Loading...
HomeMy WebLinkAboutC2017-454 - 10/9/2017 - NA TASK ORDER NO. 18 This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. (Consultant) dated August 16, 2016 (Agreement). Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. PROJECT NAME/NUMBER: Water and Wastewater Treatment On-Call Support, E16264 1. PROJECT DESCRIPTION—This project provides the Utility Department with on-call services to assist with any technical,operational,maintenance,diagnostic and design concerns for the City's O.N.Stevens Water Treatment Plant and six wastewater treatment plants. 2. SCOPE OF SERVICES—O.N. Stevens Water Treatment Plant Sodium Permanganate Bulk Storage and Chemical Feed Improvements. 3. COMPENSATION —The total amount not to exceed for Task Order No. 18 only is $51,888.60. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS C I LNV, INC. _ ,,a7/7 /,�//7 Jeff . Edmonds, P.E. D / r DanrS. Leyendecker, P.E. Date Director of Engineering Services President 801 Navigation, Suite 300 Corpus Christi, TX 78408 (361)883-1984 Office loganb@Invinc.com Fund Name Accounting Unit Account No. Activity No. Amount Water 2015 CIP 4096-062 550950 E16264-01-4096-EXP $51,888.60 2017-454 10/09/17 LNV Inc. INDEXED City Project No. E16264 Professional Services Contract City of Corpus Christi Water/Wastewater Treatment On-Call Support Task Authorization No. 18 - ONSWTP Sodium Permanganate Bulk Storage and Chemical Feed Improvements September 20, 2017 la141, Exhibit A Page 1 of 5 LNV 0,-;„41 111 SCOPE OF WORK Project No.E16264 Water and Wastewater Treatment On-Call Support Task Authorization No. 18-ONSWTP Sodium Permanganate Bulk Storage and Chemical Feed Improvements PURPOSE The City of Corpus Christi operates one(1) water treatment plant, O.N. Stevens Water Treatment Plant (ONSWTP), which has a rated capacity of 161.5 million gallons per day (MGD). Along with the conventional water treatment processes that are employed to provide treated water (i.e., coagulation, flocculation, sedimentation, filtration, and disinfection), ONSWTP utilizes sodium permanganate (NaMn04)as a pretreatment step in its water treatment process to control the growth of algae in the influent raw water and provide pre-oxidation benefits.The current injection location and the lack of formal mixing do not allow for efficient pretreatment of the influent water. The NaMnO4 chemical feed is manually controlled by operators which does not allow for effective dosing,particularly as the water production at the ONSWTP changes. Along with these concerns, there are currently no bulk storage facilities for NaMnO4; therefore, ONSWTP staff must haul quantities of NaMnO4 to the injection location frequently, which poses potential safety hazards. The purpose of this task authorization is to provide assistance to the City staff by furnishing a Design Basis Report related to the design and implementation of a NaMnO4 feed system and its associated chemical storage facility. This report will provide a cost analysis, required exhibits and guidelines for the development of contract documents,specifications and construction plans pertaining to the implementation of the NaMnO4 system and its associated chemical storage facility. SCOPE OF WORK ADDITIONAL SERVICES: ITEM 9—General Engineering The Engineer will perform the following: 1. Conduct up to two (2) site visits to assess the existing NaMnO4 system, including the current transportation and handling practices, existing storage facilities, chemical injection location,and mixing methods. 2. Evaluate the existing NaMnO4 dosing and overall chemical usage for the influent raw water,along with the mixing strategy for chemical dispersion. 3. Perform laboratory tests to determine the effect of different NaMnO4 doses on chlorine demand and determine the required current dose of NaMnO4 for the plant. 4. Determine the required dose of NaMnO4 for future plant capacity of 200 MGD. 5. Develop design elements and determine the full scope of project based on condition and capacity assessments.These design elements include: Exhibit A Page 2 of 5 ,„. LNV 5 • Chemical tank and containment area • Chemical feed system • Storage facility • Identifying associated plumbing,electrical and instrumentation improvements. 6. Prepare a detailed Design Basis Report that will include the following: • Challenges associated with the current system • Recommended measures for improvement • Detailed cost analysis • Exhibits • Guidelines for the development of contract documents specifications and construction plans necessary for the implementation of recommended measures DELIVERABLES The Engineer will prepare a DRAFT Design Basis Report to the City for review and comment.Upon receipt of comments,the Engineer will incorporate the necessary changes and submit one (1)hard copy and one (1)electronic copy of the FINAL Design Basis Report. SCHEDULE The Engineer's services shall be performed in a timely manner consistent with sound professional practices. The Engineer will complete the work according to the following schedule: Activity Completion Date Contract Execution-Notice to Proceed(NTP) TBD Item 9—General Engineering • DRAFT Submittal 6 weeks after NTP • FINAL Submittal 12 weeks after NTP The time limits set forth in the schedule shall include allowances for reasonable and expected review time by the City and approval by authorities having jurisdiction over this project,and shall not be allowed as cause for delay or adjustments to the schedule. Delays caused by review times by the City exceeding those anticipated by the Engineer's schedule are cause for adjustments in the schedule. Any adjustments made to the agreed upon schedule shall be made in writing and accepted by both parties. The Engineer shall begin work immediately upon receipt of the executed Task Authorization and/or Notice to Proceed(written or emailed). FEE The services will be provided on a Time and Materials (T&M) basis as the project is moved towards completion.The anticipated amount for this task authorization is$51,888.60,as shown in ATTACHMENT A. If the level of effort exceeds this estimate,a separate task authorization will be requested. Exhibit A Page 3 of 5 o/U5 Ci,+ • • LNV TASK AUTHORIZATION MANAGER The Task Authorization Manager will be the primary contact person during the performance of this work. All correspondence or inquiries should be addressed to the Task Authorization Manager. This work task will be coordinated by: Dan Grimsbo,P.E.A.I.C.P. Executive Director of Utilities Department City of Corpus Christi Office:361-826-1874 Fax:361-826-1889 Email: DanG@cctexas.com APPROVAL The undersigned has reviewed and approved this Task Authorization and recommends LNV, Inc. to perform the work as presented: Rec.-mended by: MA/ N` (Pi v (Printed Name) 1/ 4 f (Date) Exhibit A Page 4 of 5 Attachment A Task Authorization No. 18 Man-hour and Fee Analysis Task LNV Inc. Description Principal/VP Project Mgr. Project Engineer EIT IV EIT II Sr. CADD/GIS Tech CARD Tech Expenses Admin Fee TOTALS $ 195.00 $190.00 $165.00 $ 115.00 $105.00 $ 90.00 $ 80.00 Sub -total Hrs. Total Hrs. Total Fee Hrs. Sub -total Hrs. Sub -total Hrs. Sub -total Hrs. Sub -total Hrs. Sub -total Hrs. Sub -total Hrs. Sub -total Sub -total Sub -total 1 General Engineering 2 $ 390 10 $ 1,900 $ 1,900 32 32 $ 5,280 $ 5,280 48 $ 5,520 72 $ 7,560 48 $ 4,320 24 $ 1,920 $ 2,272.60 236 $ 29,162.60 Task Hazen and Sawyer Description Regional Mgr/VP Vice President Associate Engineer Sr Principal/Engineer Assistant/ EIT $ 303.00 $283.00 $173.00 $ 163.00 $106.00 Hrs. Sub -total Hrs. Sub -total Hrs. Sub -total Hrs. Sub -total Hrs. Sub -total 1 General Engineering 2 $ 606 4 $ 1,132 12 $ 2,076 64 $ 10,432 80 $ 8,480 Sub -totals 2 $ 606 4 $ 1,132 12 $ 2,076 64 $ 10,432 80 $ 8,480 Expenses Sub -total TOTALS Total Hrs. Total Fee $ 162 $ 22,726.00 $ $ 162 $ 22,726.00 $ 51,888.60 Exhibit A Page 5 of 5 EXHIBIT B TASK ORDER SUMMARY MASTER SERVICE AGREEMENT WATER AND WASTEWATER ON-CALL SUPPORT PROJECT NO.E16264 TASK ORDER NOT TO EXCEED DESCRIPTION AMOUNT AMOUNT Original Contract(June 2,2016) $35,000.00 Amendment No.1 Master Service Agreement(August 16,2016) $600,000.00 Maximum Contract Amount $635,000.00 TASK ORDERS: Task Order No. I $14,914.00 Greenwood Wastewater Treatment Plant Generator Sizing Task Order No.2 $14,575.00 Whitecap Wastewater Treatment Plant South Clarifier Scum System Rehab Task Order No.3 $24,350.00 Electrical Support for ONSWTP Intermediate Sludge Removal Phase 1 Task Order No.4 $167,588.00 Water System Operations Monitoring and Support Task Order No.5 $33,524.00 Public Communication on City-Wide Water Quality Task-Order No.5B $10,996.00 Public Communication on City-Wide Water Quality Task Order No.6 $21,373.00 Monthly Water Quality Mtgs and Alt ONSWTP Residuals Mgmt Evaluation Task Order No.7 $45,792.00 Implementation and Administration of General Engineering Services Task Order No.8 $61,380.00 Planning Level Assessment of ONSWTP Chlorine Gas System Task Order No.88 $4,325.00 Planning Level Assessment of Power&Substation Capacity for Future Disinfection System Task Order No.9 $7,052.00 ONSWTP Facilities Optimization Plan Update Task Order No. 10 $13,332.00 Distribution System Control Strategy Task Order No. 11 $7,090.00 Foundation Design&Windstorm Inspection/Certification for FRP Bldg at ONSWTP Task Order No.14 $16,800.00 Hydraulic Modeling of 48-inch Transmission Main Closures Task Order No.15 $13,050.00 Development of Wastewater Capital Improvement Program FY 2018-2022 Task Order No.18 $51,888.60 ONSWTP Sodium Permanganate Bulk Storage and Chemical Feed Improvements Task Order Total $508,029.60 Amount Remaining on Contract $126,970.40