Loading...
HomeMy WebLinkAboutC2017-569 - 12/7/2017 - NA CITY OF CORPUS CHRISTI CONTRACT FOR ENGINEERING DESIGN AMENDMENT NO. 1 The City of Corpus Christi,Texas,a Texas home-rule municipal corporation("City")and LNV.Inc.,("Consultant"), agree to the following amendments to the Contract for Professional Services for O.N.Stevens Water Treatment Plant Facilities Feed Optimization Improvements(Project No. E122111: Original Contract April 19, 2016 Motion No. M2016-040 $1,091,812 In the Original Contract, Exhibit A, Section I. Scope of Services shall be amended as set forth in the attached Amendment No.1, Exhibit A. In the Original Contract,Section III.Fees shall be amended based on the modified scope of services in the attached Amendment No. 1, Exhibit A for a fee not to exceed$48.900,for a total restated fee not to exceed $1.140,712. All other terms and conditions of the April 19,2016 Contract for Engineering Design Services between the City and Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPUS CHRISTI LNV,INC 6 • /Q641/J I q-7/11 ,..e ''' Margie C. ose Date Da . e -•:ecker, P.E. Date City Manager Pre '•- 801 Navigation, Suite 300 Corpus Christi, TX 78408 /2_ �7 (361)883-1984 Office Mark an V eck to (361)883-1986 Fax Assi ant C. Mana s er i loganb@Invinc.com i ),10140 V-1 e H. Gray, '' Da e f Exe utive Direc = ..11 • .' I t40 #�4-11-.... / y I J- H. Edmonds, P.E. gate Director of Engineering Services PPROVED AS TO LEGAL FORM 1 �..- 11/29/17 Accounting Unit 4096-061 Assistant City mey Date Account 550950 Activity E12211-01-4096-EXP ATTEST Account Category 50950 • i •� ZAQw...b.i. Fund Name Water 2015 CIP City ecretary Date 2017-5691 `41 ( 1 - 12/0712/0 /17 E,2211 ONS FACILITY FEED OPTIMIZATION iMPROVEMENTSL AMME•OI LENT NO I,CONTRACT DOC REV 101 15 LNV Inc. INDEXED • Solutions Today with a engineers I architects I surveyors Vision for Tomorrow October 30, 2017 Mr. Jeff Edmonds, P.E. Director of Capital Programs City of Corpus Christi P.O. Box 9277 Corpus Christi, Texas 78469-9277 RE: AMENDMENT NO. 1 TO PROFESSIONAL SERVICES CONTRACT O.N. Stevens Facilities Feed Optimization Improvements City Project E12211 Mr. Edmonds: In response to the City's request, we are proposing a revised Amendment No. 1 in the amount of $48,900.00 to provide additional services for the O.N. Stevens Facilities Feed Optimization Improvements Project(E12211)for a total re-stated project fee of$1,140,712. PROJECT BACKGROUND O.N. Stevens Facilities Feed Optimization Improvements Project is based upon the analysis and recommendations for improvements for alum, polymer, and liquid ammonium sulfate (LAS)facilities, along with select elements of sedimentation basin hydraulic improvements, and alkalinity adjustment outlined in the Facility Analysis Engineering Report for the O.N. Stevens Water Treatment Plant (ONSWTP) provided under City of Corpus Christi Project No. 8426, the Draft Design Memorandum for the ONSWTP Facilities Feed Optimization Improvements provided under Amendment No. 1 of City of Corpus Christi Project No. 8605 as submitted in January 2011, and the latest Design Basis Memorandum submitted in October 2016. The Chemical Facilities Improvements project has since been combined with the Raw Water Influent Improvements project for a single bid package as City Project E17047. The O.N. Stevens Facilities Feed Optimization Improvements engineering contract was originally scoped for$1,091,812. PURPOSE OF AMENDMENT NO. 1 The purpose of Amendment No. 1 is to provide a revision to the original project scope to implement chlorine dioxide injection design with the new raw water influent structures as well as additional roadway improvements for the chemical delivery route inside the plant. The chlorine dioxide system was previously constructed in early 2017 and has injection points at the existing raw water junction box. Injection points will be needed on the proposed raw water influent piping and pipe rerouting will be required for these new injection points. Additionally, the chemical delivery route pavement will be Amend.No.1,Exhibit A,Page 1 of 4 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 OFFICE 361 883 1984 I FAX 361.883.1986 i WWW.LNVINC.COM improved/replaced from the concrete pavement near Filter Building 1 along the road which wraps around the plant to the southwest,just south of the proposed South Alum facilities. DESIGN ELEMENTS The design elements which make up Amendment No. 1 are the following: A. Chlorine dioxide injection points at the proposed structure or piping (to be determined) and associated yard piping and control modifications. B. Approximately 3,700 SY of chemical delivery route pavement improvement/replacement from the end of concrete pavement northeast of Filter Building 1 to the proposed South Alum facilities. SCOPE OF WORK A. BASIC SERVICES: 1. Preliminary Phase (for chlorine dioxide injection only) i. Data Collection/Field Verification ii. Design Memorandum 2. Design Phase (for roadway improvements and chlorine dioxide injection) - as per Exhibit "A" in the original contract. ---- 3. Bid Phase (for roadway improvements and chlorine dioxide injection) - as per Exhibit "A" in the original contract. 4. Construction Administration Phase (for roadway improvements and chlorine dioxide injection)- as per Exhibit"A" in the original contract. B. ADDITIONAL SERVICES: 1. Permit Preparation - N/A 2. Topographic Survey (for roadway improvements only) - as per Exhibit "A" in the original contract. 3. Warranty Phase - N/A 4. Start-Up Services- N/A 5. Provide SCADA Documentation (for chlorine dioxide injection only) - as per Exhibit "A" in the original contract. 6. Project Coordination Services (for roadway improvements and chlorine dioxide ---- ----injection) -as per Exhibit"A" in the original contract. 7. Control System Integration (for chlorine dioxide injection only) - as per Exhibit "A" in the original contract. 8. Operations and Maintenance Manual and Training - N/A 9. Windstorm - WA 10. Process Automation System Development (for chlorine dioxide injection only) - as per Exhibit"A" in the original contract. Amend.No.1,Exhibit A,Page 2 of 0 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78008 OFFICE 361.883 1984 I FAX 361.883 1986 I WWW LNVINC.COM • SCHEDULE All work under Amendment No. 1 of this contract shall be completed by the Engineer in accordance with the revised overall project schedule provided below. ACTIVITY TIME TO COMPLETION CHLORINE DIOXIDE DESIGN MEMO 45 DAYS FROM NTP DESIGN PHASE 90% TBD DESIGN PHASE FINAL TBD BID PHASE TBD CONSTRUCTION PHASE TBD FEES A. Fees for Basic Services. The City will pay the ENGINEER the not-to-exceed fee shown in "ATTACHMENT 1" for services specified in this amendment. The fee will be full and total compensation for services and for all expenses incurred in performing these services. B. Fees for Authorized Additional Services. The City will pay the ENGINEER the not-to- exceed fee shown in "ATTACHMENT 1" for services specified in this amendment. The fee will be full and total compensation for services and for all expenses incurred in performing these services. C. Summary of Fees. Original Amendment No.1 Contract --. Contract Roadway C102 Total Basic Services Fees 1. Preliminary Phase $152,237 - $9,400 $161,637 2. Design Phase $524,317 $8,400 $22,820 $553,907 3. Bid Phase $13,620 $400 - $14,020 4. Construction Administration Phase $212,112 $2,000 - $214,112 Subtotal Basic Services Fees $902,286 $10,800 530,590 $943,676 Additional Services Fees (Allowance) 1. Permit Preparation $24,949 - - $24,949 2. Topographic Survey $1,600 $2,000 - $3,600 3. Warranty Phase $11,200 - - $11,200 4. Start-Up Services $14,946 - - $14,946 5. Provide SCADA Documentation $26,576 - $1,000 $27,576 6. Project Coordination Services $24,940 $300 $600 $25,840 7.Control System Integration $5,931 - $1,900 $7,831 8. Operations and Maintenance $14,349 - - $14,349 Manual 8 Training 9.Windstorm $4,660 - - $4,660 10. Process Automation System $60,375 - $1,710 $62,085 Development Subtotal Additional Services Fees $189,526 $2,300 $5,210 $197,036 Authorized Total Authorized Fee $1,091,812 $13,100 $35,800 $1,140,712 Amend.No.1,Exhibit A,Page 3 of 0 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 OFFICE 361 883 1984 I FAX 361.083.1986 I WWW.LNVI NC COM • If you have any questions or if you would like to discuss in more detail, please feel free to call me at 512-381-8333. Sincerely, Marcus Naiser, P.E. Vice President/ Project Manager LNV, Inc. TBPE Firm No. F-366 Amend.No.1.Exhibit A,Page 4 of 4 801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 OFFICE 361.883.1984 I FAX 361.883.1986 I WWW.INVINC.COM