HomeMy WebLinkAboutC2017-394 - 8/7/2017 - NA CITY OF CORPUS CHRISTI
AMENDMENT NO. 5
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City") and CP&Y, Inc.
("Consultant"), agree to the following amendments to the Contract for Professional Services for Cefe
Valenzuela Landfill Disposal Cell Interim Cover(Project No. E110611:
Original Contract January 22, 2013 _ Ordinance No. 029728 $475,465
Amendment No. 1 September 26, 2016 Administrative Approval $4,000
Amendment No. 2 December 28, 2016 Administrative Approval $5,000
Amendment No. 3 January 19, 2017 Administrative Approval $1,500
Amendment No. 4 February 3, 2017 Administrative Approval $49,500
In the Original Contract,Exhibit"A",Section I.Scope of Services shall be amended as set forth in the
attached Amendment No. 5, Exhibit"A".
In the Original Contract, Section III. shall be amended based on the modified scope of services in the
attached Amendment No. 5, Exhibit"A"for a fee not to exceed $45,000,for a total restated fee not to
exceed $580,465.
All other terms and conditions of the January 22,2013 Contract for Professional Services between the
City and Consultant, and of any amendments to that contract, which are not specifically addressed
herein shall remain in full force and effect.
CITY OF CORPUS CHRISTI CP&Y,INC.
C ' 1 V7/17
7 /Zgi7
Margie C. Rose Date David Hays 4 Date
City Manager CFO/Principal
1820 Regal Row, Suite 200
Dallas, TX 75235
(214) 638-0500 Office
RECOMMENDED
Ma an Vteck Y:izt
te
Assistant-City `:n:ger
J (-97
i , 3 � 7
Vale a H. Gr- , P.: . Da e
Ex tive Director .1 Public Works
2017-394
8/07/17
WASTE'E11061 CEFE VALENZUELA LANDFILL DISPOSAL CELLS INTERIM COVERLAMENDMENT 5 CPYIAMENOMENT
10/1/15REV
CP&Y Inc.
INDEXED
•
APPROVED AS TO LEGAL FORM
� � " Aimee Alcorn-Reed
2017.07.26 17:14:24-05'00'
Assistant City Attorney Date
A u ST
�._ .Z-14EL S/i l// 1
City "',cretary Date
Project No. E11061
Accounting Unit:4010-31010-062
Account 530000
Activity: E17050-01-4010-EXP
Account Category: 30000
Fund Name: Water Fund
Encumbrance No.
KIENGINEERING DATAEXCNANOEVNGIEM\SOLID WAST E1E 11087 CE FE VALENZUELA LANDFILL DISPOSAL CELLS INTERIM COVERLAI ENOMENT 5 C' ME NOME N7
NOS DOC REV.10/1,15
•
Q Partners for a Better Quality of Life
VC �:�
July 12, 2017
Mr. Lawrence Mikolajczyk via e-mail & US Mail
Director of Solid Waste Services
City of Corpus Christi
P.O. Box 9277
Corpus Christi, TX 78469
Re: E11061 Cefe Valenzuela Landfill Disposal Cells Interim Cover
Proposal — Planning / Monitoring / Reporting
Cefe F. Valenzuela Landfill - MSW Permit 2269
Temporary Authorization: Staging, Processing, Storage Area and Use of Water
Treatment Plant Residuals as Alternative Daily Cover
Dear Mr. Mikolajczyk:
As requested by the City, CP&Y, Inc. (CPY), respectfully submits this proposal to
provide Engineering Services in connection with the operation of the Cefe F. Valenzuela
Landfill. The proposed Scope of Services includes the following.
Scope of Services
CP&Y will provide, on behalf of the City of Corpus Christi, and in accordance with the
requirements stated in the TCEQ approval letter of May 18, 2017:
• TCEQ Notifications
On behalf of Corpus Christi Solid Waste Operations, CP&Y will prepare a letter to
the TCEQ Region 14 office to notify of the use of the ADC materials. The letter
must be submitted to the TCEQ Region 14 office at least 10 days prior to the use
of the ADC materials, to allow TCEQ inspection and monitoring of the ADC
performance during the trial period.
• ADC Operating Plan
CP&Y will prepare an operating plan describing the blending and use of the ADC.
The plan will be prepared with input from Corpus Christi Solid Waste Operations
staff, with consideration of equipment availability and limitations, operations
details, schedule preferences, and other relevant factors. The operating plan will
include:
1820 Regal Row,Suite 200
Dallas,Texas 75235
214.638.0500•214 638.3723 fax
www.cpyi.com . NO. 5
HIBIT "A"
Page 1 of 3
Partners for a Better Quality of Life
su
1) A description and minimum thickness of the ADC material to be used;
2) The effect of the ADC on vectors, fires, odors, and windblown litter and waste;
3) The application and operational methods to be utilized at the site when using
the ADC;
4) Chemical analysis of the ADC materials;
5) Any other pertinent characteristic, feature, or other factors related to the use
of the ADC.
The initial Operating Plan will be developed prior to blending of ADC materials or
deployment of ADC. The Operating Plan will also include the frequency, sample
method(s), and appropriate chemical analysis of the ADC. Changes will be made
as needed during the first two months of operations, and the Operating Plan will
be submitted to TCEQ with the second two-month status report.
• Monthly Site Inspections and Monitoring Reports (Initial 6 Months)
During the initial 6 month period of the Temporary Authorization, CP&Y will make
monthly site visits to observe and provide feedback Corpus Christi Solid Waste
Operations as appropriate on methods and efficiencies, process modifications,
any associated safety or compliance concerns, and other related operations
issues. CP&Y will also prepare and submit the two-month status reports required
by TCEQ during the first 6 month period.
• TCEQ Extension Letter
Subject to a successful initial trial period, on behalf of Corpus Christi Solid Waste
Operations, CP&Y will prepare a request to TCEQ for a six month extension of
the trial period.
• Monthly Site Inspections and Monitoring Reports (Additional 6 Months)
Following the initial 6 month period and TCEQ approval for a six month
extension of the Temporary Authorization, CP&Y will make monthly site visits to
observe and provide feedback Corpus Christi Solid Waste Operations as
appropriate on methods and efficiencies, process modifications, any associated
safety or compliance concerns, and other related operations issues. CP&Y will
also prepare and submit the two-month status reports required by TCEQ during
the 6 month extension.
Deliverables and Proposed Fee
The deliverables for this project will be the notifications, reports, letters documents as
described above.
1820 Regal Row,Suite 200
Dallas,Texas 75235
214.638.0500 214.638.3723 fax
www.cpyi.com . NO. 5
HIBIT "A"
Page 2 of 3
•
CPartners for a Better Quality of life
P&YJ.
The deliverables may be utilized in preparation for modification of the operating permit
for the Cefe Valenzuela Landfill if the City of Corpus Christi chooses to continue the use
of WTR/Mulch Blend as an Alternative Daily Cover.
For the work efforts to be performed by CP&Y, as noted above, we propose to be paid a
lump sum fee of$45,000. The fee is based on the time requirements and billing rates of
the CP&Y staff. The CP&Y staff expected to be used for the project are:
Tewobista Metaferia, P.E.
T. Halliburton "Hal" Wood, P.E.
William R. Hindman, P.E.
The fee for each of the items listed in the Scope of Services is provided below.
TCEQ Notification $1,000
ADC Operating Plan $2,500
Monthly Site Inspections (6 months) $2,750/Inspection
Two-Month Reports (3) $1,250/Report
TCEQ Extension Request $1,000
Monthly Site Inspections (+ 6 months) $2,750/Inspection
Two-Month Reports (3) $1,250/Report
CP&Y expects to make an initial site visit as the initial ADC Operating Plan is
developed. CP&Y believes monthly site visits, normally 1/2a day on-site will provide
significant value to the Corpus Christi Solid Waste Operations. We appreciate the
opportunity to continue assistance to the City of Corpus Christi Solid Waste
Department.
Sincerely,
CP&Y, Inc.
. 4J
T. Halliburton "Hal" Wood, P.E.
Solid Waste Group Manager
c: Ivan Luna
Tony Benevides
Brian D. Bresler, P.E.
Bill Hindman
Tewobista Metaferia
1820 Regal Row,Suite 200
Dallas,Texas 75235
214 638.0500 214.638.3723 fax
www.cpyi.com D. NO. 5
HIBIT "A"
Page 3 of 3