HomeMy WebLinkAboutC2017-558 - 11/16/2017 - NA TASK ORDER NO. 2
This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus
Christi,Texas(City)and LNV, Inc.(Consultant)dated September 13,2016(Agreement). Consultant shall perform
services on the project described below as provided in this Task Order and in the Agreement. This Task Order
shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall
supplement the Agreement as it pertains to the project described below.
PROJECT NAME: Water System Process Control & Reliability
1. PROJECT DESCRIPTION — This project provides services for O.N. Stevens Water Treatment Plant
Analysis and Optimization, Water Distribution System Analysis and Optimization, Information System
Assessment, and SCADA Assessment.
2. SCOPE OF SERVICES — Replacement of Main Substation M-T-M Breaker Relays at PCR#1
3. COMPENSATION —The total amount not to exceed for Task Order No. 2 only is $61,300.00.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement
remain in full force and effect.
CITY OFC• ' ' dSCHRILNV, INC.
/6 /7 , 4444101:1 , .///41/7
Jeff H. Edmonds, P.E. Date Dan '. - •- rifer, P.E. Date
Director of Engineering Services Preside
801 Navigation, Suite 300
Corpus Christi, TX 78408
(361) 883-1984 Office
loganb@Invinc.com
Fund Name Accounting Unit Account No. Activity No. Amount
Water 2013 RVBD 4093-063 550950 E13031-01-4093-EXP $61,300
2017-558
11/16/17
LNV Inc.
INDEXED
City Project No. E13031
Professional Services Contract
City of Corpus Christi
Water System Process Control Reliability
Task Authorization No. 2 — Replacement of Main Substation
M-T-M Breaker Relays at PCR #1
November 8, 2017
1.111111
Exhibit A
Page 1 of 6
.
QPp u s C,
4i
LNV .4.1 .9w
SCOPE OF WORK
Project No. E13031
Water System Process Control Rehabilitation
Task Authorization No. 2—Replacement of Main Substation M-T-M Breaker Relays at
PCR#1
PURPOSE
The City of Corpus Christi operations one(1)water treatment plant,O.N. Stevens Water Treatment Plant.
which is rated for 161.5 million gallons per day (MGD). The Plant's electrical system distributes
approximately 6 megawatts of power at current loading. The Plant also participates in a State wide electrical
grid load shed program shifting plant load to onsite generators on an as needed basis. The Plant recently
replaced Multilin Feeder and Generator Breaker Relays. which had reached end of service life.through an
emergency memo and funding. Due to the complexity of the Multilin relays on the substations Main and
Tie breakers they were not replaced under maintenance funding,but require engineering design and support
The purpose of this Task Authorization is to provide the engineering services to design, program and
support the replacement of Main Substation M-T-M Breaker Relays at PCR #1. These relay will require
engineering design support to assure interaction with Auto-Transfer and Generator Controls PLC and
wiring to the new relays correctly.
SCOPE OF WORK
ADDITIONAL SERVICES:
Task 0100—O.N. Stevens Water Treatment Plant Analysis and Optimization
The Engineer will perlbrm the tollm%ing:
Task 0101-Project Management and Construction Observation Services
1. Attend meetings with City Staff and Contractors to ensure all project requirements and city
standards are met and proper coordination takes place at every stage of the project.
2. Prepare and distribute monthly progress reports to City staff and sub consultants.
3. Coordinate the scope of work,communications protocols,schedule.budget.standards and QA/QC
procedures for the project.
4. Prepare and submit project invoices to the City and coordinate with City's Project Manager.
Task 0102-Engineering,Programming and Construction Phase Services
I. Attend meeting with City Staff and Contractors to ensure all project requirement and city
standards are met and proper coordination takes place at every stage of the project.
2. Provide design and construction documents for replacement of relays at Mains and Ties of the
Main Substation PCR# 1.
Exhibit A
Page 2 of 6
40'tUi CN4'J
0 �
LNV •J -
•
3. Provide interface design of the relays to a new SCADA system Head End to be locate a the
plant Main Substation.PCR# 1
4. Provide Relay Settings for three(3)SEL 751 relays on Main,Tie,Main breakers.
5. Provide Relay Configuration and Program File for three(3)SEL 751 relays on Main.Tie,Main
breakers.
6. Add relay and data collection to SCADA system HMI program at PCR# I for three(3)SEL
751 relays on Main,Tie,Main breakers,Including configuring Two(2)data switches and one
(1)RTAC,and one(1)HMI
7. Provide Equipment Specification for SEL Relays
8. Provide Bid Tabulation with review comments.and recommendations.
9. Provide construction support and observation,assistance in testing.commissioning and startup
of the systems.
Task 0103-Training Services
I. Provide Training Reference Materials.
2. Develop Training Agenda as per City's needs.
3. Conduct Training Workshop for concerned City staff.
DELIVERABLES
The Engineer will prepare DRAFT design and construction documents for the replacement of relays at
Mains and Ties of the Main Substation PCR#1. Upon receipt of comments,the Engineer will incorporate
comments into the FINAL document and provide one (I) hard copy and one (I) electronic copy to the
designated City Task Authorization Manager specified under this authorization.
The Engineer will also prepare a letter of bid recommendation and provide one(1)electronic copy of the
letter of recommendation to the designated City Task Authorization Manager specified under this
authorization.
SCHEDULE
The Engineer's services shall be performed in a timely manner consistent with sound professional
practices. The Engineer will complete the work according to the following schedule:
Activity Completion Date
Contract Execution-Notice to Proceed(NTP) TBD
Task 0101-Project Management&Construction Observation Services 6 months after NTP
Task 0102-Engineering. Programming&Construction Phase Services 6 months after NTP
Task 0103-Training Services TBD based on City's
Request
The time limits set forth in the schedule shall include allowances for reasonable and expected review time
by the City and approval by authorities having jurisdiction over this project. and shall not be allowed as
cause for delay or adjustments to the schedule. Delays caused by review times by the City exceeding those
Exhibit A
Page 3 of 6
O�,Us Ck
. • • •
GJ�
LNV •
ti
anticipated by the Engineer's schedule are cause for adjustments in the schedule. Any adjustments made
to the agreed upon schedule shall be made in writing and accepted by both parties.
The Engineer shall begin work immediately upon receipt of the executed Task Authorization and/or Notice
to Proceed(written or emailed).
FEE
The total anticipated amount for Task Authorization No. 2 is$61,300.00 as shown in ATTACHMENT A.
The services for Task 0101- Project Management & Construction Observation Services will be provided
on a Time and Material (T&M)basis as the project is moved towards completion.
The services for Task 0102-Engineering, Programming&Construction Services and Task 0103-Training
Services will be provided on a Lump Sum basis.
If the level of effort exceeds the estimate shown in Attachment A. a separate task authorization will be
requested.
Exhibit A
Page 4 of 6
ppJS CN
. . .
CQ 9
LNV
0,77,6„.
vy
e"3
TASK AUTHORIZATION MANAGER
The Task Authorization Manager will be the primary contact person during the performance of this work.
All correspondence or inquiries should be addressed to the Task Authorization Manager. This work task
will be coordinated by:
Dan Grimsbo, P.E. A.1.C.P.
Executive Director of Utilities Department
City of Corpus Christi
Office: 361-826-1874
Fax: 361-826-1889
Email: DanG(alcctexas.com
APPROVAL
The undersigned has reviewed and approved this Task Authorization and authorizes LNV. Inc. to perform
the work as presented:
Recommended by:
,
//►7,S 2 (Printed Name)
N d ✓ (Date)
Exhibit A
Page 5 of 6
Attachment A
TA2- Replacement of Main Substation M -T -M Breaker Relays at PCR #1
Man-hour and Fee Analysis
Task
LNV Inc.
Description
Principal/VP
Project Mgr.
Project Engineer
EIT II
Expenses
TOTALS
$ 195.00
$ 190.00
$ 165.00
$ 105.00
5 150.00
Total Hrs.
Total Fee
Hrs. Subtotal
Hrs. Sub -total
Hrs. Sub -total
Hrs. Sub -total
Sub -total
0100
O.N. Stevens Water Treatment Plant Analysis & Optimization
Hrs.
_
r—
0101
Project Mangament & Construction
Observation Services
Subtotal
$ -
36
$ 6,840
20
$ 2,100
56
$ 8,940.00
$ 20,700
Sub -totals
0 $ -
36
$ 6,840
0
$ -
20
$ 2,100
$ -
56
$ 8,940.00
Task
0100
r
0102
Bath Engineering
Description
sr. Engineer
SCADA Controls Specialist
Sr. Designer
Jr. Designer
Exrases
pe
Fee
Admin Fee (10% of
subconsultant fee)
Total Fee
Total Hrs.
5 165.00
5 150.00
$ 120.00
$ 95.00
Hrs.
Sub -total
Hrs.
Subtotal
Hrs.
Sub -total
Hrs.
Subtotal
Sub -total
Subtotal
Subtotal
O.N. Stevens Water Treatment Plant Analysis & Optimization
Engineering, Programming &
Construction Phase Services
82
$ 13,530
138
$ 20,700
80
$ 9,600
$ -
$ 50.00
$ 43,880.00
$ 4,388.00
$ 48,268.00
300
P
0103
Training Services
8
S 1,320
$ -
20
$ 2,400
$ 3,720.00
$ 372.00
S 4,092.00
78
Sub -totals
90
$ 14,850.00
138
$ 20,700.00
100
$ 12,000
0
$ -
5 50.00
$ 47,600.00
$ 4,760.00
$ 52,360.00
328
TOTAL FEE =
Exhibit A
Page 6of6
$ 61,300.00
EXHIBIT B
TASK ORDER SUMMARY
MASTER SERVICE AGREEMENT
WATER SYSTEM PROCESS CONTROL& RELIABILITY
PROJECT NO. E13031
TASK NOT TO
ORDER EXCEED
DESCRIPTION AMOUNT AMOUNT
Original Contract(September 13,2016, M2016-101) $300,000
Maximum Contract Amount $300,000
TASK ORDERS:
Task Order No. 1 $44,338
5KM Model Update, Relay Settings for PCR#1, and Engineering Support
Task Order No.2 $61,300
Replacement of Main Substation M-T-M Breaker Relays at PCR#1
Task Order Total $105,638
Amount Remaining on Contract $194,362