Loading...
HomeMy WebLinkAboutC2017-475 - 11/7/2017 - NA CITY OF CORPUS CHRISTI CONTRACT FOR PROFESSIONAL SERVICES AMENDMENT NO. 2 The City of Corpus Christi, Texas. a Texas home-rule municipal corporation ("City") and Urban Engineering ("Consultant"). agree to the following amendments to the Contract for Professional Services for La Volla Creek Drainage Channel Excavation (Project No. E10200) Original Contract January 10, 2012 Motion No. M2012-003 I $138,000 Amendment No. 1 February 17,2015 Motion No. M2015-020 $197,646 In the Original Contract. Exhibit A, Section I. Scope of Services shall be amended as set forth in the attached Amendment No.2, Exhibit A. In the Original Contract, Section III. Fees shall be amended based on the modified scope of services in the attached Amendment No. 2, Exhibit A for a fee not to exceed $7,200, for a total restated fee not to exceed $342,846. All other terms and conditions of the January 10, 2012 Contract for Professional Services between the City and Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPU H r STI URBAN ENGINEERING 1 Nov 2017 7/7 Jeff . Edmonds. P.E. a, Rhodes Urban, P.E., R.P.L.S. Date Director of Engineering Services Principal 2725 Swantner Drive Corpus Christi, TX 78404 (361) 854-3101 Office APPROVED AS TO LEGAL FORM (361) 854-6001 Fax chipu@urbaneng.com -440 g- 11/7/17 Assistant City Attorney Date ATTEST (1C/e/L{---(1A.A1 /N ( ±-2 City Secretary Date Project Number E10200 Accounting Unit 4530-043 Account 550950 Activity E10200-01-4530-EXP Account Category 50950 Fund Name Storm Wtr 2015 2017-475 11/07/17 NATERIE 10200 LA VOLLA CREEK DRAINAGE CHANNEL EXCAVATIONWMENOMENT NO 21CONTRACT DOC REV 10/1/15 Urban Engineering INDEXEb u RBAN [ Li, ir ENGINEERING Job No. 42468.00.00 Amier / September 18, 2017 Jeff Edmonds, P.E. City of Corpus Christi Engineering Services P.O. Box 9277 Corpus Christi, TX 78469-9277 Subject: E10200 La Volla Creek Drainage Channel Excavation, Contract Amendment 2 Dear Mr. Edmonds: The city's project manager, Daniel Deng, has requested that Urban Engineering provide a supplement to the Design Memorandum for the La Volla Creek Drainage Channel Excavation Project. It is my understanding that HDR Engineering has completed a study that has revised the tailwater elevation that Urban Engineering used to complete its hydraulic study of the anticipated benefits of the La Volla Creek Drainage Channel Excavation Project. Therefore, we propose to re-run the hydraulic model and provide revised exhibits and conclusions based on the new information. Our findings will be presented in a supplement to the existing Design Memorandum. We do not anticipate the need to revise plans or specifications. However, we do anticipate the need to update the city's contract documents to current standards and revised bidding information. We propose to do this for an additional lump sum fee of $7,200. If this is acceptable, please amend our contract accordingly. Thank you. Sincerely, URBAN ENGINEERING , 1 ' - Rhodes "Chip" Urban, P.E., R.P.L.S. RCU/ Cc: File (361)854-3101 2725 SWANTNER DR.• CORPUS CHRISTI,TEXAS 78404 FAX (361)854 6001 www.urbaneng.com Exhibit A TBPE Firm#145 Page 1 of 1 TBPLS Firm#10032400