HomeMy WebLinkAboutC2017-406 - 9/7/2017 - NA TASK ORDER NO. 8B
This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus
Christi, Texas (City) and LNV, Inc. (Consultant) dated August 16, 2016 (Agreement). Consultant shall perform
services on the project described below as provided in this Task Order and in the Agreement. This Task Order
shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall
supplement the Agreement as it pertains to the project described below.
PROJECT NAME/NUMBER: Water and Wastewater Treatment On-Call Support, E16264
1. PROJECT DESCRIPTION—This project provides the Utility Department with on-call services to assist with
any technical,operational, maintenance, diagnostic and design concerns for the City's O.N. Stevens Water
Treatment Plant and six wastewater treatment plants.
2. SCOPE OF SERVICES — Planning Level Assessment of Power & Substation Capacity for Future
Disinfection System
3. COMPENSATION The total amount not to exceed for Task Order No. 8B only is $4,325.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement
remain in full force and effect.
CITY 0 CO- • - CHRISTI LNV, INC.
)►► /
4 7 �,. ��W _ 1344-17
eff H. Edmonds, P.E. a Dan S. Leyendecker, '.E. Date
Director of Engineering Services President
801 Navigation, Suite 300
Corpus Christi, TX 78408
(361)883-1984 Office
loganb@Invinc.com
Fund Name Accounting Unit Account No. Activity No. Amount
Water 2015 CIP 4096-062 550950 E16264-01-4096-EXP $4,325
2017-406
9/07/17
LNV Inc.
INDEXED
•
City Project No. E16264
Professional Services Contract
City of Corpus Christi
Water/Wastewater Treatment On-Call Support
Supplemental Task Authorization No. 8B - Planning-level
Assessment of Power & Substation Capacity for Future
Disinfection System
August 9, 2017
ULNA/
Task Order No. 8B
Exhibit A
Page 1 of 5
f
LNV _
SCOPE OF WORK
Project No. E16264
Water and Wastewater Treatment On-Call Support
Supplemental Task Authorization No. 813 - Planning-level Assessment of Power&
Substation Capacity for Future disinfection System
OUTLINE OF SCOPE OF WORK UNDER TASK AUTHORIZATION NO.8
The purpose of Task Authorization No.8 is to provide assistance to the City staff by performing a planning-
level assessment of the existing chlorine gas system. the task authorization also allows for the comparison
of various alternative disinfection strategies to develop a long-term strategy in order to meet anticipated
future disinfection needs at ONSWTP.
At the end of this assessment,the Engineer will deliver a technical memorandum to the City with findings
of the planning level assessment, steps to address immediate needs of the existing system, cost estimates
and comparison of various alternative disinfection strategies along with a recommended disinfection
strategy for the future.
OUTLINE OF SCOPE OF WORK UNDER SUPPLEMENTAL TASK AUTHORIZATION
NO.8B
To achieve the original goal under task authorization No. 8 and provide a comprehensive cost estimate for
• all the disinfection.alternatives, the electrical needs of the recommended long-term alternatives are being
evaluated. To ensure that it is possible for ONSWTP to meet these electrical needs of the recommended
alternative disinfection systems, it is necessary to evaluate the power and substation capacity of the plant.
The purpose of this supplemental task authorization is to provide assistance to the City staff by performing
a planning-level assessment of the existing power and substation capacity and its ability to support the
proposed disinfection system alternatives.This assessment will include a basic evaluation of the immediate
power needs of the gas system to ensure reliability and safety. Along with this assessment. this task
authorization will address the development of a preliminary scope and estimate for required power systems
upgrades to support the new facilities.
ADDITIONAL SERVICES:
ITEM 9—General Engineering
The Engineer will perform the following:
I. Assess the proposed disinfection systems power needs based on equipment and
loading.
2. Assess the existing City owned electrical substation in regards to capacity to support
the operation of the proposed alternative disinfection systems.
3. Assess the backup generator capacity for the additional load.
4. Summarize power requirements for the following alternative disinfection
technologies, which will be evaluated in the development of the long-term
disinfection strategy
Task Order No. 8B
Exhibit A
Page 2 of 5
s�y
LNVat,ps,
} h
• Chlorine gas
• On-site chlorine generation
• Bulk sodium hypochlorite
• 1-ton chlorine cylinders(for back-up)
• Any combination of the previously-mentioned methods
DELIVERABLES
The Engineer will prepare a DRAFT memorandum for the City's review and comment. The
memorandum will provide the findings of the planning level assessment, including a determination of the
immediate power needs of the gas system,and the long-term disinfection strategy.The memorandum will
also provide a high level capital cost estimate for the immediate power needs for the gas system and the
long-term disinfection strategy identified under task authorization No. 8.
Upon receipt of comments, the Engineer will incorporate the comments and submit one (1)
hard copy and one (1) electronic copy of the FINAL memorandum.
SCHEDULE
The Engineer's services shall be performed in a timely manner consistent with sound professional practices.
The Engineer will complete the work according to the following schedule:
Activity Completion Date
Contract Execution-Notice to Proceed(NTP) TBD
Item 9-General Engineering
• DRAFI Memorandum and Cost Estimate I weeks atter NIP
• FINAL Memorandum and Cost Estimate 3 weeks after NTP
The time limits set forth in the schedule shall include allowances for reasonable and expected review time
by the City and approval by authorities having jurisdiction over this project, and shall not be allowed as
cause for delay or adjustments to the schedule. Delays caused by review times by the City exceeding those
anticipated by the Engineer's schedule are cause for adjustments in the schedule. Any adjustments made
to the agreed upon schedule shall be made in writing and accepted by both parties.
The Engineer shall begin work immediately upon receipt of the executed Task Authorization and/or Notice
to Proceed(written or emailed).
FEE
The services will be provided on a Time and Materials (T&M) basis as the project is moved towards
completion. The original amount assigned for Task Authorization No. 8 was $61,380. An additional
anticipated amount for this supplemental task authorization is $4325, as shown in ATTACHMENT A,
which amounts to a new total fee of S65,705. If the level of effort exceeds this estimate, a separate task
authorization will be requested.
Task Order No. 8B
Exhibit A
Page 3 of 5
•
$? $C446
LNV
TASK AUTHORIZATION MANAGER
The Task Authorization Manager will be the primary contact person during the performance of this work.
All correspondence or inquiries should be addressed to the Task Authorization Manager. This work task
will be coordinated by:
Dan Grimsbo, P.E. A.I.C.P.
Executive Director of Utilities Department
City of Corpus Christi
Office: 361-826-1874
Fax: 361-826-1889
Email: DanGcctexas.com
APPROVAL
The undersigned has reviewed and approved this Task Authorization and recommends LNV. Inc. to
perform the work as presented:
Recopfi nded by:
( 4051111/
D4 1 (-/?/,)78 1 (Printed Name)
5I/9/ (Date)
Task Order No. 8B
Exhibit A
Page 4 of 5
Attachment A
Man-hour and Fee Analysis
Table 1: Task Authorization No. 8 (Authorized)
Task
LNV Inc.
D60aiption
Su Moat
Pdndpal/VO
Prot en Atr
Expenses
Pitted lnpin2er ll
E1TII
StCAD TKO
5 2155;:_.
CAD
Te:^.
Adnlr.rc,:
TOTALS
5
195.00
$ 193.00
Sub -total
5
16500
5 105.00
S 90.00
5
60.0)
Total H•s.
Taal fee
General Engineering
Ho.
S14xtd
Hn.
Subtotal
11n.
1 ubtaul
Hn.
3ubtaty
Hn.
Stb•toul
- 1.32530
Hn.
Subtotal
$ -
ITEM 2
Permitting and Regulatcry
$
5
r
5 1.570
$ 330.00
20
5 1.303
IS
5 262:
5 •
5
s 4os.s0
se
- 1943:_
ITEM 9
General Engineerin;
iso
; sn•so
St.
5 4247
74S)
:,
WO
S :.620
5 ;.lx)
s 2.!5` -,
711
:(,; ,
S 14$30.00
Sub -totals
S 190
rt
5 4,560
76
S 12.540
0;
S 9.971
1A
43
S 1,230
S 2,645.00
Hazen and Sawyer
_..._043 MAI M1pVr
$ 309.00:..
Oro F3,204413
$ 285.00
$31,90ati [rem' 5r Pimp IjErcineir A;sl;ti efE.1
1414* $., ,1 4X1
5 104.00
Hn.
n.
Mrs.
H
ITEM 2
Permitting and Regulatory
S
783
972
10
ITEM 9
General Engineering
409
3
76
5 4.712
Table 2: Supplemental Task Authorization No. 8B (Proposed)
43
5 1.52)
5 619) 07 5 9.2)2
:7 S :.110
amnia:
___---_TOTALS ..__.__
Su Moat
Tcal H's..
Tay fee
Expenses
Admin Fee
TOTALS
.60
5 2155;:_.
•
1S7
5 16.4s9.09
LNV Inc.
Description
Principal/VP
Project Mgr.
Project Engineer
EIT II
Expenses
Admin Fee
TOTALS
$ 195.00
$ 190.00
$ 165.00
$ 105.00
Total Hrs.
Total Fee
Hrs.
Sub -total
Hrs.
Sub -total
Hrs.
Sub -total
Hrs.
Sub -total
Sub -total
Sub -total
General Engineering
s
5
5
3
5 3:5
5 3304.
- 1.32530
Subtotals
$ -
2
$ 380
$
3
$ 315
$ 330.00
5
$ 1,025.00
Bath Engineering
Descrip
General Engineering
Sr. Engineer
165.00
Engineer
155.00
Sr. Designer
120.00
Jr. Designer
$ 95.00
Expenses
otal
total
TOTALS
Total Hrs. Total Fee
20 $ 3,300.03
Task Order No. 8B
Exhibit A
Page 5 of 5
4,325.00
New Fee Total (Table 1+ Table 2) = $65,705
EXHIBIT B
TASK ORDER SUMMARY
MASTER SERVICE AGREEMENT
WATER AND WASTEWATER ON-CALL SUPPORT
PROJECT NO. E16264
NOT TO
TASK ORDER EXCEED
DESCRIPTION AMOUNT AMOUNT
Original Contract(June 2, 2016) $35,000
Amendment No. 1 Master Service Agreement(August 16,2016) $600,000
Maximum Contract Amount $635,000
TASK ORDERS:
Task Order No. 1 $14,914
Greenwood Wastewater Treatment Plant Generator Sizing
Task Order No. 2 $14,575
Whitecap Wastewater Treatment Plant South Clarifier Scum System Rehab
Task Order No. 3 $24,350
Electrical Support for ONSWTP Intermediate Sludge Removal Phase 1
Task Order No.4 $167,588
Water System Operations Monitoring and Support
Task Order No.5 $33,524
Public Communication on City-Wide Water Quality
Task Order No.58 $10,996
Public Communication on City-Wide Water Quality
Task Order No.6 $21,373
Monthly Water Quality Mtgs and Alt ONSWTP Residuals Mgmt Evaluation
Task Order No. 7 $45,792
Implementation and Administration of General Engineering Services
Task Order No.8 $61,380
Planning Level Assessment of ONSWTP Chlorine Gas System
Task Order No.8B $4,325
Planning Level Assessment of Power&Substation Capacity for Future Disinfection System
Task Order No. 9 $7,052
ONSWTP Facilities Optimization Plan Update
Task Order No. 10 $13,332
Distribution System Control Strategy
Task Order No. 11 $7,090
Foundation Design&Windstorm Inspection/Certification for FRP Bldg at ONSWTP
Task Order No. 14 16,800
Hydraulic Modeling of 48-inch Transmission Main Closures
Task Order No. 15 13,050
Development of Wastewater Capital Improvement Program FY 2018-2022
Task Order Total $456,141
Amount Remaining on Contract $178,859