FMAC TASK ORDER AGREEMENT
This FACILITIES MULTIPLE AWARD CONTRACT TASK ORDER AGREEMENT(ORDER) is between
the City of Corpus Christi, a Texas home-rule municipal corporation (CITY), acting through its
duly authorized City Manager or designee, the Director of Engineering Services or City
Engineer, and $arcom Construction. Inc. (CONTRACTOR), acting by and through its duly
authorized representative, Michael Douglas (Name), General Manaaer(Title). The parties
agree as follows:
1. This ORDER is issued under the Facilities Multiple Award Contract Master Agreement
signed on July 26, 2016, pursuant to Request For Proposals No. 2016-04. All terms and
conditions of the Master Agreement pertain to this ORDER.
2. CONTRACTOR was selected for award of this ORDER under Request for Task Order
Proposal (RFTOP) No. E14O69.
3. CONTRACTOR shall construct and complete certain improvements in accordance with
the plans and specifications described in Exhibit "A" (attached and incorporated herein),
perform all work as provided in said plans and specifications, and do such additional work as
may be considered necessary to complete the work in a satisfactory and acceptable manner
(the"Work").The CITY reserves the right to make such changes in the plans and specifications
and in the character of the work as may be necessary or desirable. Authorization for all
--
changes must be made in writing. The CONTRACTOR shall furnish all labor, tools, material,
machinery, equipment and incidentals necessary to the prosecution of the Work unless
otherwise provided by the written terms of the plans and specifications.
4. The work described in the Task Order documents shall be completed within 12
Calendar Days of Notice To Proceed.
5. In consideration of the completion of the above-described Work, the CITY agrees to
pay to CONTRACTOR the amount of$49.580.00 for City Project#E14O69 American Bank
Center Refurbish Selena Restrooms 111 and 3131 Floor — Phase 1 . Said payment shall
be conditioned upon the acceptance of the work by the CITY as certified by its final inspection
following the receipt of notice from the CONTRACTOR that the work is completed and ready
for acceptance. Upon completion of work and before acceptance and final payment is made,
the CONTRACTOR shall clean and remove from the work site all surplus and discarded
materials, temporary structures and debris of every kind in order to leave the work site in a
neat, orderly condition, equal to that which originally existed. The CONTRACTOR shall submit
a notarized affidavit that bills for all labor, equipment, materials and supplies associated with
the project have been paid before final payment is released.
Proj E14069
pg. 1
Rev 7/2016
INDEXED
FMAC TASK ORDER AGREEMENT
This FACILITIES MULTIPLE AWARD CONTRACT TASK ORDER AGREEMENT(ORDER) is between
the City of Corpus Christi, a Texas home-rule municipal corporation (CITY), acting through its
duly authorized City Manager or designee, the Director of Engineering Services or City
Engineer, and Barcom Construction, Inc. (CONTRACTOR), acting by and through its duly
authorized representative, Michael Douglas (Name), General Manager (Title). The parties
agree as follows:
1. This ORDER is issued under the Facilities Multiple Award Contract Master Agreement
signed on July 26, 2016, pursuant to Request For Proposals No. 2016-04. All terms and
conditions of the Master Agreement pertain to this ORDER.
2. CONTRACTOR was selected for award of this ORDER under Request for Task Order
Proposal (RFTOP) No. E14069.
3. CONTRACTOR shall construct and complete certain improvements in accordance with
the plans and specifications described in Exhibit "A" (attached and incorporated herein),
perform all work as provided in said plans and specifications, and do such additional work as
may be considered necessary to complete the work in a satisfactory and acceptable manner
(the"Work"). The CITY reserves the right to make such changes in the plans and specifications
and in the character of the work as may be necessary or desirable. Authorization for all
changes must be made in writing. The CONTRACTOR shall furnish all labor, tools, material,
machinery, equipment and incidentals necessary to the prosecution of the Work unless
otherwise provided by the written terms of the plans and specifications.
4. The work described in the Task Order documents shall be completed within 17
Calendar Days of Notice To Proceed.
5. In consideration of the completion of the above-described Work, the CITY agrees to
pay to CONTRACTOR the amount of$49,580.00 for City Project #E14069 American Bank
Center Refurbish Selena Restrooms 1LI and 3rd Floor — Phase 1 . Said payment shall
be conditioned upon the acceptance of the work by the CITY as certified by its final inspection
following the receipt of notice from the CONTRACTOR that the work is completed and ready
for acceptance. Upon completion of work and before acceptance and final payment is made,
the CONTRACTOR shall clean and remove from the work site all surplus and discarded
materials, temporary structures and debris of every kind in order to leave the work site in a
neat, orderly condition, equal to that which originally existed. The CONTRACTOR shall submit
a notarized affidavit that bills for all labor, equipment, materials and supplies associated with
the project have been paid before final payment is released.
Proj E14069
pg. 1
Rev 7/2016
6. All work shall be performed in a workmanlike manner and to the satisfaction of the
CITY. The CITY shall determine the quality and acceptability of materials furnished, work
performed, manner of performance, rate of progress of the Work, sequence of construction
and interpretation of the plans and specifications.
7. The CONTRACTOR agrees to provide Performance/Payment Bonds and insurance as
required and outlined in the Task Order documents.
S. The CONTRACTOR shall, at all times, observe and comply with City, federal, state and
county laws, ordinances or regulations which in any manner affect the conduct of the Work.
The CONTRACTOR shall be responsible for procuring all legally required building, plumbing,
electrical and other permits and licenses, pay all charges and fees, and give all notices
necessary and incidental to the due and lawful prosecution of the Work, unless otherwise
provided by the written terms of the plans and specifications.
9. This Agreement or the Work provided may not be assigned or subcontracted by
CONTRACTOR without the written permission of the CITY.
Proj E14069
pg. 2
Rev 7/2016
IN WITNESS WHEREOF this Agreement is executed.
CITY OF CORPUS CHRISTI CONTRACTOR:
Digitally signed by Jeff Edmonds
DN:cn=Jeff Edmonds,o,—Engineering,
email=jeffreye@cctexas.mm,c=US
Date:2017.04.1010:03:46-05'00' Barcom Construction, Inc.
J.H. Edmonds, P.E. Company
Director of Engineering Services
Digitally signed by Elaine R.Hoffman
Elaine R. Hoffman DN on AcoteR Hoffman @barn m°° US d°°
Inc.,ou=Atct.email=Blaine@barcom.cc..US
Date.2017.04.04 11.3828-05'00'
Original Authorized Signature
Date Elaine R. Hoffman, President
Print Name and Title
04/04/17
Date
Approved as to Legal Form
Aimee Alcorn-Reed 5826 Bear Lane
2017.04.06 10:12:48-05'00' Address
Asst. City Attorney Cornus Christi, TX 78405
City, State, Zip
361/851-1000 * 361/8S1-1717
Date Phone/Fax
Elaine@barcom.cc
Email
1030-13606-734
SS0910 E14069-01-1030 Exp
Funding Source
Proj E14069
pg. 3
Rev 7/2016
March 10, 2017
Justin McComb
Barcom Construction
5826 Bear Lane
Corpus Christi, TX 78405
SUBJECT: JOC1Large Construction Contract Phase I
Project No. E14069
American Bank Center Refurbish Selena Restrooms 1st and 3rd Floors
Ladies/Gentlemen:
This letter constitutes a Notice to Proceed for you to begin construction on Phase I for accelerated
31 Floor improvements to meet a major event on 24 March 2017 at the American Bank Center.
You are hereby advised that all project signs, barricading and signage, as required by the plans
and specifications, shall be in place and approved prior to the beginning of any construction
operations. As provided in the contract documents, all work on Phase I of this project is to be
completed within 17 calendar days after construction is begun.
For Phase I of this project, Kevin McCord, Project Manager, shall be the City's representative on
all matters concerning the project. He can be reached at 3611826-3550. All work is to be
completed in a manner satisfactory and acceptable to the City's representatives as a strict
requirement for fulfilling the contract.
Please note, Phase 2 of the project will be issued within 10 working days to complete
improvements for 1 I and 31 Floor per plans and specifications.
Resident inspection on the project will be provided by the City under the direction of George_ _ De
La Cerda. Please notify Mr. De La Cerda 48 hours prior to beginning construction.
Sincere)
.H. Edmonds, P.E.
Director of Engineering Services
JHEIsa
Attachment
cc: Jeff Edmonds,Engr Valerie Gray,Exec,Dir.Public Works Kevin McCord,Engr
Thomas Steiner,Constr Wayne Otto,Constr Kent Power,Constr
Dana Espinal,Constr Amy Ellzondo,Constr Brenda While,Engr
Jennifer Weitzer,Engr Zenona Casas,Engr John Meyer,ABC
George De La Cerda,Constr Melinda Cantu-Martin,Engr Jerry shoemaker,Engr
Building / job
CONSTRUCTION ,
5826 Bear Lane
Corpus Christi,Texas 78405
Proposal 361-851-1000
361-851-1717 fax
ABC Restroom Renovation barcom.cc
Temporary Finishes on 3rd Floor
Date 2/6/17
Proposal #2779B -revised Email: david.taylor@roberts-
taylor.com
TO: Roberts, Taylor& Sensabaugh PROJECT: ABC Restroom Renovation
Attn: David Taylor 1901 N Shoreline
3833 South Texas Avenue, Suite 201 Corpus Christi, TX
Bryan Texas, 77802
We propose to furnish labor and material to perform the following:
Work required to get the 3rd Floor partial operational by the end of the March 2017,
pending and executed Contract no later than March 9d', 2217
Items include in the 3rd floor temporary completion list are as follows;
• Furnish and install sinks
• Furnish and install counter supports—laminate (with a color currently in stock)
• Furnish and install laminate counter top
• Furnish and install a total of 6 plywood toilet partitions (3 in women's and 3 in
men's)
• Furnish and install restroom accessories (for stalls with partitions - TP holders,
Paper towel holders, grab bars, mirrors)
• Furnish and install light fixtures above sinks
• Install HVAC Grills
We include bonds and insurance constant with normal City of Corpus Christi
requirements.
Exclusions to this proposal:
• Building permit(one has already been pulled by previous contractor)
• All responsibility for material and labor currently in place
• All responsibility and warranty for items previously purchased and not yet
installed
• Rework for any trade due to failed or outstanding inspections.
• Any deadline or schedule previously agreed to or set in place under previous
contract
• Responsibility to any sub previously on the project and expenses, liens or bond
claims that are outstanding as a result of the previous contractor.
• Matching existing finishes on rework as a result of items being discontinued or
not currently available, or different lot numbers.
With currently lead times we are requesting 17 days for construction. Contract needs to
be executed by 3-9-17
Subtotal $49,580.00
Sales tax (8.25%) 00.00
Total amount of proposal 49 580 00
Forty Nine Thousand Five Hundred Eighty and 00/100 Dollars
Respectfully submitted,
BARCOM CONSTRUCTION, INC_
Justin Mccomk
Project Manager
JM
This proposal is void if not accepted in writing 30 days after this date; however, when
executed by both parties, it shall become the contract for the services described above.