Loading...
HomeMy WebLinkAboutC2017-435 - 9/17/2017 - NA a * • 1 CITY OF CORPUS CHRISTI CONTRACT FOR PROFESSIONAL SERVICES FOR PROJECT (No./Name) E17068 CEFE VALENZUELA LANDFILL GAS SYSTEM OM&M The City of Corpus Christi, a Texas home rule municipal corporation, P.O. Box 9277, Corpus Christi, Nueces County, Texas 78469-9277 (City) acting through its duly authorized City Manager or Designee (Director) and SCS Engineers, Inc., a Virginia corporation, 1901 Central Drive, Suite 550, Bedford, Tarrant County, Texas 76021, (Consultant), hereby agree as follows: TABLE OF CONTENTS ARTICLE NO. TITLE PAGE ARTICLE I SCOPE OF SERVICES 2 ARTICLE II QUALITY CONTROL 3 ARTICLE III COMPENSATION 3 ARTICLE IV TIME AND PERIOD OF SERVICE 4 ARTICLE V OPINIONS OF COST 5 ARTICLE VI INSURANCE REQUIREMENTS 5 ARTICLE VII INDEMNIFICATION 5 ARTICLE VIII TERMINATION OF AGREEMENT 6 ARTICLE IX RIGHT OF REVIEW AND AUDIT 7 ARTICLE X OWNER REMEDIES 7 ARTICLE XI CONSULTANT REMEDIES 8 ARTICLE XII CLAIMS AND DISPUTE RESOLUTION 8 ARTICLE XIII MISCELLANEOUS PROVISIONS 10 EXHIBITS 2017-435 9/17/17 SCS Engineers Inc. Page 1 Rev.17-9 E17%8 CEFE VALENZUELA LANDFILL GAS SYSTEM OMEM\2017 0901 CONTRACT PROFESSIONAL SERVICES DOC INDEXED 1 F I ARTICLE I —SCOPE OF SERVICES 1.1 The Consultant shall provide to Engineering Services its Scope of Services,to be incorporated herein and attached to this Agreement as Exhibit A. The Scope of Services shall include all associated services required for Consultant to provide such Services, pursuant to this Agreement, and any and all Services that would normally be required by law or common due diligence in accordance with the standard of care defined in Article XIII of this Agreement. The approved Scope of Services defines the services to be performed by Consultant under this Agreement. 1.2 Consultant shall follow City Codes and Standards effective at the time of the execution of the contract. At review milestones, the Consultant and City will review the progress of the plans to ensure that City Codes and Standards are followed unless specifically and explicitly excluded from doing so in the approved Scope of Services attached as Exhibit A. A request made by either party to deviate from City standards after the contract is executed must be in writing. 1.3 Consultant shall provide labor,equipment and transportation necessary to complete all services agreed to hereunder in a timely manner throughout the term of the Agreement. Persons retained by Consultant to perform work pursuant to this Agreement shall be employees or subconsultants of Consultant. Upon request, Consultant must provide City with a list of all subconsultants that includes the services performed by subconsultant and the% of work performed by subconsultant(in dollars). Changes in Consultant's proposed team as specified in the SOQ or Scope of Services must be agreed to by the City in writing. 1.4 Consultant shall not begin work on any phase/task authorized under this Agreement until they are briefed on the scope of the Project and are notified in writing to proceed. If the scope of the Project changes, either Consultant or City may request a review of the changes with an appropriate adjustment in compensation. 1.5 Consultant will provide monthly status updates (project progress or delays) in the format requested by the City with each monthly invoice. 1.6 For design services, Consultant agrees to render the professional services necessary for the advancement of the Project through Final Completion of the Construction Contract. Consultant acknowledges and accepts its responsibilities, as defined and described in City's General Conditions for Construction Contracts,excerpt attached as-Exhibit-F. 1.6.1 The Consultant agrees to serve as the City's Designer as defined in the General Conditions and will consult and advise the City on matters related to the Consultants Scope of Services during the performance of the Consultant's services. 1.6.2 The Consultant agrees to prepare plans, specification, bid and contract documents and to analyze bids and evaluate the documents submitted by bidders. 1.6.3 The Consultant agrees to assist the City in evaluating the qualifications of the prospective contractors, subcontractors and suppliers. 1.7 For projects that require subsurface utility investigation: 1.7.1 The Consultant agrees to prepare and submit to the City prior to the 60% submittal a signed and sealed report identifying all utilities within the project area at the Quality Level specified in Exhibits AaA 4. It is assumed that all utilities will be identified using Quality Level A exploratory excavation unless stated otherwise. 1.7.2 Utilities that should be identified include but are not limited to utilities owned by the City, local franchises, electric companies, communication companies, private pipeline companies and 3r° party owners/operators. Page 2 Rev.17-9 K:%ENGINEERING DATAEXOHANGE'ANGIEMSOLID WASTE\E17058 CEFE VALENZUELA LANDFILL GAS SYSTEM OM&M120170S07 CONTRACT PROFESSIONAL SERVICES DOC • 1.8 For project with potential utility conflicts: 1.8.1 The Consultant agrees to coordinate the verification and resolution of all potential utility conflicts. 1.8.2 The Consultant agrees to prepare and submit a monthly Utility Coordination Matrix to the City. 1.9 The Consultant agrees to complete the Scope of Services in accordance with the approved project schedule and budget as defined in Exhibit A, including completing the work in phases defined therein. ARTICLE II —QUALITY CONTROL 2.1 The Consultant agrees to perform quality assurance-quality control/constructability reviews(QCP Review). The City reserves the right to retain a separate consultant to perform additional QCP services for the City. 2.2 The Consultant will perform QCP Reviews at intervals during the Project to ensure deliverables satisfy applicable industry quality standards and meet the requirements of the Project scope. Based on the findings of the QCP Review, the Consultant must reconcile the Project Scope and the Opinion of Probable Cost (OPC), as needed. 2.3 Final construction documents that do not meet City standards in effect at the time of the execution of this Agreement may be rejected. If final construction documents are found not to be in compliance with this Agreement, Consultant will not be compensated for having to resubmit documents. ARTICLE III —COMPENSATION 3.1 The Compensation for all services (Basic and Additional) included in this Agreement and in the Scope of Services for this Agreement shall not exceed $37,385. 3.2 The Consultant's fee will be on a lump sum or time and materials(T&M) basis as detailed in Exhibit A and will be full and total compensation for all services and for all expenses incurred in performing these services. Consultant shall submit a Rate Schedule,as-show:kg-Exhibit-B-1,with their proposal. City and Consultant agree that the Rate Schedule is considered confidential information that may be excluded from public disclosure under Texas Government Code Chapter 552 as determined by the Texas Attorney General. 3.3 The Consultant agrees to complete the Scope of Services in accordance with the approved project schedule and budget as defined in Exhibit A, including completing the work in phases defined therein. 3 4 The Director of Engineering Services may request the Consultant to undertake additional services or tasks provided that no increase in fee is required. Services or tasks requiring an increase of fee will be mutually agreed and evidenced in writing as an amendment to this contract. Consultant shall notify the City within three(3)days of notice if tasks requested requires an additional fee. 3.5 Monthly invoices will be submitted in accordance with the Payment Request as shown in Exhibit B. Each invoice will include the Consultant's estimate of the proportion of the contracted services completed at the time of billing. For work performed on a T&M Basis,the invoice shall include documentation that shows who worked on the Project, the number of hours that each individual worked, the applicable rates from the Rate Schedule and any reimbursable expenses associated with the work. City will make prompt monthly payments in response to Consultant's monthly invoices. 3.6 Principals may only bill at the agreed hourly rate for Principals (as defined in the Rate Schedule) when acting in that capacity. Principals acting in the capacity of staff must bill at applicable staff rates. Page 3 Rev.17-9 K\ENGINEERING DATAE%CHANGENNGIEM1SOLID WASTE1E17069 LEFE VALENZUELA LANDFILL GAS SYSTEM OM&MW17 0907 CONTRACT PROFESSIONAL SERVICES DOC r a I 3.7 Consultant certifies that title to all services covered by a Payment Request shall pass to City no later than the time of payment. Consultant further certifies that, upon submittal of a Payment Request, all services for which Payment Requests have been previously issued and payments received from City shall,to the best of Consultant's knowledge, information and belief, be free and clear of liens,claims, security interests or encumbrances in favor of Consultant or other persons or entities making a claim by reason of having provided labor or services relating to this Agreement. CONSULTANT SHALL INDEMNIFY AND HOLD CITY HARMLESS FROM ANY LIENS, CLAIMS, SECURITY INTERESTS OR ENCUMBRANCES FILED BY ANYONE CLAIMING BY,THROUGH OR UNDER THE ITEMS COVERED BY PAYMENTS MADE BY CITY TO CONSULTANT. 3.8 The final payment due hereunder shall not be paid until all reports, data and documents have been submitted, received, accepted and approved by City. Final billing shall indicate "Final Bill — no additional compensation is due to Consultant." 3.9 City may withhold compensation to such extent as may be necessary, in City's opinion,to protect City from damage or loss for which Consultant is responsible, because of: 3.9.1 delays in the performance of Consultant's work; 3.9.2 failure of Consultant to make payments to subconsultants or vendors for labor, materials or equipment; 3.9.3 damage to City; or 3.9.4 persistent failure by Consultant to carry out the performance of its services in accordance with this Agreement. 3.10 When the above reasons for withholding are removed or remedied by Consultant, compensation of the amount withheld shall be made within 30 days. City shall not be deemed in default by reason of withholding compensation as provided under this Agreement. 3.11 In the event of any dispute(s) between the Parties regarding the amount properly compensable for any phase or as final compensation or regarding any amount that may be withheld by City, Consultant shall be required to make a claim pursuant to and in accordance with the terms of this Agreement and follow the procedures provided herein for the resolution of such dispute. In the event Consultant does not initiate and follow the claims procedures as required by the terms of this Agreement, any such claim shall be waived. 3.12 Request of final compensation by Consultant shall constitute a waiver of claims except those previously made in writing and identified by Consultant as unsettled at the time of final Payment Request. 3.13 All funding obligations of the City under this Agreement are subject to the appropriation of funds in its annual budget.The.City.may direct the Consultant to suspend work pending receipt and appropriation of funds. The right to suspend work under this provision does not relieve the City of its obligation to make payments in accordance with section 3.5 above for services provided up to the date of suspension. ARTICLE IV—TIME AND PERIOD OF SERVICE 4.1 This Agreement shall be effective upon the signature of the City Manager or designee (Effective Date). 4.2 aper-eyed-changes Page4 Rev. 17-9 K ENGINEERING DATAEXCHANGE ANGIEMISOLID WASTEIE170E9 CEFE VALENZUELA LANDFILL GAS SYSTEM OMAMQ017 0907 CONTRACT PROFESSIONAL SERVICES DOC • 4.3 The Consultant agrees to begin work on those authorized Services for this contract upon receipt of the Notice to Proceed from the Director of Engineering Services. Work will not begin on any phase or any Additional Services until requested in writing by the Consultant and written authorization is provided by the Director of Engineering Services. 4.4 Time is of the essence for this Agreement. Consultant shall perform and complete its obligations under this Agreement in a prompt and continuous manner so as to not delay the Work for the Project, in accordance with the schedules approved by City. The Consultant and City are aware that many factors may affect the Consultants ability to complete the services to be provided under this agreement. The Consultant must notify the City within ten business days of becoming aware of a factor that may affect the Consultant's ability to complete the services hereunder. 4.5 City shall perform its obligations of review and approval in a prompt and continuous manner so as to not delay the project. 4.6 This Agreement shall remain in force for a period which may reasonably be required for completion of the Project, including any extra work and any required extensions thereto, unless terminated as provided for in this Agreement. For construction design services, "completion of the Project" refers to acceptance by the City of the construction phase of the Project, i.e., Final Completion. ARTICLE V—OPINIONS OF COST 5.1 The Opinion of Probable Cost (OPC) is computed by the Consultant and includes the total cost for construction of the Project. 5.2 The OPC does not include the cost of the land, rights-of-way or other costs which are the responsibility of the City. 5.3 Since Consultant has no control over a construction contractor's cost of labor, materials or equipment, or over the contractor's methods of determining prices, or over competitive bidding or market conditions, Consultant's opinions of probable Project Cost or Construction Cost provided herein are to be made on the basis of Consultant's experience and qualifications and represent Consultant's best judgment as a design professional familiar with the construction industry, but Consultant cannot and does not guarantee proposals, bids or the construction cost shall not vary from the OPC prepared by Consultant. ARTICLE VI — INSURANCE REQUIREMENTS 6.1 Consultant must not commence work under this Agreement until all insurance required has been obtained and such insurance has been approved by the City. Consultant must not allow any subcontractor to commence work untilall similar insurance required of any subcontractor has been obtained. 6.2 Insurance Requirements are shown in EXHIBIT C. ARTICLE VII — INDEMNIFICATION Consultant shall fully indemnify and hold harmless the City of Corpus Christi and its officials, officers,agents, employees, excluding the engineer or architect or that person's agent,employee or subconsultant, over which the City exercises control ("Indemnitee")from and against any and all claims,damages, liabilities or costs, including reasonable attorney fees and court costs,to the extent that the damage is caused by or results from an act of negligence, intentional tort, intellectual property infringement or failure to pay a subcontractor or supplier committed by Page 5 Rev. 17-9 K:%ENGINEERING OATAEXCHANGELWGIEM SOLID WASTEIE17Q8 CEFE VALENZUELA LANDFILL GAS SYSTEM OM&MQ0170907 CONTRACT PROFESSIONAL SEERVICES.DOC Consultant or its agent, Consultant under contract or another entity over which Consultant exercises control while in the exercise of rights or performance of the duties under this agreement.This indemnification does not apply to any liability resulting from the negligent acts or omissions of the City or its employees, to the extent of such negligence. Consultant shall defend Indemnitee, with counsel satisfactory to the City Attorney, from and against any and all claims, damages, liabilities or costs, including reasonable attorney fees and court costs, if the claim is not based wholly or partly on the negligence of, fault of or breach of contract by Indemnitee. If a claim is based wholly or partly on the negligence of, fault of or breach of contract by Indemnitee,the Consultant shall reimburse the City's reasonable attorney's fees in proportion to the Consultant's liability. Consultant must advise City in writing within 24 hours of any claim or demand against City or Consultant known to Consultant related to or arising out of Consultant's activities under this Agreement. ARTICLE VIII —TERMINATION OF AGREEMENT 8.1 By Consultant: 8.1.1 The City reserves the right to suspend this Agreement at the end of any phase for the convenience of the City by issuing a written and signed Notice of Suspension. The Consultant may terminate this Agreement for convenience in the event such suspension extends for a period beyond 120 calendar days by delivering a Notice of Termination to the City. 8.1.2 The Consultant must follow the Termination Procedure outlined in this Agreement. 8.2 By City: 8.2.1 The City may terminate this agreement for convenience upon seven days written notice to the Consultant at the address of record. 8.2.2 The City may terminate this agreement for cause upon ten days written notice to the Consultant. If Consultant begins,within three days of receipt of such notice,to correct its failure and proceeds to diligently cure such failure within the ten days, the agreement will not terminate. If the Consultant again fails to perform under this agreement, the City may terminate the agreement for cause upon seven days written notice to the Consultant with no additional cure period. If the City terminates for cause,the City may reject any and all proposals submitted by Consultant for up to two years. 8.3 Termination Procedure 8.3.1 Upon receipt of a Notice of Termination and prior to the effective date of termination, unless the notice otherwise directs or Consultant takes action to cure a failure to perform under the cure period, Consultant shall immediately begin the phase-out and discontinuance of all services in connection with the performance of this Agreement. Within 30 calendar days after receipt of the Notice of Termination, unless Consultant has successfully cured a failure to perform, Consultant shall submit a statement showing in detail the services performed under this Agreement prior to the effective date of termination. City retains the option to grant an extension to the time period for submittal of such statement. 8.3.2 Consultant shall submit all completed and/or partially completed work under this Agreement, including but not limited to specifications, designs, plans and exhibits. Page6 Rev.17-9 KENGINEERING OATAEXCHANGVANGIEMISOLID WASTE\E17068 CEFE VALENZUELA LANDFILL GAS SYSTEM OMAM¢0170907 CONTRACT PROFESSIONAL SERVICES GOC 8.3.3 Upon receipt of documents described in the Termination Procedure and absent any reason why City may be compelled to withhold fees, Consultant will be compensated for its services based upon a Time& Materials calculation or Consultant and City's estimate of the proportion of the total services actually completed at the time of termination. There will be no compensation for anticipated profits on services not completed. 8.3.4 Consultant acknowledges that City is a public entity and has a duty to document the expenditure of public funds. The failure of Consultant to comply with the submittal of the statement and documents, as required above, shall constitute a waiver by Consultant of any and all rights or claims to payment for services performed under this Agreement. ARTICLE IX—RIGHT OF REVIEW AND AUDIT 9.1 Consultant grants City, or its designees, the right to audit, examine or inspect, at City's election, all of Consultant's records relating to the performance of the Work under this Agreement, during the term of this Agreement and retention period herein. The audit,examination or inspection may be performed by a City designee, which may include its internal auditors or an outside representative engaged by City. Consultant agrees to retain its records for a minimum of four(4)years following termination of the Agreement, unless there is an ongoing dispute under this Agreement, then such retention period shall extend until final resolution of the dispute. 9.2 Consultant's records include any and all information, materials and data of every kind and character generated as a result of and relevant to the Work under this Agreement(Consultant's Records). Examples include billings, books, general ledger, cost ledgers, invoices, production sheets, documents, correspondence, meeting notes, subscriptions, agreements, purchase orders, leases, contracts, commitments, arrangements, notes, daily diaries,reports,drawings, receipts,vouchers, memoranda,time sheets, payroll records, policies, procedures,and any and all other agreements, sources of information and matters that may, in City's and Consultant's reasonable judgment, have any bearing on or pertain to any matters, rights, duties or obligations under or covered by any Agreement Documents. 9.3 City agrees that it shall exercise the right to audit, examine or inspect Consultant's Records only during Consultant's regular business hours. Consultant agrees to allow City's designee access to all of Consultant's Records,Consultant's facilities and Consultant's current employees,deemed necessary by City or its designee(s), to perform such audit, inspection or examination. Consultant also agrees to provide adequate and appropriate work space necessary to City or its designees to conduct such audits, inspections or examinations. 9.4 Consultant shall include this audit clause in any subcontractor, supplier or vendor contract. ARTICLE X—OWNER REMEDIES 10.1 The City and Consultant agree that in the event the City suffers actual damages; the City may elect to pursue its actual damages and any other remedy allowed by law. This includes but is not limited to: 10.1.1 Failure of the Consultant to make adequate progress and endanger timely and successful completion of the Project, which includes failure of subconsultants to meet contractual obligations; 10.1.2 Failure of the Consultant to design in compliance with the laws of the City, State and/or federal governments,such that subsequent compliance costs exceed expenditures that would have been involved had services been properly executed by the Consultant. 10.1.3 Losses are incurred because of errors and/or omissions in the design, working drawings, specifications or other documents prepared by the Consultant to the extent that the financial losses are greater than the City would have originally paid had there not been errors and/or omissions in the documents. Page 7 Rev. 17-9 K\ENGINEERING DATAEXCHANGEVWGIEMISOLID WASTE\E'19068 CEFE VALENZUELA LANDFILL GAS SYSTEM OM&M¢017 0907 CONTRACT PROFESSIONAL SERVICES DOC 10.2 When the City incurs non-value added work costs for change orders due to design errors and/or omissions, the City will send the Consultant a letter that includes: (1) Summary of facts with supporting documentation; (2) Instructions for Consultant to revise design documents, if appropriate, at Consultant's expense; (3) Calculation of non-value added work costs incurred by the City; and (4) Deadline for Consultant's response. 10.3 The Consultant may be required to revise bid documents and re-advertise the Project at the Consultants sole cost if, in the City's judgment,the Consultant generates excessive addenda,either in terms of the nature of the revision or the actual number of changes due to the Consultant's errors or omissions. 10.4 The City may withhold or nullify the whole or part of any payment as detailed in Article III. ARTICLE XI —CONSULTANT REMEDIES 11.1 If Consultant is delayed due to uncontrollable circumstances, such as strikes, riots, acts of God, national emergency, acts of the public enemy, governmental restrictions, laws or regulations or any other causes beyond Consultant's and City's reasonable control, an extension of the Project schedule in an amount equal to the time lost due to such delay shall be Consultant's sole and exclusive remedy. The revised schedule should be approved in writing with a documented reason for granting the extension. 11.2 The City agrees that the Consultant is not responsible for damages arising from any cause beyond Consultant's reasonable control. 11.3 If Consultant requests a remedy for a condition not specified above, Consultant must file a Claim as provided in this Agreement. ARTICLE XII —CLAIMS AND DISPUTE RESOLUTION 12.1 Filing of Claims 12.1.1 Claims arising from the circumstances identified in this Agreement or other occurrences or events, shall be made by Written Notice delivered by the party making the Claim to the other party within twenty-one (21)calendar days after the start of the occurrence or event giving rise to the Claim and stating the general nature of the Claim. 12.1.2 Every Claim of Consultant,whether for additional compensation, additional time or other relief,shall be signed and sworn to by a person authorized to bind the Consultant by his/her signature, verifying the truth and accuracy of the Claim. 12.1.3 The responsibility to substantiate a claim rests with the party making the Claim. 12.1.4 Within thirty(30)calendar days of receipt of notice and supporting documentation,City will meet to discuss the request, after which an offer of settlement or a notification of no settlement offer will be sent to Consultant. If Consultant is not satisfied with the proposal presented, Consultant will have thirty (30) calendar days in which to (i) submit additional supporting data requested by the City, (ii) modify the initial request for remedy or(iii) request Mediation. 12.1.5 Pending final resolution of a claim,except as otherwise agreed in writing, Consultant shall proceed diligently with performance of the Agreement, and City shall continue to make payments in accordance with this Agreement. Page 8 Rev.17-9 KWNGINEERING DATAEXCNANGSANGIEMISOLID WASTEE17068 CEFE VALENZUELA LANDFILL GAS SYSTEM OM&MT0170907 CONTRACT PROFESSIONAL SERVICES DOG • • • 12.2 Mediation 12.2.1 All negotiations pursuant to this clause are confidential and shall be treated as compromise and settlement negotiations for purposes of applicable rules of evidence. 12.2.2 Before invoking mediation,the Parties agree that they shall first try to resolve any dispute arising out of or related to this Agreement through discussions directly between those senior management representatives within their respective organizations who have overall managerial responsibility for similar projects. This step shall be a condition precedent to the use of mediation. If the parties' senior management representatives cannot resolve the dispute within thirty (30) calendar days after a Party delivers a written notice of such dispute, then the Parties shall proceed with the mediation process contained herein. 12.2.3.1 In the event that City or Consultant shall contend that the other has committed a material breach of this Agreement,the Party alleging such breach shall,as a condition precedent to filing any lawsuit, request mediation of the dispute. 12.2.3.2 Request for mediation shall be in writing, and shall request that the mediation commence no less than thirty (30) or more than ninety (90) calendar days following the date of the request, except upon agreement of both parties. 12.2.3.3 In the event City and Consultant are unable to agree to a date for the mediation or to the identity of the mediator or mediators within thirty (30) calendar days of the request for mediation, all conditions precedent in this Article shall be deemed to have occurred. 12.2.3.4 The parties shall share the mediator's fee. Venue for mediation shall be Nueces County, Texas. Any agreement reached in mediation shall be enforceable as a settlement agreement in any court having jurisdiction thereof. No provision of this Agreement shall waive any immunity or defense. No provision of this Agreement is a consent to suit. 12.3 In calculating the amount of any Claim or any measure of damages for breach of contract, the following standards shall apply both to claims by Consultant and to claims by City: 12.3.1 In no event shall either Party be liable,whether in contract or tort or otherwise,to the other Party for loss of profits, delay damages or for any special incidental or consequential loss or damage of any nature arising at any time or from any cause whatsoever; 12.3.2 Damages are limited to extra costs specifically shown to have been directly caused by a proven wrong for which the other Party is claimed to be responsible. 12.4 In case of litigation between the parties, Consultant and City agree that neither party shall be responsible for payment of attorney's fees pursuant to any law or other provision for payment of attorneys' fees. Both Parties expressly waive any claim to attorney's fees should litigation result from any dispute between the parties to this Agreement. 12.5 No Waiver of Governmental Immunity. NOTHING IN THIS ARTICLE SHALL BE CONSTRUED TO WAIVE CITY'S GOVERNMENTAL IMMUNITY FROM LAWSUIT,WHICH IMMUNITY IS EXPRESSLY RETAINED TO THE EXTENT IT IS NOT CLEARLY AND UNAMBIGUOUSLY WAIVED BY STATE LAW. Page 9 Rev.17-9 NIENGINEERING DATAEXCHANGE ANGIEM\SOLID VVASTE1E17068 CEFE VALENZUELA LANDFILL GAS SYSTEM OMBM2017 0907 CONTRACT PROFESSIONAL SERVICES DOC • • ARTICLE XIII — MISCELLANEOUS PROVISIONS 13.1 Assignability. Neither party will assign, transfer or delegate any of its obligations or duties under this Agreement contract to any other person and/or party without the prior written consent of the other party, except for routine duties delegated to personnel of the Consultant staff. This includes subcontracts entered into for services under this Agreement. If the Consultant is a partnership or joint venture,then in the event of the termination of the partnership or joint venture, this contract will inure to the individual benefit of such partner or partners as the City may designate. No part of the Consultant fee may be assigned in advance of receipt by the Consultant without written consent of the City. The City will not pay the fees of expert or technical assistance and consultants unless such employment, including the rate of compensation, has been approved in writing by the City. 13.2 Ownership of Documents. Consultant agrees that upon payment, City shall exclusively own any and all information in whatsoever form and character produced and/or maintained in accordance with, pursuant to or as a result of this Agreement, including contract documents (plans and specifications), drawings and submittal data. Consultant may make a copy for its files. Any reuse by the City,without specific written verification or adaptation by Consultant,shall be a City's sole risk and without liability or legal exposure to Consultant. The City agrees that any modification of the plans will be evidenced on the plans and be signed and sealed by a licensed professional prior to re-use of modified plans. 13.3 Standard of Care. Services provided by Consultant under this Agreement shall be performed with the professional skill and care ordinarily provided by competent licensed professionals practicing under the same or similar circumstances and professional license; and performed as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer or architect. 13.4 Licensing. Consultant shall be represented by personnel with appropriate licensure, registration and/or certification(s)at meetings of any official nature concerning the Project,including scope meetings, review meetings, pre-bid meetings and preconstruction meetings. 13.5 Entire Agreement. This Agreement represents the entire and integrated Agreement between City and Consultant and supersedes all prior negotiations, representations or agreements, either oral or written. This Agreement may be amended only by written instrument signed by both the City and Consultant. 13.6 Disclosure of Interest. Consultant agrees to comply with City of Corpus Christi Ordinance No. 17112 and complete the Disclosure of Interests form, attached-as-Exhibit 0. 13.7 Certificate of Interested Parties. For contracts greater than $50,000, Consultant agrees to comply with Texas Government Code section 2252.908 and complete Form 1295 Certificate of Interested Parties as part of this agreement,attached ac Exhibit E. Form 1295 requires disclosure of"interested parties"with respect to entities that enter contracts with cities that exceed $50,000. These interested parties include: (1) persons with a "controlling interest" in the entity, which includes: a. an ownership interest or participating interest in a business entity by virtue of units, percentage, shares, stock or otherwise that exceeds 10 percent; b. membership on the board of directors or other governing body of a business entity of which the board or other governing body is composed of not more than 10 members; or c. service as an officer of a business entity that has four or fewer officers, or service as one of the four officers most highly compensated by a business entity that has more than four officers; or (2) a person who actively participates in facilitating a contract or negotiating the terms of a contract with a governmental entity or state agency, including a broker, intermediary, adviser or attorney for the business entity. Form 1295 must be electronically filed with the Texas Ethics Commission at https:llwww.ethics.state.tx.uslwhatsnewlelf_info_form1295.htm. The form must then be printed, signed, Page 10 Rev.17-9 KIENGINEERING DATAEXCNANGELANGIEMSOLID VVASTE*170S8 CEFE VALENZUELA LANDFILL GAS SYSTEM OMSM120170907 CONTRACT PROFESSIONAL SERVICES DOC J • notarized and filed with the City. For more information, please review the Texas Ethics Commission Rules at https://www.ethics.state.tx.us/legal/ch46.html. 13.8 Conflict of Interest. Consultant agrees, in compliance with Chapter 176 of the Texas Local Government Code,to complete and file Form CIO with the City Secretary's Office. For more information and to determine if you need to file a Form CIC), please review the Information on the City Secretary's website at http://www.cctexas.com/government/city-Secretary/conflict-disclosurefindex. 13.9 Controlling Law. This Agreement is governed by the laws of the State of Texas without regard to its conflicts of laws. Venue for legal proceedings lies exclusively in Nueces County, Texas. Cases must be filed and tried in Nueces County and cannot be removed from Nueces County. 13.10 Severability. If, for any reason, any one or more Articles and/or paragraphs of this Agreement are held invalid or unenforceable, such invalidity or unenforceability shall not affect, impair or invalidate the remaining Articles and/or paragraphs of this Agreement but shall be confined in its effect to the specific Article,sentences, clauses or parts of this Agreement held invalid or unenforceable,and the invalidity or unenforceability of any Article, sentence,clause or parts of this Agreement, in any one or more instance, shall not affect or prejudice in any way the validity of this Agreement in any other instance. 13.11 Conflict Resolution Between Documents. Consultant hereby agrees and acknowledges if anything contained in the Consultant-prepared Exhibit A, Consultant's Scope of Services, or contained in any other document prepared by Consultant and included herein,is in conflict with Articles I-XIII of this Agreement(Articles), the Articles shall take precedence and control to resolve said conflict. CITY OF CORPUS CHRISTI SCS ENGINEERS,INC. Margie C. Ro Date David J. Mezzacapp-, P.E. Date City Manager Vice President 1901 Central Drive, Suite 550 Bedford, Texas 76021 (817) 571-2288 Office RECOMMENDED ,� dmezzacappa@scsengineers.com gc2029, Yr/7 Mark Van Vleck ate ltAssistant City Ma ager 4/ (� 9 I rie H. Gra W Date E - utive Dir- Public orks APPROVED AS TO LEGAL FORM Jowl* Ai ee Alcorn-Reed IN � 2017. 09.1210:55:34-05'00' Assistant City Attorney Date Rage 11 Rev. 17-9 6 ENGINEER WIG DATAEXCIMNGENNGIEMSOLID WASTPE17068 CEFE VALENIUELA LMDFIL1 GAS SYSTEM 0M&MQ01T 0707 CONTRACT PROFESSIONAL SERVICES DOC • E17068 Cefe Valenzuela Landfill Gas System OM&M Fund Name Accounting Unit Account No. Activity No. Account Amount Category Solid Waste Operating 1020-12506-033 530000 E17068011020EXP 30000 $18,692.50 Solid Waste Operating 1020-12530-033 530000 E17068011020EXP 30000 $18,692.50 • Total $37,385.00 Page 12 Rev.17-9 KIENGINEERING DATAE%CHANGENNGIEMISOLIO WASTE\E170S9 CEFE VALENZUELA LANDFILL GAS SYSTEM OM&A@0170907 CONTRACT PROFESSIONAL SERVICES DOC EXHIBIT A SCOPE OF SERVICES Contract for Professional Services Exhibit A SCS ENGINEERS - - _ ink 4,11t,* ti 7 • �. __. . ice. Cefe Valenzuela Landfill Proposal for Gas System OM&M and Compliance Services Required Late 2017 E17068 Cefe Valenzuela Landfill Gas System OM&M Presented To: o�QuS � �y'��s► INST CITY OF CORPUS CHRISTI P. O. Box 9277 Corpus Christi, Texas 78469-9277 (361) 826-3500 Presented By: SCS ENGINEERS 1 901 Central Drive, Suite 550 Bedford, Texas 76021 (817) 571-2288 August 2017 Proposal No. 160137217 Offices Nationwide www.scsengineers.com EXHIBIT "A" Page 1 of 22 • • City of Corpus Christi SCS ENGINEERS Cefe Valenzuela Landfill Proposal for Gas System OM &M and Compliance Services Required Late 2017 E17068 Cefe Valenzuela Landfill Gas System OM&M Presented To: CITY OF CORPUS CHRISTI P. O. Box 9277 Corpus Christi, Texas 78469-9277 (361) 826-3500 Presented By: SCS ENGINEERS 1 901 Central Drive, Suite 550 Bedford, Texas 76021 (817) 571-2288 August 2017 Proposal No. 160137217 Cefe Valenzuela and J. C. Elliott Landfills GCCS OM&M and August 2017 Related Services Proposal IEXHIBIT "A" Page 2 of 22 • • City of Corpus Christi SCS ENGINEERS Table of Contents Section Page 1 BACKGROUND 1 2 SCOPE OF SERVICES 1 GCCS Operational Goals 1 Task 1 —Routine/Non-Routine GCCS OM&M Services 2 Routine OM&M Services 2 Wellfield Monitoring and Maintenance Services 2 Other Wel!field Monitoring and Maintenance Services 2 BFS Monitoring and Maintenance Services 3 Spare Parts Inventory 4 GCCS OM&M Recordkeeping and Reporting 4 Project Management and Administration 4 Non-Routine OM&M Services 5 Non-Routine Scheduled Services 5 Non-Routine Unscheduled Services 5 Task 2 —Scope and Schedule of Cefe Practice Surface Emissions Monitoring (SEM) Services 6 SEM Field Activities 6 SEM Recordkeeping and Reporting 6 SEM Schedule 7 Task 3 — Preparation of Startup, Shutdown, and Malfunction (SSM) Plan 7 Task 4 — Revision to Greenhouse Gas (GHG) Monitoring Plan 7 3 SCHEDULE 8 4 COST ESTIMATE 8 Routine Services (Tasks 1 through 4) 8 Procedures for Non-Routine Services 9 5 ASSUMPTIONS AND CONDITIONS 10 Attachment Fee Schedule Cefe Valenzuela and J. C. Elliott Landfills GCCS OM&M and August 2017 Related Services Proposal IEXHIBIT"A" I Page 3 of 22 • City of Corpus Christi SCS ENGINEERS 1 BACKGROUND Per our discussions with the City of Corpus Christi (City), this proposal has been prepared to cover landfill gas collection and control system (GCCS) operational requirements at the Cefe Valenzuela Landfill (Cefe) that are required for GCCS startup as well as upcoming New Source Performance Standard (NSPS) requirements. Tasks are also included to prepare a startup, shutdown, and malfunction plan (SSM Plan) as required by NSPS rules as well as a required update to the Greenhouse Gas(GHG) for the new flare's installation. Cefe will have the following landfill gas-related systems that require maintenance and monitoring: Gas Collection System SEM Landfill No. of No. of No. of No. of Surface Wells Sumps Flares' Blowers Area (acres) Cefe Valenzuela 26 4 1 2 60 I Candlestick Flare For monitoring purposes,Cefe will be subject to the operational requirements of Title 40 Code of Federal Regulations Part 60, Subpart WWW (aka New Source Performance Standards (NSPS)). The period of this proposal is meant to cover Cefe's GCCS startup through as late as December 2017 until SCS can be brought under contract through RFQ 2017-01. 2 SCOPE OF SERVICES For the first several tasks of this proposal, SCS will perform GCCS operations, monitoring, and maintenance (OM&M) services for Cefe. Reporting of these services will also be provided. These activities are further described below. GCCS Operational Goals SCS Field Services (SCS-FS) will operate the GCCS at Cefe as part of this proposal consistent with NSPS rules. Consequently, the following minimum landfill gas (LFG) quality standards will apply to measurements taken at each LFG extraction wellhead: • Static pressure measured at the wellhead must be less than 0.0 inches of water column (i.e.,under vacuum); • LFG temperature measured at the wellhead must be less than 131 degrees Fahrenheit (131°F);and • Oxygen concentration measured at the wellhead must be less than 5.0 percent by volume. Although not required by regulations, SCS-FS will also attempt to maintain the LFG quality at each wellhead in conformance with the following limits: • Methane concentration between 45 and 58 percent;and • Balance gas concentration less than 10 percent. Cefe Valenzuela and J. C. Elliott Landfills GCCS OM&M and August 2017 Related Services Proposal 1 EXHIBIT "A" Page 4 of 22 • • City of Corpus Christi SCS ENGINEERS These latter LFG quality standards are overall benchmarks and are not considered absolute minimum or maximum allowable readings; however, they are consistent with NSPS requirements and provide desirable goals for LFG quality at each wellhead. TASK 1 — ROUTINE/NON -ROUTINE GCCS OM&M SERVICES ROUTINE OM&M SERVICES Routine GCCS-related services are those services for which the scopes can be reasonably defined at the present time and estimates of costs provided. Wellfield Monitoring and Maintenance Services SCS-FS will conduct monitoring and adjustment of the wellfield to ensure proper balancing of the LFG extraction wells. Routine GCCS OM&M services will be provided at each active LFG extraction well. During these services, SCS-FS will document the following operational data (as appropriate for monitoring equipment used) for each well: • Static pressure; • Differential pressure; • Lateral(available) vacuum; • LFG flow; • LFG composition(i.e., methane(CH4), carbon dioxide(CO2), oxygen(02), nitrogen (N2)); and • LFG temperature. The technician will also evaluate the condition of each wellhead and listen for leaks. Minor leaks identified during monitoring will be repaired at the time of discovery. Leaks that cannot be fully repaired (e.g., those requiring replacement parts) will be temporarily mitigated in the field (if possible). Permanent repairs will be performed as non-routine scheduled services (see Non- Routine Services section of this proposal). Monitoring will be performed with a Landtec GEM 5000 or equivalent. Initial monthly tuning will be done with the GC during the first half of the month. At a minimum, the GEM 5000 will be calibrated prior to use each day and as needed during the course of the day. Factory calibration will be performed in accordance with manufacturer's recommendations. Other Wellfield Monitoring and Maintenance Services Additional wellfield monitoring and maintenance services are indicated below: • Replacement of flex hoses and monitoring ports on wells (labor only; limited to five wells per month); • Measurement of depth-to-liquid in wells(once per year); • Monitoring of LFG quality and pressure at sample ports on collection piping (if applicable); Cefe Valenzuela and J. C. Elliott Landfills GCCS OM&M and August 2017 Related Services Proposal 2 EXHIBIT"A" Page 5 of 22 • • City of Corpus Christi SCS ENGINEERS • Observation and monitoring of wells equipped with pneumatic pumps to verify proper operation of pumps(if applicable); • Observation and monitoring of condensate sumps and/or drip legs to verify their integrity and proper operation; and • Observation for general landfill cover integrity and surface water drainage conditions that might impact LFG collection system operations. As necessary, issues related to these items will be brought to the attention of landfill management prior to SCS-FS personnel leaving Cefe and documented in the monthly report(see below). BFS Monitoring and Maintenance Services SCS-FS will perform routine blower/flare system (BFS) monitoring each month including the following services: • Collect BFS data(as available)including: - Instantaneous flow readings(from meter); - Total flow readings(from totalizer); - Overall system vacuum(i.e.,knockout inlet); - Knockout outlet pressure and temperature; - Blower inlet and outlet pressures and temperatures; - Flame arrestor inlet and outlet pressures(if ports available); - Composite LFG quality(i.e.,CH4,CO2,02, and balance gas concentrations); - Flare temperature(from thermocouple readout); - Blower run time hours(from meter); - Blower bearing temperatures(from panel readout); - Blower amperage reading(from panel readout); - Flow meter readings(for condensate tanks [if applicable]); and - Logger data(i.e., download logger). • Monitor and record operating status as applicable of various BFS components including: - Blower; - Motor; - Flare; - Flare control system; - Air compressor(if applicable); and - Propane tank(if applicable). SCS-FS personnel will identify any necessary manufacturer's specified preventative maintenance of BFS components including: . • Blower; • Motor; Cefe Valenzuela and J. C. Elliott Landfills GCCS OM&M and August 2017 Related Services Proposal 3 EXHIBIT "A" Page 6 of 22 City of Corpus Christi SCS ENGINEERS • Flare control system; • Condensate knockout(s);and • Flame arrestor. In the event that SCS-FS is required to perform these services,then they will be provided as non- routine scheduled services(see Non-Routine Services section of this proposal). Services that will be provided as needed in conjunction with routine monthly visits include: • Tightening of hoses,valves, etc.; • Replacement of broken sampling ports/cock valves(labor only); • Cleaning around the BFS; and • Greasing motor/blower bearings(if grease fittings available). Spare Parts Inventory SCS-FS will keep an inventory of spare parts and materials at a designated location on site for the GCCS (in accordance with the manufacturer's operations manuals for the blower,motor, and flare). If any of the spare parts or materials in the inventory are used for maintenance or repairs, SCS-FS will notify City personnel who will order the items or who may direct SCS-FS to do so. GCCS OM&M Recordkeeping and Reporting For monthly GCCS OM&M services, SCS-FS will prepare and submit a report by the 30'h of the month following the month for which wellfield monitoring services were provided. This report will include the following information: • Monitoring data collected at individual LFG extraction wells; • Status of each well's compliance with the operating limits; • Well depth measurements(when such measurements are taken); • Summary of BFS operations; • Condensate sump operational status; • Summary of routine maintenance services performed; • Summary of non-routine maintenance services performed(if any);and • Recommendations for additional non-routine maintenance or repairs needed(if any). In advance of submitting the above-described report, SCS-FS will compile collected data on the SCSeTools server and provide access for designated personnel to this data. Field data will be uploaded to SCSeTools for access and review within two workdays following collection by SCS- FS. By placing data on the SCSeTools server, access will be available to personnel at all times via the Internet. Project Management and Administration For the above tasks, SCS-FS will provide an adequate level of management and administration to ensure that the project runs smoothly and efficiently. Management/administrative services Cefe Valenzuela and J. C. Elliott Landfills GCCS OM&M and August 2017 Related Services Proposal 4 'EXHIBIT "A" Page7of22 • City of Corpus Christi SCS ENGINEERS include scheduling of field activities, oversight of field activities, reporting of field activities, invoicing for services, and client communications. Costs for these services are included under the respective tasks. NON-ROUTINE OM&M SERVICES With the routine services that will be provided as described above, non-routine services should be minimized; however, some non-routine services may still be necessary at times. Examples of such services are provided below. Non-Routine Scheduled Services Non-routine scheduled services consist of corrective repairs or maintenance work identified by City personnel or by SCS-FS personnel during routine visits or supplemental GCCS monitoring services. Such services may include but are not limited to the following: • Remonitoring of LFG extraction wells; • Repair/replacement of broken valves; • Repair/replacement of damaged wellheads; • Raising of wells; • Repair of damaged header and/or leachate lines; • Troubleshooting of well and/or header problems; • Blower/flare maintenance activities;and • Troubleshooting of pump problems(in wells or sumps). Such services may be necessary for regulatory compliance or essential for satisfactory system operation; however, the work is of a non-emergency nature and can be scheduled to allow for procurement of materials and/or equipment and scheduling of personnel. Non-routine scheduled maintenance will be performed on a time-and-materials or fixed fee basis and only with prior authorization from the City. Non-Routine Unscheduled Services Non-routine unscheduled (emergency) services include events that require immediate response for ongoing operation of the GCCS and/or to ensure protection of public health and the environment. Such services may include but are not limited to the following: • Investigation of elevated oxygen concentrations at the BFS; • Repair of main header line breaks(resulting in no or reduced LFG flow); • Troubleshooting/repair of BFS problems; and • Investigation of surging vacuum in header. Due to the urgent nature of these items, advance scheduling of work activities may not be feasible; however, SCS-FS personnel are prepared to respond to emergencies as needed, 24 hours per day, 7 days per week. Non-routine unscheduled services will be performed as required on a time-and-materials basis and only with prior authorization from the City. Cefe Valenzuela and J. C. Elliott Landfills GCCS OM&M and August 2017 Related Services Proposal 5 IEXHIBIT "A" Page 8 of 22 • City of Corpus Christi SCS ENGINEERS TASK 2 — SCOPE AND SCHEDULE OF CEFE PRACTICE SURFACE EMISSIONS MONITORING ( SEM) SERVICES SCS-FS will perform one "practice" quarterly SEM event at Cefe prior to the formal NSPS startup date but after GCCS installation and startup. The first"formal"NSPS-required scan will be conducted in early 2018, presumably under a new scope approved through the RFQ. The practice scan will be performed in general accordance with Title 40 Code of Federal Regulations Section 60.755(c) and (d) (40 CFR §60.755(c) and (d)) or 40 CFR §60.765(c) and (d) and 40 CFR Part 60, Appendix A, Method 21. As required by the regulations, monitoring will be scheduled during periods of typical meteorological conditions and will provide coverage of the area served by the GCCS. SEM Field Activities The SEM event will include the following: • Identifying the monitoring route in the field per the SEM route map; • Identifying penetration locations in the field per the wellfield layout map; • Testing surface emissions continuously along the monitoring path and at penetrations using an organic vapor analyzer specifically designed for surface emissions testing (e.g., flame ionization detector); • Marking, recording, and notifying Site personnel of areas where methane concentrations exceeding 500 parts per million(ppm)above background are detected(if applicable); and • Recommending corrective actions to remediate areas of exceedances (if applicable) such as adjustments to extraction wells; adjustments to header line flow/vacuum; cover maintenance; or installation of additional collection devices. Rechecks of locations where methane concentrations exceed 500 ppm above background will be performed within 10 days and at one month of initial detection of the exceedance as if this were a formal required scan. Exceedances will be brought promptly to the attention of Site personnel to allow timely implementation of corrective actions. If a corrective action is implemented for an exceedance location on the day of the quarterly SEM event prior to the SCS-FS technician leaving the Site, then the 10-day recheck will be performed that same day. In the event that a separate mobilization is required, a cost for 10-day or one-month rechecks has been provided in the Cost Estimate section of this proposal(see below). SEM Recordkeeping and Reporting By the 15th of the month following the end of the month in which the SEM work is completed, SCS-FS will prepare and submit an informal report to the landfill manager summarizing all SEM activities performed and the data collected. This report will include the following information: • Explanation of procedures followed in conducting monitoring; • Instrument field calibration and background data; • Data for exceedance locations(i.e., locations with methane concentrations exceeding 500 ppm above background)including initial and follow-up monitoring(if applicable); Cefe Valenzuela and J. C. Elliott Landfills GCCS OM&M and August 2017 Related Services Proposal 6 !EXHIBIT "A" Page 9 of 22 • • City of Corpus Christi SCS ENGINEERS • Identification of corrective actions implemented to address exceedances (if applicable); and • A map of the SEM route followed during monitoring with exceedance locations and areas not monitored(for safety reasons) noted. Additional documentation (e.g., field data, notes) will be maintained and made available as needed. SEM Schedule As noted above, this practice SEM event will be conducted during the 4th quarter of 2017, after GCCS startup at Cefe, but prior to the NSPS startup date. With regard to monitoring procedures, this monitoring event will be conducted in the same manner as mandatory monitoring even with respect to rechecks. Mandatory SEM events will commence during the 1S` quarter of 2018 under a separate proposal. TASK 3 — PREPARATION OF STARTUP, SHUTDOWN, AND MALFUNCTION (SSM) PLAN In 2003, the United States Environmental Protection Agency (EPA) published rules under 40 CFR §63, Subpart AAAA to regulate hazardous air pollutants from municipal solid waste landfills. The rule augmented the requirements already set forth by the New Source Performance Standards (NSPS) rule for landfills. Since the landfill will become subject to NSPS control under 40 CFR 60, Subpart WWW on November 11, 2017, a Startup, Shutdown, and Malfunction Plan(SSM Plan) must be prepared and implemented by that date. For this task, SCS will prepare the required SSM Plan in conformance with 40 CFR §63, Subpart AAAA requirements. This plan will describe, in detail, procedures for operating and maintaining the wellfield and flare during periods of startup, shutdown, and malfunction, and a program for corrective action for malfunctioning processes. The proposed SSM Plan will consist of a cover page, revision history so that changes to the plan can be tracked as required by rule, an introduction, regulatory background, plans for startup, shutdown, and malfunction, and relevant appendices. The plan will include examples of procedures to be followed for commonly encountered events as well as the corrective actions that should be taken during such events. It should be noted that the initial SSM Plan does not require submittal to the EPA, State, or County; it simply must be maintained on-site and followed. TASK 4 — REVISION TO GREENHOUSE GAS (GHG) MONITORING PLAN Since a new gas system is being constructed at the Cefe Valenzuela Landfill, the landfill's Greenhouse Gas (GHG) Monitoring Plan will require revision to account for the new flare. For Cefe Valenzuela and J. C. Elliott Landfills GCCS OM&M and August 2017 Related Services Proposal 7 EXHIBIT"A" Page 10 of 22 City of Corpus Christi SCS ENGINEERS this task, SCS will revise the GHG monitoring plan to account for the new flare. This revised plan will include the required elements from 40 CFR§98.3(g)(5). A draft plan will be prepared for the City's review. Upon receipt of any comments, a final GHG Monitoring Plan will be provided in both PDF and hard copy (for the site) formats. The fmal plan will be sealed by a professional engineer registered in the State of Texas. SCS' proposed scope for OM&M of the gas system will include the collection of the required flare data that will be included in this plan revision. As with the SSM Plan included in a separate task of this proposal, this revised GHG Monitoring Plan does not require submittal to or approval of the EPA, State, or County; it simply must be maintained on-site and followed. 3 SCHEDULE SCS' schedule is described below by task. Routine GCCS OM&M services at Cefe will be provided in general accordance with the schedule below: Frequency of Service Ongoing Startup GCCS OM&M' Post-Startup GCCS OM&M2 Weekly/Semimonthly Monthly I Ongoing startup services commence the week after completion of initial startup services and will continue for two months. For the first month,services will be provided for the first two weeks(i.e.,two times). For the final six weeks,services will be provided three more times(every other week). 2 If needed,additional services will be provided as non-routine services as described below. SCS-FS is prepared to commence the scope of services described above at Cefe beginning in early September 2017 (two weeks after initial startup, which will consist of three consecutive days of monitoring and be covered under SCS' current Construction Quality Assurance (CQA) contact). Services will be provided through December 31, 2017, or until all reports for that period are completed and submitted, or until SCS is brought under contract through the RFQ for the required services. As noted above, this practice SEM event (Task 3) will be conducted during the 4th quarter of 2017, after GCCS startup at Cefe, but prior to the NSPS startup date. For Tasks 4 and 5, both the SSM Plan and the revised GHG Monitoring Plan will be completed by the November 2017 NSPS startup date. 4 COST ESTIMATE Routine Services (Tasks 1 through 4) For Tasks 1 and 2, SCS proposes to perform routine GCCS OM&M and SEM services on a unit cost basis by task for the amounts shown in the table below. Information on the procedures to be followed for non-routine services are provided below. Tasks 3 and 4 will be performed on a lump sum basis. Cefe Valenzuela and J. C. Elliott Landfills GCCS OM&M and August 2017 Related Services Proposal 8 EXH "A" Page 11 IBIT of 22 • City of Corpus Christi SCS ENGINEERS Estimated Task Service Service Cost per Number of Number Site Type of Service Frequency Period Event Events Total Cost 1 A' Cefe Routine GCCS OM&M Weekly / Two Months $3,330 5 $16,650 (Ongoing Startup)' Semimonthly 1B Cefe Routine GCCS OM&M Monthly Two Months $4,280 2 $8,560 2 Cefe Practice SEM-Initial Quarterly One Month $4,625 1 $4,625 2 Cefe Practice SEM- Recheck Quarterly One Month $2,250 1 $2,250 3 Cefe Prepare SSM Plan Once N/A $3,500 N/A $3,500 4 Cefe GHG Plan Revision Once N/A $1,800 N/A $1,800 Total $37,385 I Ongoing startup services commence the week after completion of initial startup services and will continue for two months. For the first weeks, services will be provided weekly(i.e.,two times). Then over the next six weeks services will be provided three times(every two weeks). Procedures for Non-Routine Services Non-routine scheduled services and non-routine unscheduled (emergency) services will be compensated in accordance with the fee schedules (see appendices). Since determination of the frequency of occurrence or extent of repair work that might be required is not possible at this time, cost estimates for these services are not provided. When scheduled non-routine services are needed, SCS-FS will provide the City with time-and-materials/not-to-exceed or fixed fee estimates for specific corrective repairs or maintenance work. When unscheduled (emergency) services are needed, SCS-FS will be prepared to quickly respond to requests from the City for assistance and may not have sufficient time to provide cost estimates for services in advance. In both cases,work would proceed subsequent to authorization from the City. Cefe Valenzuela and J. C. Elliott Landfills GCCS OM&M and August 2017 Related Services Proposal 9 IEXHIBIT"A" I Page 12 of 22 • City of Corpus Christi SCS ENGINEERS 5 ASSUMPTIONS AND CONDITIONS In preparing this proposal SCS-FS offers the following assumptions and conditions: 1. SCS-FS will be responsible for the OM&M of the GCCS at the Cefe Valenzuela Landfill. No expansions of the systems at the landfill have been accounted for in this proposal. 2. Routine monitoring and maintenance services will typically be provided by a one-man crew; however, additional support may be provided for some services (e.g., surface emissions monitoring). 3. Wellheads are in suitable condition for monitoring with a Landtec GEM 5000 or equivalent. 4. All materials for the spare parts inventory will be provided by the City or obtained by SCS-FS in accordance with the fee schedules provided in the appendices. 5. SCS-FS will be responsible for routine monthly operations and maintenance of the BFS system as described above. The BFS will be monitored in conjunction with site visits for monitoring of the wellfield. Additional separate mobilizations only for monitoring of the BFS have not been accounted for in the cost estimate. 6. The City will provide SCS-FS with plans, reports, and manuals that might facilitate completion of the required scope of services. If available, any drawings(e.g.,well layout plan)will be provided as AutoCAD files. 7. All reports will be provided in standardized formats currently utilized by SCS-FS; however,minor changes to the reports as specified by the City will be made. 8. No regularly scheduled meetings between the City and SCS-FS have been accounted for in the scope of services; however, it is anticipated that the SCS-FS technician may meet with City personnel when performing routine and non-routine services at the Sites. 9. SCS-FS takes no responsibility for the overall quality of the LFG collected from the GCCS in regards to trace components. 10. SCS-FS takes no legal responsibility for any of the potential hazards associated with condensate from the GCCS and/or its disposal. If removal and off-site disposal of condensate is required, then it will be managed directly by others. SCS-FS may assist with coordination and management of condensate and leachate removal operations if requested. 11.This proposal is valid for 60 days from the date of this submittal. This proposal is confidential and for the City's use only. If awarded the work, this proposal will become part of a mutually acceptable contract or purchase order. Cefe Valenzuela and J. C. Elliott Landfills GCCS OM&M and August 2017 Related Services Proposal 10 IEXHIBIT"A" Page 13 of 22 FEE SCHEDULES (LABOR AND EQUIPMENT) EXHIBIT"A" Page 14 of 22 • Environmental Consultants 3900 Kilroy Airport Way 562 426-9544 and Contractors Suite 100 FAX 562 492-6210 Long Beach, CA 90806-6816 www.scsfieldservices.com SCS FIELD SERVICES OM&M FEE SCHEDULE (Effective May 1, 2017 through April 30, 2018) Technical Field Personnel Rate ($)/Hour Laborer 54 Fusion Technician 70 Technician 75 Equipment Operator 80 Systems Specialist 80 Foreman 90 Plant Operator 90 Senior Technician 98 Superintendent 105 Mechanic 115 Controls Specialist 135 Senior Superintendent 135 Management/Support Personnel Rate ($)/Hour Secretarial 53 Project Administrator 72 Field Data Analyst 77 Senior Project Administrator 85 Project Coordinator/Accountant 100 Designer/Drafter 110 Project Professional/H&S Specialist 125 Sr. H&S Advisor 152 Regional Field Compliance Auditor 162 Controls & Instrument Engineer 165 System Integrator 180 Product Development Manager 180 Senior Project Professional 195 Project Manager/H&S/National Compliance Manager 198 Sr. Project Manager 210 Sr. Project Advisor ..235 Regional Manager/Project Director 250 General Terms 1. Labor rates are in effect until April 30, 2018. Any work performed after that date is subject to a new Standard Fee Schedule. 2. The above rates include salary, overhead, and profit. Other direct charges, such as subcontractors,construction equipment, materials, air travel, freight, auto rental, permits, fees, taxes, tolls, and other costs incurred for the project,will be billed at cost plus 15 Offices Nationwide 0 EXHIBIT"A" I Page 15 of 22 SCS Field Services Fee Schedule Mayl , 2017 through April 30, 2018 Page 2 percent. The cost of equipment owned by SCS Field Services will not be subject to administrative mark-up. Automobile mileage cost is$0.54 per mile. Trucks will be charged at$18.00/hour. (No administrative mark-up will be applied to charges for company owned vehicles.) 3. Invoices will be prepared monthly for work in progress,unless otherwise agreed. Invoices are due and payable upon receipt. 4. Payment of SCS Field Services invoices for services performed will not be contingent upon the client's receipt of payment from other parties. The client agrees to pay legal costs, including attorney's fees, incurred by SCS Field Services in collecting any amounts past due and owing on the client's accounts. 5. For overtime work, the rates above will be increased by 50 percent in accordance with Federal law. 6. These rates are based on non-union, non-prevailing wage scales. EXHIBIT"A" Page 16 of 22 • Environmental Consultants 3900 Kilroy Airport Way 562 426-9544 and Contractors Suite 100 FAX 562 492-6210 Long Beach, CA 90806-6816 www.scsfieldservices.com SCS FIELD SERVICES FEE SCHEDULE FOR EQUIPMENT AND ANALYSIS (Effective May 1, 2017 through April 30, 2018) Rate ($) GEM 2000/2000 NAV/5000 Gas Analyzer: • Daily Rate 185/day • Weekly Rate 555/week • Monthly Rate 1,665/month H2S Gas Pod/CO Gas Pod 10/day SEM 500/TVA 2020/TDL 500/ Site FID Emissions Monitor: • Daily Rate 185/day • Weekly Rate 555/week • Monthly Rate 1,665/month Q Rae Gas Analyzer 02/H2S/CO/Combustibles 50/day Micro Max Gas Analyzer 02/H2S/CO/COI Combustibles 50/day 4 Gas Meter 50/day Magnehelic Pressure Set 20/day Digital Readout Thermocouple 25/day Drager Detector Tubes/Pump 15/each Dewatering Pump (Trash Pump) 45/day MiniRae 2000/3000 PID: • Daily Rate 150/day • Weekly Rate 500/week • Monthly Rate 1,500/month Air Sampling Station: • Daily Rate 50/day • Weekly Rate 200/week Pipe Laser: • Daily Rate 50/day • Weekly Rate 220/week • Monthly Rate 650/month Water Trailer 75/day PAS 3000 Personal Air Sampling Pump 25/day Tedlar Bag(10-Liter) 40/each Non-Contaminating Air Sampling Pump 25/day Offices Nationwide 0 IEXHIBIT"A" Page 17 of 22 SCS Field Services Fee Schedule far Equipment and Analysis Mayl , 2017 through April 30, 2018 Page 2 Rate ($) Interface Probe 50/day Submersible Pump: • Daily Rate 50/day • Weekly Rate 150/week • Monthly Rate 450/month Water Level Indicator: • Daily Rate 20/day • Weekly Rate 60/week • Monthly Rate 180/month 100-Foot Temperature Probe: • Daily Rate 15/day • Weekly Rate 45/week • Monthly Rate 135/month ......................Teflon Well Bailer 10/each Vacuum Box/Carbon Canister and Blower 150/day Tool Truck 144/day No. 14 P.E. Fusion Machine(1"-4"): • Daily Rate 90/day • Weekly Rate 450/week • Monthly Rate 1,800/month No. 26 P.E. Fusion Machine(2"-6"): • Daily Rate 125/day • Weekly Rate 625/week • Monthly Rate 2,500/month ---- -No.28 P.E. Fusion Machine(2"-8") • Daily Rate 160/day • Weekly Rate 800/week • Monthly Rate 3,200/month No. 412 P.E. Fusion Machine(4"-12"): • Daily Rate 250/day • Weekly Rate 1,250/week • Monthly Rate 5,000/month EXHIBIT"A" Page 18 of 22 • $CS Field Services Fee Schedule for Equipment and Analysis Moyl , 2017 through April 30, 2018 Page 3 Rate ($) No. 618 P.E. Fusion Machine (6"-18"): • Daily Rate 450/day • Weekly Rate 2,250/week • Monthly Rate 9,000/month No. 824 P.E. Fusion Machine(8"-24"): • Daily Rate 800/day • Weekly Rate 4,000/week • Monthly Rate 16,000/month Trackstar 500 Fusion Machine • Daily Rate 425/day • Weekly Rate 1,500/week • Monthly Rate 4,050/month Sidewinder Fusion Machine 100/day Electrofusion Processor Machine: • Daily Rate 150/day • Weekly Rate 750/week • Monthly Rate 3,000/month Leister Extrusion Welding Gun 120/day Air Compressor 60/day Arc Welder 75/day Generator(3,500-Watt) 45/day Generator(5,000-Watt) 60/day Generator(6,000-Watt): • Daily Rate 65/day Generator(8,000 Watt): • Daily Rate 75/day • Weekly Rate 225/week Isolation Pinch-off Tools: • Daily Rate 25/day • Weekly Rate 75/week • Monthly Rate 225/month Plate Compactor 75/day Rammer/Jumping Jack Compactor 75/day EXHIBIT"A" Page 19 of 22 • SCS Field Services Fee Schedule for Equipment and Analysis Mayl , 2017 through April 30, 2018 Page 4 Rale ($) 4-Wheeler(ATV): • Daily Rate 50/day • Weekly Rate 150/week • Monthly Rate 450/month 4-Wheeler with 44" Mow Deck: • Daily Rate 100/day • Weekly Rate 300/week • Monthly Rate 900/month Riding Mower: • Daily Rate 175/day • Weekly Rate 525/week • Monthly Rate 1,575/month Chain Saw: • Daily Rate 10/day • Weekly Rate 30/week • Monthly Rate 90/month Horiba Water Quality Meter: • Daily Rate 40/day • Weekly Rate 120/week • Monthly Rate 360/month Hydrogen Sulfide Meter: • Daily Rate 100/day • Weekly Rate 300/week • Monthly Rate 900month Infrared Thermometer: • Daily Rate 10/day • Weekly Rate 30/week • Monthly Rate 90/month Micropurge Flow Cell (Groundwater): • Daily Rate 100/day • Weekly Rate 300/week • Monthly Rate 900/month EXHIBIT"A" Page 20 of 22 • SCS Field Services Fee Schedule for Equipment and Analysis Mayl , 2017 through April 30, 2018 Poge 5 Rate($) Oiless Compressor and Control Box(Groundwater): • Daily Rate 75/day • Weekly Rate 225/week • Monthly Rate 675/month Earth/Resistance Tester: • Daily Rate 100/day • Weekly Rate 300/week • Monthly Rate 900/month Pitot Tube and Gauges: • Daily Rate 10/day • Weekly Rate 30/week • Monthly Rate 90/month Pressure Washer: • Daily Rate 50/day • Weekly Rate 150/week • Monthly Rate 300month Turbidity Meter/Conductivity Meter: • Daily Rate 25/day • Weekly Rate 75/week • Monthly Rate 225/month Vacuum Air Pump: • Daily Rate 100/day • Weekly Rate 300/week • Monthly Rate 900/month Downhole Video Camera System 200/day Weed Trimmer: • Daily Rate 25/day • Weekly Rate 75/week • Monthly Rate 225/month EXHIBIT"A" Page 21 of 22 • • SCS Field Services Fee Schedule for Equipment and Analysis Mayl , 2017 through April 30, 2018 Page 6 Rafe ($) Safety Equipment: • Tyvek Suit(each) 15/each • Polyethylene suit(each) 20/each • Nitrile gloves (per pair) 15/each • PVC Gloves (per pair) I5/each • Rubber booties(per pair) 15/each • Organic Vapor Cartridges (per pair) 20/each • Organic Vapor/Acid Cartridges(per pair) 25/each • Cartridges pre-filters(per pair) I5/each • Half face respirator(each) 20/day • Full face respirator (each) 25/day • Ventilator/manhole blowers 25/day • Parachute harness 10/day • Tripod: - Daily Rate 35/day - Weekly Rate 105/week - Monthly Rate 315/month • SCBA 55/day General Terms I. Rates are in effect until April 30, 2018. Any work performed after that date will be subject to a new Schedule of Fees. 2. Equipment usage rates are exclusive of freight charges to and from the project site. Freight is an additional expense chargeable to the client. 3. Shipping, supplies, equipment rental,materials, vehicle mileage,and other non-labor equipment costs or direct costs are billed at cost plus 15 percent. 4. Equipment rented will be charged portal-to-portal from SCS Field Services offices. Renter is responsible for return charges. 5. The cost of equipment owned by SCS Field Services will not be subject to administrative mark-up. EXHIBIT"A" J Page 22 of 22 • • • EXHIBIT B SAMPLE PAYMENT REQUEST FORM Sample form for COMPLETE PROJECT NAME Payment Request RBNuo 0]2]I00 Project No.A%X% Invoice No.12345 Invoice Date: Total Amount Previous Total Percent Basic Services: Contract Amd No.1 Amd No.2 Contract Invoiced Invoice Invoice Complete Preliminary Phase $1,000 $0 $0 $1,000 $0 $1,000 $1,000 100% Design Phase 2,000 1,000 0 3,000 1,000 500 1500 50% Bid Phase 500 0 250 750 0 0 0 0% Construction Phase 2,500 0 1,000 3,500 0 0 0 0% Subtotal Basic Services $6,000 $1,000 $1250 $8,250 $750 $1500 $2,500 30% Additional Services: Permitting $2,000 $0 $0 $2,000 $500 $0 $500 25% Warranty Phase 0 1,120 0 1,120 0 0 0 0% Inspection 0 0 1527 1,627 0 0 0 0% Platting Survey TED TBD TBD TBD TBD TBD TED_ 0% 08 M Manuals TBD TBD TBD TBD TBD TED TBD 0% SCADA TBD TBD TBD TBD TBD TBD TBD 0% Subtotal Additional Services $2,000 $1,120 $1627 $4,747 $500 $0 $500 11% Summary of Fees Basic Services Fees $6,000 $1000 $1,250 $8,250 $750 $1,500 $2,500 30% Additional Services Fees 2,000 1,120 1,627 4,747 500 0 500 11% Total of Fees $5000 $2,120 $2,877 $12,887 $1,250 $1,500 $3,000 23% Contract for Professional Services Exhibit B EXHIBIT C Insurance Requirements Contract for Professional Services Exhibit C EXHIBIT C Insurance Requirements Onsite Outdoor Services 1.1 Consultant must not commence work under this agreement until all required insurance has been obtained and such insurance has been approved by the City. Consultant must not allow any subcontractor to commence work until all similar insurance required of any subcontractor has been obtained. 1.2 Consultant must furnish to the Director of Engineering Services with the signed agreement a copy of Certificates of Insurance (COI)with applicable policy endorsements showing the following minimum coverage by an insurance company(s) acceptable to the City's Risk Manager. The City must be listed as an additional insured on the General liability and Auto Liability policies, and a waiver of subrogation is required on all applicable policies. Endorsements must be provided with COI. Project name and or number must be listed in Description Box of COI. I TYPE OF INSURANCE MINIMUM INSURANCE COVERAGE 30-written day notice of cancellation, Bodily Injury and Property Damage required on all certificates or by Per occurrence - aggregate applicable policy endorsements Commercial General Liability including: $1,000,000 Per Occurrence 1. Commercial Broad Form $2,000,000 Aggregate 2. Premises— Operations 3. Products/Completed Operations 4. Contractual Liability 5. Independent Contractors 6. Personal Injury-Advertising Injury AUTO LIABILITY (including) $500,000 Combined Single Limit 1. Owned 2. Hired and Non-Owned 3. Rented/Leased PROFESSIONAL LIABILITY $1,000,000 Per Claim (Errors and Omissions) If claims made policy, retro date must be prior to inception of agreement, have EXHIBIT"C" Page 1 of 3 extended reporting period provisions and identify any limitations regarding who is insured. 1.3 In the event of accidents of any kind related to this agreement, Consultant must furnish the City with copies of all reports of any accidents within 10 days of the accident. 1.4 Consultant shall obtain and maintain in full force and effect for the duration of this Contract, and any extension hereof, at Consultants sole expense, insurance coverage written on an occurrence basis, by companies authorized and admitted to do business in the State of Texas and with an A.M. Best's rating of no less than A- VII. Consultant is required to provide City with renewal Certificates. 1.5 In the event of a change in insurance coverage, Consultant shall be required to submit a copy of the replacement certificate of insurance to City at the address provided below within 10 business days of said change. Consultant shall pay any costs resulting from said changes. All notices under this Article shall be given to City at the following address: City of Corpus Christi Attn: Engineering Services P.O. Box 9277 Corpus Christi, TX 78469-9277 1.6 Consultant agrees that with respect to the above required insurance, all insurance policies are to contain or be endorsed to contain the following required provisions: 1.6.1 List the City and its officers, officials, employees and elected representatives as additional insured by endorsement, as respects operations, completed operation and activities of, or on behalf of,the named insured performed under contract with the City with the exception of the professional liability/Errors & Omissions policy; 1.6.2 Provide for an endorsement that the"other insurance"clause shall not apply to the City of Corpus Christi where the City is an additional insured shown on the policy; 1.6.3 If the policy is cancelled, other than for nonpayment of premium, notice of such cancellation will be provided at least 30 days in advance of the cancellation effective date to the certificate holder; 1.6.4 If the policy is cancelled for nonpayment of premium, notice of such cancellation will be provided within 10 days of the cancellation effective date to the certificate holder. EXHIBIT"C" Page 2 of 3 1.7 Within five (5) calendar days of a suspension, cancellation or non-renewal of coverage, Consultant shall notify City of such lapse in coverage and provide a replacement Certificate of Insurance and applicable endorsements to City. City shall have the option to suspend Consultant's performance should there be a lapse in coverage at any time during this contract. Failure to provide and to maintain the required insurance shall constitute a material breach of this contract. 1.8 In addition to any other remedies the City may have upon Consultant's failure to provide and maintain any insurance or policy endorsements to the extent and within the time herein required, the City shall have the right to withhold any payment(s) if any, which become due to Consultant hereunder until Consultant demonstrates compliance with the requirements hereof. 1.9 Nothing herein contained shall be construed as limiting in any way the extent to which Consultant may be held responsible for payments of damages to persons or property resulting from Consultant's or its subcontractor's performance of the work covered under this agreement. 1.10 It is agreed that Consultant's insurance shall be deemed primary and non- contributory with respect to any insurance or self-insurance carried by the City of Corpus Christi for liability arising out of operations under this agreement. 1.11 It is understood and agreed that the insurance required is in addition to and separate from any other obligation contained in this agreement. EXHIBIT"C" Page 3 of 3