Loading...
HomeMy WebLinkAboutC2017-586 - 12/19/2017 - NA CITY OF CORPUS CHRISTI CONSTRUCTION MATERIALS TESTING AMENDMENT NO. 1 The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City")and Rock Engineering & Testing Laboratory. Inc. ("Consultant"), agree to the following amendment to the Contract for Construction Materials Testing Services for O.N.Stevens Water Treatment Plant High Service Building No.3 and Clearwell No, 1 Renalr(Protect No. E110661: Original Contract August 16, 2016 ! Motion No. M2016-094 $54,765 Exhibit A, Scope of Services shah be amended as set forth in the attached Amendment No.1, Exhibit A. Fees shall be amended based on the modified scope of services in the attached Amendment No. 1,Exhibit A fora fee not to exceed $26.185.50,for a total restated fee not to exceed $80,950.50. All other terms and conditions of the August 16,2016 Contract for Construction Materials Testing Services between the City and Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPUS CHRISTI ROCK ENGINEERING&TESTING LABORATORY nig? y'�J�7r� 11-28-17 M rk an Vleck itis ock 1 �, Date Assistant City M.na•-r Chie Operating Officer • 6817 Leopard Street 1" 1' V Corpus Christi,361T78409X )8 3-4555Offce - re H. Gra ., f rate (361)8rocktetFax E - ri we Dir- • (361)8 3-471stiom Fax % / - /7 Je . dmonds, P. . D. e Director of Engineering Services APPROVED AS TO LEGAL FORM Accounting Unit 4093-041 Account 550920 Activity E11066-01-4093-EXP 12/7/17 Account Category 50920 Fund Name Water 2013 RVBD Assistant City 'orney Date Amount$19,593.34 Accounting Unit 4088-062 ATTEST Account 550920 �IR>Q I‘J-L l l t Activity E11066-01-0088-EXP Account Category 5092Q Rebecca Huerta Date Fund Name Water 2012 RVBD City Secretary '-,W a- (-yj Amount$6,592.16 2017-586 12/19/17 RIE11086 ONSWID HIGH SRVC BLDG NO LTEFINGIAMENBMENT NO.I.CON1RACT.DOC REV.10005 Rock Engineering& Testing INDEXED .4 • . • ' epi` J r•4, • GEOTECHNICAL ENGINEERING ♦ a CONSTRUCTION MATERIALS 105...,"" • O A "o ENGINEERING &TESTING so • SOILS•ASPHALT •CONCRETE 9•l• Thursday, September 07,2017 City of Corpus Christi 1201 Leopard St Corpus Christi,TX 78401 SUBJECT: ESTIMATED TESTING BUDGET FOR THE PROPOSED Mag Particle Testing-E11066 ONS WTP High Service Building No.3, and Clear Well No.1 Repair-Amendment No.1 Corpus Christi,TX RETL Proposal Number: P070816A1 Dear Mr. Edmonds, Rock Engineering and Testing Laboratory, Inc. (RETL)(TBPE Firm No.2101)is pleased to provide an amendment to perform the required Construction Materials Testing for the above referenced project. The Mag Particle Testing for the above referenced construction project Is based upon quantities as derived from the Information as provided to RETL as of the date of this proposal. Crew size will consist of(2)two technicians performing the work.We request that there is at least(2)two welds ready before being called out. • 25-72"Joints $14,375.00 TOTAL • 21 —60"Joints $9,660.00 TOTAL • 7-30"Joints $1,690.50 TOTAL • 1-54"Joint $460.00 TOTAL The estimated testing amount for this project is$26,185.50.This estimate will change and is dependent upon the actual scope of work perfomled as requested by project representatives. Requested services beyond what is contained in this estimate will be billed based on the unit rates contained here-in. Please make note that the actual fees invoiced for this project will be based on the actual testing requested and performed.The total fee assessed will be dependent on the contractor's construction techniques,number of trips made to the jobslte,elapsed time from technician arrival to commencement of testing activities,and any stand-by time the technician is required to be on-site but not performing testing activities. This estimate does not take into account project schedule,weather delays,and cancellations of services after arrival, etc. which are beyond RETL's control. Also note, that holiday/weekend rates do apply as well as overtime rates for services requested at an additional rate of$33.00 per hour. In order to best respond to the project testing needs and schedules,please schedule testing a minimum of 48 hours in advance in order to defer any potential delays.RETL strives to accommodate all testing requests as they are received and can make accommodations with advanced notice to schedules. RETL appreciates your consideration of our firm to assist you during the construction phase of your project.If you agree with this proposal, please sign the attached Laboratory Testing Services Agreement, submit the Distribution List and provide billing information. Please do not hesitate to contact me at (361) 883-4555 extension 415 if you have any questions regarding the proposal or would like to discuss further. Sincerely, 7 1 Pablo Schmitt Project Estimator Amendment No. 1 ROCK ENGINEERING&TESTING LABORATORY,INC. Exhibit A 6817 LEOPARD STREET•CORPUS CHRISTI,TEXAS.78409 Page 1 Of 1 OFFICE. (361)883-4555•FAX: (361)883-4711 •www.rocktesting.com