HomeMy WebLinkAboutC2017-411 - 9/8/2017 - NA • • CITY OF CORPUS CHRISTI AMENDMENT NO.4 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas,a Texas home-rule municipal corporation ("City")and HDR Engineering,Inc. ("Consultant"),agree to the following amendments to the Contract for Professional Services for Chaparral Street Signalization for Two Way Conversion—Taylor Street Signal Improvements(Project No. 6510): Original Contract _ September 27, 2011 Motion No. M2011-206 $97,250 Amendment No. 1 March 20,2012 Motion No. M2012-053 $147,000 Amendment No. 2 November 12, 2014 Administrative Approval _ $48,850 Amendment No. 3 January 16,2015 Administrative Approval $39,500 In the Original Contract, Exhibit A, Scope of Services shall be amended as set forth in the attached Amendment No.4, Exhibit A. In the Original Contract,Exhibit A,Fees shall be amended based on the modified scope of services in the attached Amendment No. 4, Exhibit A for a fee not to exceed 10, for a total restated fee not to exceed $332,600. All other terms and conditions of the September 27,2011 Contract for Professional Services between the City and Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPU CHRISTI HDR ENGINEERING,INC. til , • iti6:817 / 71,7 % Arthur B. Colwell, P.E. Date !lerie H. a -y, ".E. Date Vice President/Managing Principal Executive Direct•r of Public Works 555 N. Carancahua, Suite 1600 Corpus Christi,TX 78401 APPROVED AS TO LEGAL FORM (361)696-3300 Office )/ arthurcolwell@hdrinc.com 61/( Ai.-- . 2017.08.22 16:24:30-05'00' Assistant City Attorney Date ATTEST Cit Secretary Date 4111 2017-411 'ETS16510 DOWNTOWN CHAPARRAL STREETIHORMMENOMENT NO MCONTRACT DOC REV lOrirl5 9/08/17 HDR Engineering Inc. INDEXED REV 02 August 10, 2017 10017643 REV 01 July 19, 2017 REV 00 May 12, 2017 Mr. Jeff H. Edmonds, P.E., Director of Engineering Services City Of Corpus Christi 1201 Leopard Street Corpus Christi, TX 78401 RE: Amendment 4 Chaparral Street Signalization for Two Way Conversion —Taylor Street Signal Improvements (Project No. E6510) Dear Mr. Edmonds, At the request of the City of Corpus Christi Engineering Services, HDR will utilize the previously authorized funds from amendment #3 for the Chaparral Street Signalization for two way Conversion (Project No. E6510) to amend the contract to relocate the traffic signals at the Taylor intersection for Chaparral St. Phase 2 — Schatzell St. to Taylor St. (Bond 2014) Project No. E15107. The revised locations of the traffic signal poles and related equipment will accommodate the revised intersection curb radii. The City requested HDR to revise the intersection curb radii at Taylor Street to accommodate the Single Unit 30 Truck's turn movements. Since the City is repurposing the funds from amendment #3 Chaparral Street Signalization for two way Conversion (Project No. E6510) the original scope of services from said amendment providing an "optimized signal timing plan" will be removed from the contract. When an "optimized signal timing plan" for the Chaparral Street two way signals is required by the City, HDR will submit an amendment to replenish the funds required to perform this service at the City's request. The scope for amendment #4 Project No. E6510 consists of the design effort to provide plans, specifications, and estimate to relocate the Taylor St. intersection signals as described above. The man-hour estimate for the Taylor St/ Chaparral signal design is included as Exhibit "B". No fee summary is included as part of this amendment since no additional funds are being requested. The City's correspondence authorizing HDR to invoice amendment #3 of Chaparral Street Signalization for two way Conversion (Project No. E6510) is included for your convenience. The additional fees associated with the Taylor St. signal relocation is as follows: hdrinc.com Amend. No. 4 555 N.Carancahua.Suite 1600,Corpus Christi,TX 78401-0849 Texas P.E.Firm Registration No.754 Exhibit A (361)696-3300 Page 1 of 2 • • • Mr.J.H.Edmonds,P.E. Amendment 4 10017643 Chaparral Street Signalization for two way Conversion(Project No.E6510) 1. Amendment#3 (Lump Sum) $ -15,459.00 2. Amendment#4(Lump Sum) $ +15,459.00 3. Bid Phase (Not Applicable) $ 0.00 4. Construction Administration (Not Applicable) $ 0.00 Total Add'I Fees Required for Chaparral Amendment 4 = $ 0.00 In summary, we will relocate $15,459.00 from amendment#3 to Amendment#4 to perform the services described above for HDR's Chaparral St. Phase 2-Schatzell St. To Taylor St. (Bond 2014) Project No. E15107 contract. No additional funds are being requested. This is a "zero- dollar" scope change amendment. Please feel free to contact us at any time to discuss as necessary. Sincerely, HDR ENGINEERING, INC. (7). Z,j-i7fryfrpf, Ricardo Pedraza, P.E. Arthur B. Colwell, P.E. Project Manager Managing Principal SSJ/AF Cc: Chris Hale, P.E., City of Corpus Christi Shane Torno, P.E., City of Corpus Christi Enclosure: Exhibit"B" Man-hour Estimate Exhibit "C" Fee Summary City's Authorization to Invoice Amend. No.4 Exhibit A 555 N.Carancahua,Suite 1600,Corpus Christi.TX 78401-0849 Page 2 of 2 P Texas P.E. Firm Registration No.754 (361)696-3300 Page 2 of 2