CITY OF CORPUS CHRISTI
AMENDMENT NO.2
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi, Texas, a Texas home-rule municipal corporation("City") and HDR Engineering, Inc.
("Architect/Engineer —NE"), agree to the following amendments to the Contract for Professional Services for
Chaparral Street Phase 2 Downtown Development Master Plan (Protect No. 151071:
Original Contract - December 29, 2015 Administrative Approval $48,895
•
Amendment No. 1 October 25, 2016 Motion No. M2016-143 _ _ 657,649
In the Original Contract, Exhibit"A", Section I. Scope of Services shall be amended as set forth in the attached
Amendment No.2, Exhibit"A".
In the Original Contract, Section III., shall be amended based on the modified scope of services in the attached
Amendment No. 2, Exhibit"A"for a fee not to exceed $3,850, for a total restated fee not to exceed $711,394.
All other terms and conditions of the October 25,2016 Amendment No. 1 to the Contract for Professional Services
between the City and Consultant, and of any amendments to that contract, which are not specifically addressed
herein shall remain in full force and effect.
CI C• " -l/S R I HDR ENGINEERING,INC.
1�r1 t I •vim / - •/7
Val:Val: H. Gray, '.E. -1 1 Date Arthur Colwell, P. E Date
Exe tive Directo :f P blic WF rk ( Vice President/Managing Principal
555 N. Carancahua, Suite 1600
Corpus Christi, TX 78401
• (361)696-3300 Office
arthurcolwell@hdrinc.com
APPROVED AS TO LEGAL FORM
u, f 2017.06.22 10:34:55-05'00'
Assistant City Attorney Date
ATTEST
tr, `7il -
C. Secrete Date Project Number E15107
• ry Accounting Unit 3551-051
Account 550950
Activity E15107013551EXP
Account Category 50950
Fund Name Street GO BOND 2016
�.eun•ueco' T naTAFYC.HANGEUNGIEKSTREET\E15107 CHAPARRAL STREET PHASE 2 DOWNTOWN DEPVELOPMENT MASTER PLANIAMENDMENT 2 H0R120151001 AMENDMENT TO
REV.10/1/15
2017_3p2
7/17/17
HDR Engineering Inc. INDEXED
FYZ
REV 01 May 25, 2017 10028053
Mr. Jeff H. Edmonds, P.E., Director of Engineering Services
City Of Corpus Christi
1201 Leopard Street
Corpus Christi, TX 78401
RE: Amendment 2
Chaparral Street Phase 2 from Schatzell Street to Taylor Street (Bond 2014)
E15107
Dear Mr. Edmonds, 1
At the request of the City of Corpus Christi Engineering Services, HDR has prepared a
contract amendment for additional design phase effort to add 3 power pedestals to the
Chaparral St. Phase 2 — Schatzell St. to Taylor St. (Bond 2014) Project No. E15107.
In summary, we are requesting a total fee amount of$3,850.00 to perform the services
associated with Amendment 2 to HDR's Chaparral St. Phase 2 — Schatzell St. To Taylor
St. (Bond 2014) Project No. E15107 contract. The fee summary is included as Exhibit
"C". Please feel free to contact us at any time to discuss as necessary.
Sincerely,
HDR ENGINEERING, INC.
Ricardo Pedraza, P.E. Arthur B. Colwell, P.E.
Project Manager Managing Principal
SSJ/AF
Cc: Chris Hale, P.E., City of Corpus Christi
Shane Torno, P.E., City of Corpus Christi
Enclosure:
Exhibit "C" Fee Summary
hdrinc.com
555 N.Carancahua,Suite 1600.Corpus Christi,TX 78401-0849 Texas P.E.Firm Registration No.754
(361)696-3300
AMD. NO. 2
EXHIBIT "A"
Page 1 of 2
Basic Services:
1. Preliminary Phase
2. Design Phase
2.c.6 Electrical Design
3. Bid Phase
4. Construction Administration Phase (Time & Materials)
4.a. Electrical (Time & Materials)
Subtotal Basic Services Fees
Additional Services:
1. Permit Preparation (Authorized at NTP)
1.a.RAS (Authorized at NTP)
3. Topographic Survey and Parcel Descriptions
f. Main Section (Schatzell to Taylor) (Authorized at NTP)
g. Add'I Survey (Surfacing & Striping) (Authorized at
NTP)
4. Environmental Issues (Authorized at NTP)
5. Public Involvement (Authorized at NTP)
5. Public Involvement (Support)
6. Subsurface Utility Investigation (Authorized at NTP)
7. Construction Observation Services
8. Warranty Phase
9. Landscaping Design (Authorized at NTP)
10. Televised Inspection of Lines
Subtotal Additional Services
Summary of Fees
Basic Services Fees
Additional Services Fees
Total of Fees
Exhibit C
Chaparral Street from Schatzell to Taylor
Project No. E15107
Contract
Amd No.1
Amd No. 2
Total Contract
$49,895.00
$10,497.00
$60,392.00
5346,822.00
$346,822.00
$53,152.00
$3,850.00
$57,002.00
$11,112.00
$11,112.00
$50,021.00
$50,021.00
511,102.00
511,102.00
549,895.00
$482,706.00
$3,850.00
5536,451.00
$1,031.00
$1,031.00
55,250.00
55,250.00
N/A
TBD
551,491.00
551,491.00
$43,758.00
543,758.00
55,036.00
$5,036.00
54,233.00
$4,233.00
520,020.00
520,020.00
533,286.00
$33,286.00
TBD
TBD
$3,688.00
$3,688.00
$7,150.00
$7,150.00
TBD
TBD
$0.00
5174,943.00
$0.00
$174,943.00
549,895.00
5482,706.00
53,850.00
$536,451.00
$0.00
5174,943.00
$0.00
5174,943.00
$49,895.00
5657,649.00
53,850.00
$711,394.00