 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEAS 78408 Exhibit A OFFICE 36/8831984 I FM 361 883 1956 I W W W LNVINCCOM Page 3 of 5 SCHEDULE All work under Amendment No. 4 of this contract shall be completed by the Engineer in accordance with the schedule provided below. Activity Completion Date Contract Execution - Notice to Proceed (NTP) TBD Basic Services 2. Design Phase 4 weeks after NTP 3. Construction Administration Phase TBD; Based on Contractor's schedule for Project E11066 Additional Services 2. Topographic Survey 1 week after NTP FEES A. Fees for Basic Services. The City will pay fixed fee for providing for all Basic Services" except for the Construction Administration Phase authorized as shown in "ATTACHMENT 1". The services for the Construction Administration Phase will be provided on a Time and Material (T&M) basis as the project is moved towards completion. The fees for Basic Services will not exceed those identified and will be full and total compensation for all services outlined in this amendment. B. Fees for Authorized Additional Services. The City will pay the ENGINEER the not-to- exceed fee shown in "ATTACHMENT 1" for services specified in this amendment. The fee will be full and total compensation for services and for all expenses incurred in performing these services. C. Summary of fees. Refer to ATTACHMENT 1. If you have any questions or if you would like to discuss in more detail, please feel free to call me at 361-883-1984. Sinc: el , Robert M. Viera, P.E. Vice President LNV Inc. TBPE Firm No. F-366 Page 4 of 4 Amend. No. 4 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 Exhibit A OFFICE 361 883.1984 I FAX 361.883.1986 I WWW.LNVINC.COM Page 4 of 5 I Amend. No.4 AMENDMENT NO. 4 Exhibit A Page 5 of 5 ATTACHMENT 1 ORIGINAL CONTRACT •AMD. N0. 1 AMD. NO. 2 AMD. N0. 3 AMD. N0.4 TOTAL BASIC SERVICES 1. Preliminary Phase $ 47,500.00 $ 381,371.00 $ - $ - $ - $ 428,871.00 2. Design Phase $ - $ 963,767.00 $ 88,304.86 $ 13,420.00 $ 1,065,491.86 3. Bid Phase $ - $ 35,219.00 $ - $ - $ 35,219.00 4. Construction Administration Phase $ - $ 277,453.00 $ 19,000.00 $ 3880.00 $ 299,333.00 SUBTOTAL BASIC SERVICES(AUTHORIZED) $ 47,500.00 $ 1,657,810.00 $ - $ 107,304.86 $ 16,300.00 $ 1,828,914.86 ADDITIONAL SERVICES (ALLOWANCE( 1. Permit & Agency Coordination $ - $ 24,026.00 $ - $ - $ - $ 24,026.00 2. Topographic Survey $ - $ 58,346.00 $ ' - $ $ 4,000.00 $ 62,346.00 3. Environmental Issues $ - $ 31,088.00 $ $ - $ - 5 31,088.00 4. Construction Observation Services $ - TBD $ - $- 5. Start -Up Services $ - $ 77,927.00 $ - $ 3,200.00 $ $ 81,127.00 6. Warranty Phase $ - $ 53,906.00 $ - $ 4,950.00 $ - $ 58,856.00 7. SCADA & Equipment O&M Documentation $ $ 51,175.00 $ - $ 2,000.00 $ - $ 53,175.00 8. Public Involvement (N/A) $ - N/A $ $ - $ - $ - 9. Electronic Operatior,s O&M Manual $ - TBD $ - $ - $ - $ - 10. Conformed Contract Documents $ - T8) $ - $ - $ - $ 11. Existing Facilities Condition Assessment $ TBD $ - $ $ - $ 12. Windstorm Certification (AUTHORIZED) $ - $ 19,800.00 $ - $ 21,680.00 $ - $ 41,480.00 13. Peer Review Coordination & Response (AUTHORIZED) $ - $ 153,393.00 $ - $ (138,053.70) $ - $ 15,33930 14. High Srvc. Pumping Sys. Energy Audit & Conservation Evaluation $ - TBD $ - $ - $ - $ - 15. Physical Laboratory Scale Hydraulic Modeling Study $ - TBD $- 16. Disinfection CT Evaluation $ - TBD $ $17. Plant Process and Hydraulic Evaluation $ - TBD $ - $ - $ - $ - 18. Electrical Studies (AUTHORIZED) $ $ 51,150.00 $ - $ $ - $ 51,150.00 19. Control Logic & Application Development Support(AUTHORIZED) $ - $ 28,416.00 $ $ - $ - $ 28,416.00 20. Control System Integration Coordination (AUTHORIZED) $ - $ 28,416.00 $ - $ $ - $ 28,416.00 21. Project Manual (AUTHORIZED) $ - $ 23,650.00 $ - $ - $ - $ 23,650.00 22. Program Management & Projects Coordination (AUTHORIZED) $ - 5 99,000.00 $ - $ - $ - $ 99,000.00 23. Geotechnical - Subsurface Investigation (AUTHORIZED) $ - 5 - $ 28,600.00 5 1,500.00 $ - $ 30,100.00 SUBTOTAL ADDITIONAL SERVICES (AUTHORIZED) $ - $ 700,293.00 $ 28,600.00 $ (104,723.70) $ 4,000.00 $ 628,169.30 TOTAL AUTHORIZED FEE $ 47,500.00 $ 2,358,103.00 $ 28,600.00 $ 2,581.16 $ 20,300.00 $ 2457,084.16 Amend. No.4 AMENDMENT NO. 4 Exhibit A Page 5 of 5 ATTACHMENT 1