HomeMy WebLinkAboutC2017-359 - 6/12/2017 - NA ---
CITY OF CORPUS CHRISTI
AMENDMENT NO. 1
CONTRACT FOR ENGINEERING DESIGN SERVICES
The City of Corpus Christi,Texas,a Texas home-rule municipal corporation("City")and CH2M Hill Engineers,Inc.
("Consultant"), agree to the following amendments to the Contract for Professional Services for Flato Road from
Agnes to Bates BOND 2014 Prop. 2IProject No. E15110}:
Original Contract September 20, 2016 Motion No. 2016-108 $488,862
In the Original Contract, Exhibit"A", Section I. Scope of Services shall be amended as set forth in the attached
Amendment No. 1, Exhibit"A".
In the Original Contract,Section III. Fees shall be amended as set forth in the attached Amendment No. 1, Exhibit
"A"for a fee not to exceed $20,040, for a total restated fee not to exceed $508,902.
All other terms and conditions of the September 20, 2016 Contract for Engineering Design Services between the
City and Consultant, and of any amendments to that contract, which are not specifically addressed herein shall
remain in full force and effect.
CITY`OF CORPUS C RISTI ();(--7
CH2M HILL ENGINEERS, INC.
• 1 1 / IIISA •
`j f 7 4d,4(4,1 ,,cru^' 5-25-17
Vale .e H. Gray',,P.E. • kc1 Dat= Sidney Faas, P.E. Date
Executive Director of 'u• is ork Vice President
555 N. Carancahua, Suite 310
Corpus Christi, TX 78401
361-888-8100 Office
sidney.faas@ch2m.com
APPROVED AS TO LEGAL FORM
I1', I��,' Aimee Alcorn-Reed
00 (�l 2017.05.26 14:49:22-05'00'
Assistant City Attorney Date
ATTEST
)
Project No. E15110
-LC tr-• - (jam Accounting Unit: 3551-051.
Rebecca Huerta D Account: 550950
Activity: E15110013551 EXP
City Secretary
(0/07/ Account Category: 50950
Fund Name: Street CIP BOND 2014
Encumbrance No.
2017-359
6/12/17 .110 FUTO ROAD AGNES TO BATESAMENDMENT 1 CH2M72015 1001 AMENDMENT TO CONTRACT PROFESSIONAL
REV 1011115
CH2M Hill Engineers Inc.
INDEXED
EXHIBIT "A"
CITY OF CORPUS CHRISTI, TEXAS
FLATO ROAD FROM AGNES TO BATES (BOND 2014)
PROJECT NO. E15110
SCOPE OF SERVICES
A. BASIC SERVICES
1. Preliminary Phase. No Change.
2. Design Phase. No Change.
3. Bid Phase. No Change.
4. Construction Administration Phase. No Change.
B. ADDITIONAL SERVICES
1. Permit Preparation. No Change.
2. Right-of-Way (ROW) Identification Survey. No Change.
3. Topographic Survey. No Change.
4. ROW Acquisition and Parcel Maps. No Change.
5. Environmental Issues. No Change.
6. Public Involvement. No Change.
No Change.
8. Construction Observation Services. No Change.
9. Warranty Phase. No Change.
Provide the services above authorized in addition to those items shown on Exhibit"A-1"Task List,
------- ------------which provides supplemental description to Exhibit "A". Note: The Exhibit "A-1" Task List does
not supersede Exhibit "A".
AMD. NO. 1
EXHIBIT"A"
Page 1 of 3
P\Corpuscnns0u1Von6766960atord101 CONTRACTS&AMENDMENTS 01 Large AE1Conlract Amendment No 112017 03 07 Flato Road•EXHIBIT A CA 1 Doc(
II. SCHEDULE
The Contract Schedule shall be as modified below:
Date Activity
Friday, July 1, 2016 NTP
Tuesday, July 19, 2016 Draft ELR submittal
Tuesday, August 2, 2016 City Review
Friday, c a st Ro 2016
iso^�-.<<^,o
Monday, March 27, 2017 Final ELR submittal
T ecday September20 2044
Friday, April 28, 2016 60% Design Submittal
Tuecday, October 11, 2016
Friday, May 19, 2017 City 60% Review
City-Review
Monday, June 26, 2017 100% Final Submittal
Monday, July 10, 2017 City 100% Review
Friday, January 6, 2017
Friday, August 11, 2017 Bid Set Submittal
Monday, August 14, 2017 Advertise for Bids
Wednesda, a, io 2017
Wednesday, August 23, 2017 Pre-Bid Conference
Wednesda, a. 2e 2017
Wednesday, August 30, 2017 Receive Bids
Tuesday, April 11, 2017
Monday, December 11, 2017 Contract Award
May 2017
January 2018 Begin Construction
July 2016
March 2019 Complete Construction
May 2010
January 2020 Warranty Phase Report
AMD. NO. 1
EXHIBIT"A"
Page 2 of 3
P 1CopuschnstiiotyonC76 flatort01 CONTRACTS&AMENOMENTS0I Large AEContract Amendment No 1Q0170307 Flato Road-EXHIBIT A CA I Coo(
•
III. FEES
A. Fee for Basic Services. No change to contract language.
B. Fee for Additional Services. No change to contract language.
Summary of Fees:
PROJECT NAME: FEE AMD TOTAL
FLATO ROAD FROM AGNES TO BATES (BOND 2014) NO. 1 FEE
A. BASIC SERVICES
1 PRELIMINARY PHASE $31,275 $31,275
2 DESIGN PHASE $367,420 _ $18,670 $386,090
3 BID PHASE $12,480 $ - $12,480
4 CONSTRUCTION ADMINISTRATION PHASE $38,330 $ - $38,330
SUBTOTAL OF BASIC SERVICES $449,505 $ 18,670 $468,175
ADDITIONAL SERVICES
1 PERMIT PREPARATION' $3,830 $ - $3,830
2 ROW IDENTIFICATION SURVEY* $5,847 $ - $5,847
3 TOPOGRAPHIC SURVEY* $17,270 $1,370 $18,640
4 ROW ACQUISITION 8 PARCEL MAPS(BATES EAST TRIBUTARY)* $920 $- $920
5 ENVIRONMENTAL ISSUES (TBD) $ - $ - $ -
6 PUBLIC INVOLVEMENT* $6,760 $ - $6,760
8 CONSTRUCTION OBSERVATION SERVICES (TBD) $ - $ - $-
9 WARRANTY PHASE (AUTHORIZATION REQUIRED) $4,730 $ - $4,730
SUBTOTAL OF ADDITIONAL SERVICES $39,357 $1,370 $40,727
TOTAL FEE $488,862 $20,040 $508,902
`Additional Services which are requested to be authorized in coordination with the notice to proceed for Basic
Services.
AMD. NO. 1
EXHIBIT"A"
Page 3 of 3
P ICo,puscknslio(yoF 766S6flato,N01 CONTRACTS&AMENDMENTS101 Large AE\Conlrzd Amendment No 12017 03 07 Flab Road-EXHIBIT A CA 1 Docx
•
EXHIBIT "A-1"
TASK LIST
CITY OF CORPUS CHRISTI, TEXAS
FLATO ROAD FROM AGNES TO BATES (BOND 2014)
PROJECT NO. E15110
I. SCOPE OF SERVICES
Project Limits
Project limits include Flato Road between the south right-of-way of Agnes Street (excludes
includes the Agnes Street right-of-way) and the south right-of-way of Bates Road (excludes
Bates Road right-of-way). The main portion of the project is approximately 5,200 linear feet
in length. Surface improvements include reconstruction of rural collector(C-1) roadway
consisting of one travel lane in each direction. Utility improvements include rehabilitation or
construction of new water and wastewater system lines and appurtenances, and cleaning
and reshaping the existing storm water system ditches and driveway culverts.
Project limits also include proposed 1,350 linear foot long Bates East Tributary. This
proposed channel will provide an outfall from the Flato Road system ditches into the
Enterprize Channel. Also the sidewalk will be extended south along the east Right of
Way of Flato Road approximately 365 LF from the southernmost driveway at Bates
Drive to the north driveway to the West Oso School.
A. BASIC SERVICES
1. Preliminary Phase— No change.
2. Design Phase
a) Coordinate with City Operating Departments, Private Utilities, and Agencies.
Also Coordinate with TxDOT on work within the Right of Way of Agnes
Street. The work within the Agnes Street Right of Way includes
modifications to the curb radii so that improvements can be made to truck
turning movements.
b) No Change.
c) Amend as Follows:
(1) 60% Submittal
(a) Plans—Anticipated sheets include the following
(i) Cover Sheet (1 Sheet)
(ii) General Notes and Abbreviations (1 Sheet)
P:\CorpusChristiCilyofl676696FIatoRtlW1 CONTRACTS&AMENDMENTS\D1 AMD Na 1
Large AE\Contract Amendment No 1\2017 03 07 Flato Overall EXHIBIT A-1 EXHIBIT"A-1"
CA1.docx
Page 1 of 4
•
(iii) Estimated Quantities (2 Sheets)
(iv) Overall Layout/Project Control/Utility Layouts (6 Sheets)
(v) Testing Schedule (1 Sheet)
(vi) Demolition Plans (6 Sheets)
(vii) Existing Typical Sections (1 Sheet)
(viii) Proposed Typical Sections (2 Sheets) (Rigid Pavement Section
Added)
(ix) Plan and Profile—Street and Storm (12 Sheets) (Project Limits
Increased)
(x) Overall Drainage Area Map (1 Sheet)
(xi) Storm Drain Analysis (2 Sheets)
(xii) Miscellaneous Details (3 Sheets) (Details for Concrete
Pavement Added)
(xiii) City Standard Details (5 Sheets)
(xiv) Curb Ramp Details (5 Sheets)
(xv) Curb Ramp Layouts (1 Sheets)
(xvi) Plan and Profile—Water and Wastewater (11 Sheets)
(xvii) City Standard Details (10 Sheets)
(xviii) Permanent Pavement Marking Plans (6 Sheets)
(xix) TxDOT Standard Drawings (12 Sheets)
(xx) Construction Phasing Layout and General Notes (1 Sheet)
(xxi) Traffic Control (12 Sheets)
(xxii) TxDOT Standard Drawings (14 Sheets)
(xxiii) SWP3 Notes (1 Sheet)
(xxiv) SWP3 BMPs (1 Sheet)
(xxv) SWP3 Plan Sheets (6 Sheets)
(b) No Change.
(c) No Change.
P:\CorpusChristiCityor\676696FIatoRd\01 CONTRACTS 8 AMENDMENTS\01 AMD NO. 1
Large AE\Contract Amendment No 1\201103 07 Flato Overall EXHIBIT A-1
CA1.docx EXHIBIT U.
Page 2 of 4
(d) No Change.
(2) 100% Submittal - No Change.
(3) Bid Set Submittal — No Change.
3. Bid Phase— No Change.
4. Construction Administration Phase— No Change.
B. ADDITIONAL SERVICES (ALLOWANCE)
1. Permit Preparation —No Change.
2. Right-Of-Way (ROW) Identification Survey— No Change.
3. Topographic Survey
a) Survey
(1) No Change.
(2) No Change.
(3) Provide detailed surface feature surveys within the project limits and 50 feet
beyond the right-of-way of Flato Road on cross streets. Survey limits will be
extended approximately 365 LF south along the east Right of Way of
Flato Road from the southernmost driveway at Bates Drive to the north
driveway to the West Oso School.
(4) No Change.
(5) No Change.
(6) No Change.
(7) No Change.
(8) No Change.
(9) No Change.
(10) No Change.
(11) No Change.
(12) No Change.
(13) No Change.
b) Drawing Preparation — No Change.
P:\CorpusChristiCityof 676696FIatoRd\01 CONTRACTS&AMENDMENTS\01 AMD NO. 1
Large AE\Contract Amendment No 1\2017 03 07 Flato Overall EXHIBIT A-1
CA1 docx EXHIBIT"A-1"
Page 3 of4
4. ROW Acquisition and Parcel Maps—No Change.
5. Environmental Issues (TBD)—No Change.
6. Public Involvement—No Change.
7. Construction Observation Services (TBD)—No Change.
8. Warranty Phase(AUTHORIZATION REQUIRED)—No Change.
P.1CorpusChdshCityoN376696FbIoRd101 CONTRACTS&AMENDMENTS101 AMC NO. 1
Large AE1Conlrao:Amendment No 112017 03 07 Flab Overall EXHIBIT A-I EXHIBIT r'A-1"
CAI dna
Page 4 of 4