HomeMy WebLinkAboutC2017-571 - 12/8/2017 - NA TASK ORDER NO. 16
This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus
Christi, Texas (City) and LNV, Inc. (Consultant) dated August 16, 2016 (Agreement). Consultant shall perform
services on the project described below as provided in this Task Order and in the Agreement. This Task Order
shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall
supplement the Agreement as it pertains to the project described below.
PROJECT NAME/NUMBER: Water and Wastewater Treatment On-Call Support, E16264
1. PROJECT DESCRIPTION-This project provides the Utility Department with on-call services to assist with
any technical,operational, maintenance, diagnostic and design concerns for the City's O.N. Stevens Water
Treatment Plant and six wastewater treatment plants.
2. SCOPE OF SERVICES - Modeling and Coordination for San Patricio Municipal Water District Transmission
Main Connection
3. COMPENSATION -The total amount not to exceed for Task Order No. 16 only is $15,220.
This Task Order is approved and Consultant may proceed. AH other terms and conditions of the Agreement
remain in full force and effect.
CITY OF CORPUS . I LNV, INC.
(-2 /- oi,eit617
Jeff H. dmonds, P.E ate -for ea I. Leyendecker, P.E. ate
Director of Engineering Services Pr: ident
801 Navigation, Suite 300
Corpus Christi, TX 78408
(361) 883-1984 Office
loganb@Invinc.com
Fund Name Accounting Unit Account No. Activity No. Amount
Water Operating 4010-062 550950 E16264-01-4010-EXP $15,220
2017-571
12/08/17
LNV Inc.
INDEXED
•
•
City Project No. E16264
Professional Services Contract
City of Corpus Christi
Water/Wastewater Treatment On-Call Support
Task Authorization No. 16 — Modeling and Coordination for
San Patricio Municipal Water District Transmission Main
Connection
November 6, 2017
LN11/
Task Order No. 16
Exhibit A
Page 1 of 5
LNV
SCOPE OF WORK
Project No. E16264
Water and Wastewater Treatment On-Call Support
Task Authorization No. 16—Modeling and Coordination
for San Patricio Municipal Water District Transmission Main Connection
PURPOSE
The San Patricio Municipal Water District(SPMWD)has begun coordination to tie into the City of Corpus
Christi's water distribution system in order to supply approximately 20 MGD to the Gulf Coast Ventures
project and provide up to 10 MGD additional capacity for future use. The proposed tie-in will be directly
downstream of the O.N. Stevens Water Treatment Plant (ONSWTP) and will most likely connect to one
(1)or more of the three(3)large transmission mains leaving the plant.
The purpose of this task authorization is to assist the City of Corpus Christi with the hydraulic modeling
and hydraulic analysis of the tie-in scenarios to simulate the demand being pulled and the consequent effect
on the City's water system. Due to the increased number of variables involved in the tie-in scenario. this
task authorization will also assist the City by coordinating with SPMWD and their designated consultants.
SCOPE OF WORK
ADDITIONAL SERVICES:
ITEM 9—General Engineering
The Engineer will perform the following:
1. Conduct a kick-off meeting with City staff.SPMWD staff and consultants.
2. Coordinate with SPMWD staff and consultants on project scope.requirements and different tie-in
options to be evaluated.
3. Perform a max day demand(approx. 125 MGD)steady-state hydraulic analysis of the system and run up
to three(3)scenarios to evaluate pressure impacts on the system.
4. Prepare a technical memorandum with required exhibits detailing the modeling results.
5. Conduct up to one(1)meeting with the City staff to present modeling results.
DELIVERABLES
The Engineer will prepare a DRAFT memorandum for the City's review and comment. Upon receipt of
comments, the Engineer will incorporate the comments and submit one (I) hard copy and one (I)
electronic copy of the FINAL memorandum.
Task Order No. 16
Exhibit A
Page 2 of 5
LNV
SCHEDULE
The Engineer's services shall be performed in a timely manner consistent with sound professional practices.
The Engineer will complete the work according to the following schedule:
Activity Completion Date
Contract Execution-Notice to Proceed(NTP) TBD
Item 9—General Engineering
• DRAFT Memorandum 9 weeks after NTP
• FINAL Memorandum 12 weeks after NTP
The time limits set forth in the schedule shall include allowances for reasonable and expected review time
by the City and approval by authorities having jurisdiction over this project. and shall not be allowed as
cause for delay or adjustments to the schedule. Delays caused by review times by the City exceeding those
anticipated by the Engineer's schedule are cause for adjustments in the schedule. Any adjustments made
to the agreed upon schedule shall be made in writing and accepted by both parties.
The Engineer shall begin work immediately upon receipt of the executed Task Authorization and/or Notice
to Proceed(written or emailed).
FEE
The services will be provided on a Time and Materials (T&M) basis as the project is moved towards
completion.The anticipated amount for this task authorization is 515,220.00 as shown in ATTACHMENT
A. If the level of effort exceeds the estimates provided,a separate task authorization will be requested.
Task Order No. 16
Exhibit A
Page 3 of 5
•
•
TASK AUTHORIZATION MANAGER
The Task Authorization Manager will be the primary contact person during the performance of this work.
All correspondence or inquiries should be addressed to the Task Authorization Manager. This work task
will be coordinated by:
Dan Grimsbo, P.E. A.I.C.P.
Executive Director of Utilities Department
City of Corpus Christi
Office: 361-826-1874
Fax: 361-826-1889
Email: DanG@cctexas.com
APPROVAL
The undersigned has reviewed and approved this Task Authorization and recommends LNV. Inc. to
perform the work as presented:
Recommended by:
W ✓r
G<.�'//k?St i (Printed Name)
O`// )(J 17 (Date)
Task Order No. 16
Exhibit A
Page 4 of 5
Attachment A
Task Authorization No. 16
Man-hour and Fee Analysis
Task
LNV Inc.
Description
Project Mgr. P oject Engineer CAOD Tech
TOTALS
Principal/VP
Project Mgr.
Project Engineer
EIT II
CADD Tech
Expenses
TOTALS
$ 195.00
$190.00
Total Hrs.
5165.00
5105.00
Kick-off meeting
$ 80.00
$ 570
Total Hrs.
Total Fee
Hrs.
Sub -total
Hrs.
I
ISub-total
1
Hrs.
Sub -total
S "7160.00
$ 7,260.00
Hrs.
ISub-total
Hrs.
Sub -total
Sub -total
9 General Eni;in
r.r9;
$ 5,550.00
[
38
38
15 7,220.00
$ 7,220.00
44
44
,.
4
420.00
4
$ 320
34
90 $11,220 00
Technical Memo (draft+hnal)
Sub -totals
$ 420.00
4
$ 320.00
$-
90
$15,220.00
Note: Basis of fee for reference
Task
LNV Inc.
Description
Project Mgr. P oject Engineer CAOD Tech
TOTALS
5190.00
$165.00
$ 80.00
Total Hrs.
Total Fee
Hrs.
Sub -total
Hrs.
Sub -total
Total Hrs.
Total Fee
Kick-off meeting
$ 570
3
$ 495
6
5 1,065.00
Coordination effort with SPMWD
24
$ 4,560
6
$ 990
30
$ 5,550.00
Hydraulic Modeling and Analysis
6
$ 1,140
28
$ 4,620
34
$ 5,760.00
Technical Memo (draft+hnal)
2
5 380
4
$ 660
4
$ 320.00
10
S 1,360.00
Meeting with City to present results
3
5 570
3
5 495
6
5 1,065.00
38
$7,220.00
44
$ 7,260.00
4
$ 320.00
86
5 14,800.00
Additional 4 hours for EIT for task authoritauon preparation
Note' and coordination (5420)
Task Order No. 16
Exhibit A
Page 5 of 5