Loading...
HomeMy WebLinkAboutC2017-382 - 7/17/2017 - NA v • CITY OF CORPUS CHRISTI AMENDMENT NO.2 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas, a Texas home-rule municipal corporation("City") and HDR Engineering, Inc. ("Architect/Engineer —NE"), agree to the following amendments to the Contract for Professional Services for Chaparral Street Phase 2 Downtown Development Master Plan (Protect No. 151071: Original Contract - December 29, 2015 Administrative Approval $48,895 • Amendment No. 1 October 25, 2016 Motion No. M2016-143 _ _ 657,649 In the Original Contract, Exhibit"A", Section I. Scope of Services shall be amended as set forth in the attached Amendment No.2, Exhibit"A". In the Original Contract, Section III., shall be amended based on the modified scope of services in the attached Amendment No. 2, Exhibit"A"for a fee not to exceed $3,850, for a total restated fee not to exceed $711,394. All other terms and conditions of the October 25,2016 Amendment No. 1 to the Contract for Professional Services between the City and Consultant, and of any amendments to that contract, which are not specifically addressed herein shall remain in full force and effect. CI C• " -l/S R I HDR ENGINEERING,INC. 1�r1 t I •vim / - •/7 Val:Val: H. Gray, '.E. -1 1 Date Arthur Colwell, P. E Date Exe tive Directo :f P blic WF rk ( Vice President/Managing Principal 555 N. Carancahua, Suite 1600 Corpus Christi, TX 78401 • (361)696-3300 Office arthurcolwell@hdrinc.com APPROVED AS TO LEGAL FORM u, f 2017.06.22 10:34:55-05'00' Assistant City Attorney Date ATTEST tr, `7il - C. Secrete Date Project Number E15107 • ry Accounting Unit 3551-051 Account 550950 Activity E15107013551EXP Account Category 50950 Fund Name Street GO BOND 2016 �.eun•ueco' T naTAFYC.HANGEUNGIEKSTREET\E15107 CHAPARRAL STREET PHASE 2 DOWNTOWN DEPVELOPMENT MASTER PLANIAMENDMENT 2 H0R120151001 AMENDMENT TO REV.10/1/15 2017_3p2 7/17/17 HDR Engineering Inc. INDEXED FYZ REV 01 May 25, 2017 10028053 Mr. Jeff H. Edmonds, P.E., Director of Engineering Services City Of Corpus Christi 1201 Leopard Street Corpus Christi, TX 78401 RE: Amendment 2 Chaparral Street Phase 2 from Schatzell Street to Taylor Street (Bond 2014) E15107 Dear Mr. Edmonds, 1 At the request of the City of Corpus Christi Engineering Services, HDR has prepared a contract amendment for additional design phase effort to add 3 power pedestals to the Chaparral St. Phase 2 — Schatzell St. to Taylor St. (Bond 2014) Project No. E15107. In summary, we are requesting a total fee amount of$3,850.00 to perform the services associated with Amendment 2 to HDR's Chaparral St. Phase 2 — Schatzell St. To Taylor St. (Bond 2014) Project No. E15107 contract. The fee summary is included as Exhibit "C". Please feel free to contact us at any time to discuss as necessary. Sincerely, HDR ENGINEERING, INC. Ricardo Pedraza, P.E. Arthur B. Colwell, P.E. Project Manager Managing Principal SSJ/AF Cc: Chris Hale, P.E., City of Corpus Christi Shane Torno, P.E., City of Corpus Christi Enclosure: Exhibit "C" Fee Summary hdrinc.com 555 N.Carancahua,Suite 1600.Corpus Christi,TX 78401-0849 Texas P.E.Firm Registration No.754 (361)696-3300 AMD. NO. 2 EXHIBIT "A" Page 1 of 2 Basic Services: 1. Preliminary Phase 2. Design Phase 2.c.6 Electrical Design 3. Bid Phase 4. Construction Administration Phase (Time & Materials) 4.a. Electrical (Time & Materials) Subtotal Basic Services Fees Additional Services: 1. Permit Preparation (Authorized at NTP) 1.a.RAS (Authorized at NTP) 3. Topographic Survey and Parcel Descriptions f. Main Section (Schatzell to Taylor) (Authorized at NTP) g. Add'I Survey (Surfacing & Striping) (Authorized at NTP) 4. Environmental Issues (Authorized at NTP) 5. Public Involvement (Authorized at NTP) 5. Public Involvement (Support) 6. Subsurface Utility Investigation (Authorized at NTP) 7. Construction Observation Services 8. Warranty Phase 9. Landscaping Design (Authorized at NTP) 10. Televised Inspection of Lines Subtotal Additional Services Summary of Fees Basic Services Fees Additional Services Fees Total of Fees Exhibit C Chaparral Street from Schatzell to Taylor Project No. E15107 Contract Amd No.1 Amd No. 2 Total Contract $49,895.00 $10,497.00 $60,392.00 5346,822.00 $346,822.00 $53,152.00 $3,850.00 $57,002.00 $11,112.00 $11,112.00 $50,021.00 $50,021.00 511,102.00 511,102.00 549,895.00 $482,706.00 $3,850.00 5536,451.00 $1,031.00 $1,031.00 55,250.00 55,250.00 N/A TBD 551,491.00 551,491.00 $43,758.00 543,758.00 55,036.00 $5,036.00 54,233.00 $4,233.00 520,020.00 520,020.00 533,286.00 $33,286.00 TBD TBD $3,688.00 $3,688.00 $7,150.00 $7,150.00 TBD TBD $0.00 5174,943.00 $0.00 $174,943.00 549,895.00 5482,706.00 53,850.00 $536,451.00 $0.00 5174,943.00 $0.00 5174,943.00 $49,895.00 5657,649.00 53,850.00 $711,394.00