HomeMy WebLinkAboutC2017-570 - 12/8/2017 - NA •
•
CITY OF CORPUS CHRISTI
CONTRACT FOR PROFESSIONAL SERVICES
RENEWAL NO. 3
The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City") and pipeline Analysis,
Li& ("Consultant"), enter into this Renewal No. 3 Contract for Professional Services for Wastewater Staff
program Support(Project No. E140381:
Ori inal Contract December 16,2014 Motion No. M2014-173 $1,200,000
Renewal No. 1 February 4, 2016 Administrative A..roval $1,200,000
Renewal No. 2 January 6,2017 Administrative Approval $1,200,000
Scope of Services shall be amended as set forth in the attached Renewal No. 3, Exhibit A.
Fees shall be amended based on the modified scope of services in the attached Renewal No.3,Exhibit A for a fee
not to exceed $1,200,000, for a total restated fee not to exceed $4,800.000.
All other terms and conditions of the December 16,2014 Contract for Professional Services between the City and
Consultant, and of any amendments, which are not specifically addressed herein shall remain in full force and
effect.
CITY OF CORP 't -ISTI PIPELINE ANALYSIS,LLC
/ ‘1
Jeff.' . Edmonds, P.E. a e Jam II. es, Jr., P.E Date
Director of Engineering Services 1115 Main et
Garland,TX 75040
(972)479-0655 Office
(972)479-0659 Fax
APPROVED��� AS TO LEGAL FORM jforbes@pipelineanalysis.com
„A/
• - 12-5-17
Assistant City Attorney Date
ATTEST
Ci Secretary Date 1,3-/I1
l t 1
Project Number E14038
Accounting Unit 4200-33400-042
Account 530235
Activity E14038-01-4200-EXP
Account Category 30235
Fund Name Wastewater Operating
2017-570
12/08/17 '.ASTEWATERlE14038 WW STAFF PROGRAM SUPPORTV2ENFWAI NO 31CONVRAC'O)C REV 10Y1/15
Pipeline Analysis LLC
INDEXED
r
PIPELINE ANALYSIS'
WASTEWATER COLLECTION ENGINEERS
October 20, 2017
J.H. Edmonds, P.E.
Director of Capital Programs
City of Corpus Christi
P.O. Box 9277
Corpus Christi, TX 78469-9277
Re: Wastewater Staff Support Program
City Project No. E14038
Request for Contract Renewal No. 3 of 4
Dear Mr. Edmonds.
The City of Corpus Christi Wastewater Staff Support Program project was awarded by the City
Council on December 16, 2014 by Motion No. M2014-173. The contract was authorized by City
Council to provide Professional Services over a 1-year base contract period with four (4) optional
1-year renewals for a total of five (5) years. The following table summarizes the previous project
renewals:
EA CONTRACT _ DATE APPROVAL PROCESS
Year 1 -Base December 30, 2014 City Council-M2014-173
Year 2-Renewal No.1 of 4 February 4, 2016 Administrative
Year 3-Renewal No. 2 of 4 December 7, 2016 Administrative
Per the contract documents, renewal is based on the needs of the City of Corpus Christi in
achieving its project objectives related to the review and correction of deficiencies in the
wastewater collection system, along with improvements to the performance and compliance of
the wastewater collection and treatment systems. Table 1 outlines the work that has been
conducted to date and additional short term tasks yet to be authorized. Projected needs exceed
funding and staff is currently prioritizing these needs. This renewal will be necessary to continue
providing requested services.
Pipeline Analysis LLC requests a 1-year contract renewal at a cost not to exceed $1,200,000.00.
We would agree to a renewal to provide requested Professional Services with the adjustment to
the current 2017 hourly rates (see Table 3) by category as allowed in the contract documents.
This renewal would bring the total contract cost to $4,800,000, as outlined in Table 2 and add
365 calendar days to the contract time from the Notice to Proceed date.
Per the contract documents, the fees for each task will be negotiated with staff based on an
approved man-hour breakdown and the hourly rates currently in force at the time of the task
authorization. The fees will be authorized through multiple task authorizations which detail the
scope of work and the schedule of work, along with the negotiated fee.
Renewal No. 3
Exhibit A
Page 1 of 5
1115 Main Street • Garland, Texas 75040 • 800-637-0164 or 972-479-0655 • fax: 972-479-0659
www.pipelineanalysis.com
•
If you have any questions or need additional information, please contact me at(800) 837-0164.
Sincerely,
Pipeline Analysis, LLC.
TBPE Firm No. F-6538
James H. Forbes, Jr., P.E.
President
CC: Daniel Deng, P.E.
Dan Grimsbo
Renwal No. 3
Exhibit A
Page 2 of 5
Table 1: Summary of Task Authorizations
Task Authorization Summary
City of Corpus Christi Project No. E14038 _
Total
Task Authorization Description Services
TA1—Basic Services;Maximo Software Upgrade Assessment Upgrade Maximo City-wide for Consent Decree tracking
Project Mgt Meetings; and reporting $ 396,491
•
TA2—Lift Station Condition Assessment checklist LS/ARV/FM Developed Checklist as Required by Consent Decree
Performed 15 Lift Station Assessments,force main
Inspections inspections and ARV inspections as Pilot Study $ 190,017
TA2A—Supplemental ARV Inspections Performed additional ARV Inspections per Consent
Decree Requirement $ 15,316
TA3—Clean and CCN Small Diameter Specification for Prepared for future Consent Decree bid package
outsourcing(<or equal to 18') $ 11,994
TA3—Clean and CCN Large Diameter Specification for Prepared for future Consent Decree bid package 15,538
outsourcing(>18") $
TA4—Manhole Inspection and Smoke Testing Year 1 Performed per Consent Decree-Year 1 Neighborhoods
Complete $ 610,733
TA5—Design Standards Updated for Consent Decree future remedial measures $ 40,270
TA6—Williams FM Evaluation Options Early Consent Decree Remedial Measures $ 5,193
TA7-Park Rd.LS Hydraulic Model Support Requested in support of Park Road Lift Station Design
and model update $ 7.335
TA8-MAXIMO 7.6 Implementation City-wide Maximo upgrade $ 652,783
TA9 Remedial Measures Assistance Prepare I01Q contract documents for Consent Decree
Remedial Measures $ 118,300
TA10-Active G Upgrade Maximo City-wide for Consent Decree tracking
and reporting/GIS Mapping applications $ 162,400
TA11-Odor Control APAI Requested by Temple Williamson to address system
odors $ 36,539
Requested cost estimate based on model for future
TA12-Cost Estimating-South of Oso development area South of Oso $ - 11,740
Consent Decree Field Verification Work Plan
TA13-Capacity Assessment/Field Verification Plan Development $ 77,753
TA14-On-going Hydraulic Modeling Support Special Hydraulic Modeling Requests $ 80,020.00
TA15-PACP Coding/Training Training in PACP required by Consent Decree $ 12,979
Total to Date $ 2,445,401
Estimated
Identified Future Task Authorizations Description Cost
I TA13A-Field Verification Implementation Consent Decree Field Verification of Potential Capacity $ 2,845,680
Constraints/Model Update
TA 16 Lift Station Condition Assessments Consent Decree Condition Assessment 102 Lift Stations $ 255,000.00
TA 16A Lift Station Calibrations Consent Decree Requirement TBD
TA18 Consent Decree Data Management/Reporting Assessment Review current data management practices and identify $ 52 89000
gaps for consent decree reporting
Identified Future Task Authorizations $ 3,153,570
Renewal No. 3
Exhibit A
Page 3 of 5
•
Table 2: Breakdown of Fees per Contract Period
Approved Approved Requ;;slad
Approved Base
Services Renewal No 1 Renewal No.2 Renewal NJo.3 Total
Contract 2015 2016 2017 2018
Basic $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 1,000,000
Additional $ 950,000 $ 950,000 $ 950,000 $ 950,000 $ 3,800,000
Total $ 1,200,000 $ 1,200,000 $ 1,200,000 S 1,200,000 $ 4,800,000
Participating
Firms
Pipeline Analysis, LLC
LNV Inc.
Alan Plummier Associates Inc.
Starboard
LJA,Inc.
Garza Bury
Active G
Blue Cypress Consulting
Renwal No. 3
Exhibit A
Page 4 of 5
Table 3 - 2018 HOURLY RATES
SCHEDULE OF HOURLY RATES
EFFECTIVE November 1,2017
Pipeline • Blue
UA Engr. Starboard
Classification Analysis, WV,Inc. Inc. Cons. Cypress
LLC. Consulting
I— L
Engineering/Planning/Professional
Principal/VP $180 $205 $210 $250 $250
Senior Project Manager,PE $180 $189 $185 $225
Project Manager,PE $150 $173 $160 $225
MAXIMO Functionllrain/QALead •
$210
MAXIMOTechnical Lead - $195
MAXIMO Application Developer - - $175
MAXIMOSupport Specialist - - $100
Senior Engineer,PE $150 $ 163 - •
Project Engineer II,PE $130 $ 152 - •
Project Engineer I,PE $ 142 -
Engineer IV,EIT - $ 131 • -
Engineer III,EIT •
$ 121 $140
Engineer II,EIT - $ 115 $120 -
Engineer I,EIT $ 105 $100 -
Senior CADDISurvey/GISTech $ 100 $105 $125
CADDIGIS Technician $85 $ 89 $90 •
Technician $45 - -
Construction Mgmtfnspection
Construction Superintendent '$ 105 -
Construction Obs II •
$ 90 $100 •
Construction Obs 1 $ 80 - •
Field Operations
Field Operations Manager $145 •
- •
SuperviseriCrew Leader $64 •
- •
CCTV Operator _ $64 - •
CCTVTechnician $45 - -
Survey!Field Operations
RPLS - $140 -
Superviser/Crew Leader - $115 -
2-Man Field Crew - $155 -
3-Man Field Crew - $180 -
GPS Equipment($Iday) — - -
GenerallClerlcal
Clerical $65 $68 $60 $79
Senior Admin Staff - -
Expenses
Overtime 150% 150% 150% -
Mileage(simile) $0.60 $0.75 -
Per Diem($/day) - $25 - $50 -
Expense Multiplier 1 10 1 10 1.10 1.10
nes:
1. Above rates are for work performed on an hourly basis and include overhead and profit
2 During the term of this agreement,rates may be adjusted by up to 4%annually
3 All work will be authorized through multiple task orders,as required.
4 UA Engineering Inc.formerly Coym,Rehmet Gutierrez lP
Renewal No. 3
Exhibit A
Page 5 of 5