HomeMy WebLinkAboutC2017-573 - 12/8/2017 - NA TASK ORDER NO. 13
This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus
Christi, Texas (City) and LNV, Inc. (Consultant) dated August 16, 2016 (Agreement). Consultant shall perform
services on the project described below as provided in this Task Order and in the Agreement. This Task Order
shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall
supplement the Agreement as it pertains to the project described below.
PROJECT NAME/NUMBER: Water and Wastewater Treatment On-Call Support, E16264
1. PROJECT DESCRIPTION—This project provides the Utility Department with on-call services to assist with
any technical,operational, maintenance,diagnostic and design concerns for the City's O.N.Stevens Water
Treatment Plant and six wastewater treatment plants.
2. SCOPE OF SERVICES— Harbor Bridge Waterline Relocation Modeling
3. COMPENSATION —The total amount not to exceed for Task Order No. 13 only is $13,265.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement
remain in full force and effect.
CITY OF CORPUS CH " LNV, INC.
fr
Jeff H. Ed, onds, P.E. D t Dan S. Ley-•• •cker, P.E. Date
Director of Engineering Services President
801 Navigation, Suite 300
Corpus Christi, TX 78408
(361) 883-1984 Office
loganb@Invinc.com
Fund Name Accounting Unit Account No. Activity No. Amount
Water Operating 4010-31010-062 530000 El 6264-01-4010-EXP $13,265
2017-573
12/08/17
LNV Inc.
INDEXED
City Project No. E16264
Professional Services Contract
City of Corpus Christi
Water/Wastewater Treatment On-Call Support
Task Authorization No. 13 — Harbor Bridge Waterline
Relocation Modeling
November 3, 2017
LNII
Task Order No. 13
Exhibit A
Page 1 of 7
. .
LNV
SCOPE OF WORK
Project No. E16264
Water and Wastewater Treatment On-Call Support
Task Authorization No. 13—Harbor Bridge Waterline Relocation Modeling
PURPOSE
The City of Corpus Christi has requested assistance with hydraulic modeling and hydraulic analysis of the
following scenarios using the updated 2017 City of Corpus Christi Water Model.
• Harbor Bridge waterline relocation
• Additional modeling scenarios for Flour Bluff TM and 2.5 MG EST
I. Harbor Bridge Waterline Relocation
The Harbor Bridge project includes the replacement of the existing Harbor Bridge and reconstruction of
portions of US 181, 1-37 and Crosstown Expressway. As a result of this project, several waterlines in
the Downtown area crossing the Crosstown Expressway and 1-37 are either going to be resized or
relocated.The proposed changes in waterlines are shown in Exhibit B.
The purpose of this task authorization is to assist the City by performing a hydraulic analysis of the
Downtown area to study changes in the water distribution system as a result of the proposed changes to
waterlines shown in Exhibit B. Results of the modeling support will aid City Staff in understanding the
impacts on water quality and system pressure to the Downtown area of the City as a result of the
proposed system changes.
II. Additional Modeling Scenarios for Flour Bluff TM and 2.5 MG EST •
LNV met with City staff on October 4,2017 to discuss the results of the modeling for Flour Bluff Transmission
Main (TM) Services and 2.5 MG EST location. As per the City's request during this meeting. additional
scenarios need to be modeled to enable the City to make a final decision on TM upgrades and EST locations.
Modeling the additional scenarios is beyond LNV's Amendment I scope for City Project E16290. As
a result. this task authorization will assist the City by modeling the requested additional scenarios and
enabling the City to make an informed decision on the Flour Bluff Transmission Main upgrades and 2.4
MG EST location.
Task Order No. 13
Exhibit A
Page 2 of 7
LNV
SCOPE OF WORK
ADDITIONAL SERVICES:
ITEM 9—General Engineering
The Engineer will perform the following:
I. Harbor Bridge Waterline Relocation
I. Perform a max day demand(approx. 125 MGD)steady-state hydraulic analysis of the system and run up
to two(2)scenarios to evaluate pressure impacts in the study area.
2. Run average annual demand(65 MGD)extended period simulations(EPS)and evaluate water age
impacts in the study area.
3. Prepare a technical memorandum detailing the modeling results.
4. Conduct up to one(I)meeting with the City staff to present modeling results.
II. Additional Modeling Scenarios for Flour Bluff TM and 2.5 MG EST
I. Run two additional modeling scenarios as specified below:
A.) Locate 2.5MG EST near existing Flour Bluff EST, reduce 42" along Yorktown to a 24",
increase 8"crossing Oso Bay to a 12",and upsize waterline along Flour Bluff Drive to a 20"
to evaluate water age results during a 10-day-65 MGD system demand scenario(include water
age results in the Harbor Lights area)
B.) Locate 2.5MG EST near existing Flour Bluff EST, reduce 42" along Yorktown to a 24".
increase 8"crossing Oso Bay to a 12",and upsize waterline along Flour Bluff Drive to a 20"
to evaluate pressure results during a 24-hour- 127 MGD system demand scenario
2. Prepare a technical memorandum derailing the modeling results for both scenarios.
3. Conduct up to one(I)meeting with the City to discuss results obtained.
DELIVERABLES
I. Harbor Bridge Waterline Relocation
The Engineer will prepare a DRAFT memorandum for the City's review and comment. Upon receipt of
comments. the Engineer will incorporate the comments and submit one (I) hard copy of the FINAL
memorandum.
---- -
II.Additional Modelling Scenarios for Flour Bluff TM and 2.5 MG EST
The Engineer will prepare a DRAFT memorandum for the City's review and comment. Upon receipt of
comments. the Engineer will incorporate the comments and submit one (I) hard copy of the FINAL
memorandum.
Task Order No. 13
Exhibit A
Page 3 of 7
•
LNV
SCHEDULE
The Engineers services shall be performed in a timely manner consistent with sound professional practices.
The Engineer will complete the work according to the following schedule:
Activity Completion Date
Contract Execution-Notice to Proceed(NTP) TBD
Item 9—General Engineering
I. Harbor Bridge Waterline Relocation
• DRAFT Memorandum 3 weeks after NTP
• FINAL Memorandum 5 weeks after NTP
II. Additional Modelling Scenarios for Flour Bluff TM and 2.5 MG EST
• DRAFT Memorandum 2 weeks after NTP
• FINAL Memorandum 4 weeks after NTP
The time limits set forth in the schedule shall include allowances for reasonable and expected review time
by the City and approval by authorities having jurisdiction over this project. and shall not be allowed as
cause for delay or adjustments to the schedule. Delays caused by review times by the City exceeding those
anticipated by the Engineer's schedule are cause for adjustments in the schedule. Any adjustments made
to the agreed upon schedule shall be made in writing and accepted by both parties.
The Engineer shall begin work immediately upon receipt of the executed Task Authorization and/or Notice
to Proceed(written or emailed).
FEE
The services will be provided on a Time and Materials (T&M) basis as the oroiect is moved towards
completion.The anticipated amount for this task authorization is$13,265.00 as shown in ATTACHMENT
A. If the level of effort exceeds the estimates provided. a separate task authorization will be requested.
Task Order No. 13
Exhibit A
Page 4 of 7
• •
•
LNV
TASK AUTHORIZATION MANAGER
The Task Authorization Manager will be the primary contact person during the performance of this work.
All correspondence or inquiries should be addressed to the Task Authorization Manager. This work task
will be coordinated by:
Dan Grimsbo. P.E. A.I.C.P.
Executive Director of Utilities Department
City of Corpus Christi
Office: 361-826-1874
Fax: 361-826-1889
Email: DanG@cctexas.com
APPROVAL
The undersigned has reviewed and approved this Task Authorization and recommends LNV. Inc. to
perform the work as presented:
Recomni44nded by:
•
/L & L
6Z/,,'156 (] (Printed Name)
(A/ (Date)
Task Order No. 13
Exhibit A
Page 5 of 7
•
m `' a C 0 0 0 CO
W in o to ti
s.0 tO
,—
Ts'"�' NN C N N QI—
Q+ C M M 4-1 z Q `—
_ !, N N W ca
Ts in ,. m Y Q_
En
~� HRI
N
C i'
W V1"
ll
L g
ILH
O un —
O O
So
O
CO =
to
u O
11 N O
tn
to N H
W O
O
M •N oo '" �n In
N
O IB ON O O
Q �a
,- p N
y N
Q 0C O N
• L Is'5.'
d O
U O C o 0
C C a e = I co
o co
C3 . NN tro
— .1-+ L N
O C
A o
� � m N
f
VN Ni ' t
Ci W
o
c O
0
ct. LA
cn 2
N
N
O
L.? I 7
C
O
7
0! C
z a'
I c ,n
1 = m
c
P. w
c I " z
3
tD
CIoup - r
1
C C
O_ C co O 4a
ci
C 1 a a 2 '...
uGI O
Q
0 l7 — = a
Yg
1-
•
•
•
s20--'7z' `' •}� *- 9 dl `96•Y•tt+1' . ` . v +,, 4.' -•.- 3 W
•
A dI9 9 / F'f' -e; • --.....4.-1
r
o r-
- w
w•
0F.'' 0.1'"'• "` 2f c tt ..,, — s { i
lio
(13
4.‘„ .,:__t* .; „----, .;,r 2 4P 64— ! • 4,6.1. is il, -) CY ..,'•
% 1 �
z' dl ' '
n�9V uIrab y
p • j g cy
E 116v a A
`
J % S�
z L i, r . 1 J .U 1 G. N w
J LL �' U r �� fi
W W t t rI
,� D p L [4
m eltbL Wr., . .0q dila ll, %—,d10 4z ci O •
' ' Z 3.'d 9, ".4g*. ;' �'`
1 T.
iritd B d9f/9 ti ',V' :4910 I a t- ` h•
Li
y J1Toa y dl9 4 w ' - AIJ.Z .11-404,111.P.4.161040.7,g v
v - a
. _� W 2 286 r .111
EOPATI
' . cp:-
m ..: , %Ir" pi- kt4yo. " �. - -`�
fr 0 _
* W '11.010, !�
�. /_• 0 •I � }t♦�9 1 �� • i ` i I
., �YY .' o r'y {ate :7t�•1�i414„,'. .�li,yk}�.abital. 1
�.. 1 n o 691 •
i 444th' ' " obfr �"
.::Jed ' . 4. .o 1.-Ai a �� d9d 9
^ i� -� , ,.I it ....11,) O 1 c-
V, ,w.' tl t' :y � 3
S -.(a 4. 14, i 1