Loading...
HomeMy WebLinkAboutC2017-444 - 9/21/2017 - NA CITY OF CORPUS CHRISTI RENEWAL NO. 1 CONTRACT FOR CONSTRUCTION PHASE AND OBERSERVATION PHASE SERVICES The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City") and Engineering & Construction Management Services,LLC.("Consultant"),agree to the following amendments to the Contract for Construction Phase and Observation Phase Services for IDIQ Minor Street Improvements FY 2017-Renewal No. 1 (Project No. E17048): Original Contract I May 24, 2016 I Motion No. M2016-055 $176,880 1 In the Original Contract, Exhibit"A", Section I. Scope of Services shall be amended as set forth in the attached Renewal No. 1, Exhibit"A". In the Original Contract,Section Ill. Fees shall be amended as set forth in the attached Renewal No. 1,Exhibit"A" for a fee not to exceed $94,380, for a total restated fee not to exceed$271,260. All other terms and conditions of the May 24, 2016 Contract for Construction Phase and Observation Phase Services between the City and Consultant, and of any amendments to that contract, which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPUS CHRI I ENGINEERING&CONSTRUCTION MANAGEMENT SERVICES,LLC. • rt- os/„..04. Je H. Edmonds, P.E. Da Felix H. Ocanas Jr., P.E. Date Director of Engineering Services President 5001 Oakmont Corpus Christi, TX 78413 361-549-4576 ecros@att.net APPROVED AS TO LEGAL FORM 2017.09.20 08:20:45-05'00' Assistant City Attorney Date ATTEST Project No. El 7048 \ 'Leke" / ,�/ Accounting Unit: 1041-12430-051 lDate Account: 530215 Rebecca Huerta /� Activity' E17048011041EXP City Secretary 1 i/ Account Category: 30215 Fund Name- Street Fund Encumbrance No. —. 2017-444 9/21/17REV ICiVIS ,70481RENEWAL OF CONTRACT PROFESSIONAL SERVICES.DOC Engineering & Construction INDEXED EXHIBIT"A" CITY OF CORPUS CHRISTI,TEXAS IDIO Minor Street Improvements-FY17 Protect Number E17048(Renewal 1 to E16252/E16253) I. SCOPE OF SERVICES A. Basic Services. t- -- .. &entrea _ _ . ... . .: : . . :. . . .. . . .. . . , _ :. vim , _ .._ . . roquired towardo the award of the construction contract. 2. Construction Phase. The NE will perform contract administration to include the following: a. Participate in pre-construction meeting conference and provide a recommended agenda for critical construction activities and elements impacted the project. b. Review for conformance to contract documents, shop and working drawings, materials and other submittals. c. Review field and laboratory tests. d. Provide interpretations and clarifications of the contract documents for the contractor and authorize required changes, which do not affect the contractor's price and are not contrary to the general interest of the City under the contract. e. Make regular visits to the site of the Project to confer with the City project inspector and contractor to observe the general progress and quality of work, and to determine, in general, if the work is being done in accordance with the contract documents.This will not be confused with the project representative observation or continuous monitoring of the progress of construction. f. Prepare change orders as authorized by the City (coordinate with the City's construction division); provide interpretations and clarifications of the plans and specifications for the contractor and authorize minor changes which do not affect the contractors price and are not contrary to the general interest of the City under the contract. g. Make final inspection with City staff and provide the City with a Certificate of Completion for the project. h. As applicable, review and assure compliance with plans and specifications, the preparation of operating and maintenance manuals (by the Contractor) for all equipment installed on this Project. These manuals will be in a"multimedia format" suitable for viewing with Microsoft's Internet Explorer,version 3.0. As a minimum the Introduction, Table of Contents, and Index will be in HTML (HyperText Markup Language) format, with HyperText links to the other parts of the manual. The remainder of the manual can be scanned images or a mixture of scanned images and text. Use the common formats for scanned images - GIF, TIFF, JPEG, etc.. Confirm before delivery of the manuals that all scanned image formats are compatible with the image-viewing software available on the City's computer - Imaging for Win95(Wang)and Microsoft Imaging Composer. Deliver the manuals on a CD-ROM, not on floppy disks. Hcnr Conwe.ad.wee GIG E1642812 EXHIBIT A LARGE 1010 Renewal r A.era do. RENEWAL NO. 1 EXHIBIT"A" Page 1 of 5 • i. Review construction"red-line"drawings, prepare record drawings of the Project as constructed (from the "red-line" drawings, inspection, and the contractor provided plans)and deliver to the Engineering Services a reproducible set and electronic file (AutoCAD r.14 or later) of the record drawings within two (2) months of final acceptance of the project. All drawings will be CADD drawn using dwg format in AutoCAD,and graphics data will be in dxf format with each layer being provided in a separate file. Attribute data will be provided in ASCII format in tabular form. All electronic data will be compatible with the City GIS system. The City staff will: a. Prepare applications/estimates for payments to contractor. b. Conduct the final acceptance inspection with the Engineer. B. Additional Services(ALLOWANCE) This section defines the scope(and ALLOWANCE)for compensation for additional services that may be included as part of this contract, but the NE will not begin work on this section without specific written approval by the Director of Engineering Services. Fees for Additional Services are an allowance for potential services to be provided and will be negotiated by the Director of Engineering Services as required. The A/E will, with written authorization by the Director of Engineering Services, do the following: 1. Construction Observation Services. Provide a project representative(PR)to provide periodic construction inspection. A. Through such additional observations of Contractor's work in progress and field checks of materials and equipment by the PR and assistants,the NE shall endeavor to provide further protection for the CITY against defects and deficiencies in the work. B. The duties and responsibilities of the PR are described as follows: 1. General: PR will act as directed by and under the supervision of NE,and will confer with NE regarding PR's actions. PR's dealings in matters pertaining to the Contractor's work in progress shall in general be with NE and Contractor, keeping the CITY advised as necessary. 2. Conference and Meetings: Attend meetings with Contractor, such as pre- construction conferences, progress meetings, job conferences and other project- related meetings as required by the City, and prepare and circulate copies of minutes thereof. 3. Liaison: A. Serve as liaison with Contractor, working principally through Contractor's superintendent and assist in understanding the intent of the Contract Documents. B. PR shall communicate with CITY with the knowledge of and under the direction of NE 4. Interpretation of Contract Documents:Report when clarifications and interpretations of the Contract Documents are needed and transmit to Contractor clarifications and interpretations as issued. 5. Shop Drawings and Samples: A. Receive Samples, which are furnished at the Site by Contractor, and notify of availability of Samples for examination. B. Record date of receipt of Samples and approved Shop Drawings. 11%01y ContractAblecycie GAG F1E4282 EXHIBIT Auace 1010 RW...E I A.Ona doc RENEWAL NO. 1 EXHIBIT"A" Page 2 of 5 C. Advise Contractor of the commencement of any portion of the Work requiring a Shop Drawing or Sample submittal for which PR believes that the submittal has not been approved. 6. Review of Work and Rejection of Defective Work: A. Conduct on-Site observations of Contractor's work in progress to assist A/E in determining if the Work is in general proceeding in accordance with the Contract Documents. B. Report whenever PR believes that any part of Contractor's work in progress will not produce a completed Project that conforms to the Contract Documents or will prejudice the integrity of the design concept of the completed Project, or has been damaged, or does not meet the requirements of any inspection, test or approval required to be made; and advise City and A/E of that part of work in progress that PR believes should be corrected or rejected or should be uncovered for observation, or requires special testing, inspection or approval. C. Observe whether Contractor has arranged for inspections required by Laws and Regulations, including but not limited to those to be performed by public agencies having jurisdiction over the Work. 7. Records: A. Maintain orderly files for correspondence, reports of job conferences, reproductions of original Contract Documents including all Change Orders,Field Orders, Work Change Directives, Addenda, additional Drawings issued subsequent to the Contract, NE's clarifications and interpretations of the Contract Documents, progress reports, Shop Drawing and Sample submittals received from and delivered to Contractor,and other Project related documents. B. Prepare a daily report utilizing approved City format,recording Contractor's hours on the Site, weather conditions, data relative to questions of Change Orders, Field Orders,Work Change Directives,or changed conditions,Site visitors,daily activities,decisions,observations in general, and specific observations in more detail as in the case of observing test procedures; and send copies to NE and the City. 8. Reports: A. Furnish periodic reports as required of progress of the Work and of Contractor's compliance with the progress schedule and schedule of Shop Drawing and Sample submittals. B. Report immediately to the CITY and NE the occurrence of any Site accidents, any Hazardous Environmental Conditions, emergencies, or acts of God endangering the work, and property damaged by fire or other causes. C. Provide project photo report on CD-ROM at the rate of a minimum of two photographs per day, including an adequate amount of photograph documentation of utility conflicts. 9. Completion: A. Before the issue of Certificate of Completion, submit to Contractor a list of observed items requiring completion or correction. B. Participate in a final inspection in the company of NE,the CITY,and Contractor and prepare a final list of items to be completed or corrected. C. Observe whether all items on final list have been completed or corrected and make recommendations concerning acceptance and issuance of the Notice of Acceptability of the Work. 2. Start-up Services. Provide on-site services and verification for all start-up procedures during actual start up of major Project components,systems,and related appurtenances if needed and required. Hxro cororactAufetyde cac El6420,2 BMW"A LARGE IDC Renewal+A.Ona>a RENEWAL Na t EXHIBIT"A" Page 3 of 5 • 3 Warranty Phase. Provide a maintenance guaranty inspection toward the end of the one- year period after acceptance of the Project. Note defects requiring contractor action to maintain,repair,fix, restore,patch,or replace improvement under the maintenance guaranty terms of the contract. Document the condition and prepare a report for the City staff of the locations and conditions requiring action,with its recommendation for the method or action to best correct defective conditions and submit to City Staff. Complete the inspection and prepare the report no later than sixty(60)days prior to the end of the maintenance guaranty period. 4 Provide the services above authorized in addition to those items shown on Exhibit"A-1" Task List,which provides supplemental description to Exhibit"A". Note: The Exhibit"A-1" Task List does not supersede Exhibit"A". 2. SCHEDULE Day Date Activity Friday July 21, 2017 Contract Award/NTP Tuesday July 25, 2017 Begin Construction Wednesday July 25, 2018 Complete Construction 3. FEES A. Fee for Basic Services. The City will pay the A/E a fixed fee for providing for all "Basic Services" authorized as per the table below. The fees for Basic Services will not exceed those identified and will be full and total compensation for all services outlined in Section I.A.1-4 above,and for all expenses incurred in performing these services. The fee for this project is subject to the availability of funds. The Engineer may be directed to suspend work pending receipt and appropriation of funds. For services provided in Section I.A.1-4,NE will submit monthly statements for basic services rendered. In Section I.A.1-3, the statement will be based upon NE's estimate (and City concurrence) of the proportion of the total services actually completed at the time of billing. For services provided in Section I.A.4,the statement will be based upon the percent of completion of the construction contract. City will make prompt monthly payments in response to A/E's monthly statements. B. Fee for Additional Services. For services authorized by the Director of Engineering Services under Section I.B."Additional Services,"the City will pay the NE a not-to-exceed fee as per the table below: Summary of Fees I Basic Services Fees .., r—,-.�.;arT,-.,o=oPhase N/A Phase N/A 3---Bid Phase N/A 4. Construction Phase 12x2241.75x$90 $41,580 Subtotal Basic Services Fees $41.580 Additional Services Fees(Allowance) H CM ConbedetleuyUe CBG E164252 EXHIBIT A LARGE mN Renewal 1 A om.ao- RENEWAL NO. 1 EXHIBIT"A" Page 4 of 5 • 4,-Perfnit-Preparatien N/A N/A N/A N/A 5. Construction Observation Services(12x22x4x$90) $52,800 6,--Stairt-up-SenAses N/A 7. Warranty Phase Included in 5 Above Sub-Total Additional Services Fees Authorized $52,800 Total Authorized Fee $94,380 H 1Clly CorflaSLLRaCWle GAG E164162 EXHIBIT A LARGE IDIQ Renewal 1 A.Orta aoo RENEWAL NO.1 EXHIBIT"A" Page 5 of 5 • EXHIBIT "A-1" TASK LIST (Provides supplemental description to Exhibit"A". Exhibit"A-1"Task List does not supersede Exhibit"A.") CITY OF CORPUS CHRISTI, TEXAS IDIQ Minor Street Improvements-FY17 Project Number-E17048(Renewal 1 to El 6252/16253)) Basic Services (See Exhibit "A") Additional Services: CONSTRUCTION OBSERVATION SERVICES 1) Provide construction observation services as authorized by the City in accordance with Exhibit'A' of the Contract for Professional Services. 2) Conduct daily site visits to the project site during construction. 3) Prepare monthly reports and submit to City staff as required. 4) Provide detailed coordination with City staff during construction. 5) Coordinate construction activities with materials testing laboratory. PUBLIC INVOLVEMENT PHASE 1) Assist the City in preparing notices, handouts and exhibits for public information meetings. 2) Assist the City in conducting the public information meetings. 3) Assist the City with follow-up and response to citizen comments. 4) Revise contract drawings to address citizen comments, as directed by the City. WARRANTY PHASE Upon receiving authorization from the City to proceed,conduct a maintenance guaranty inspection toward the end of the one-year period after acceptance of the project. Note defects requiring contractor action to maintain, repair, fix, restore, patch, correct or replace improvements under the maintenance guaranty terms of the construction contract. Document the condition and prepare a report for the City staff of the locations and conditions requiring action. RENEWAL NO. 1 H WRy Con alta ilaryde C&G E184203 EXHIBIT A.1 TASK LIST LARGE AE 1010 Renewal I A.QT¢Eoc EXHIBIT"A-1" Page 1 of 1