HomeMy WebLinkAboutC2017-587 - 12/19/2017 - NA • CITY OF CORPUS CHRISTI CONTRACT FOR ENGINEERING DESIGN SERVICES AMENDMENT NO.2 The City of Corpus Christi,Texas.a Texas home-rule municipal corporation(City')and),ockw'ood.Andrawa and Newnam.Inc.("ConsutanP),agree to the following amendments to the Contract for Engineering Design Services for Avers Street Pedaatdan knorovsments and Turn Lane Addition(SPID to GWliharl BOND 2014 Prop 2 fProlect No.El 01001: Original Contract May 17,2016 Ordinance No.030851 $513,625 Amendment No. 1 June 2,2017 Administrative Approval $49,900 In the Original Contract, Exhibit A, Section I. Scope of Services shall be amended as set forth in the attached Amendment No.2,Exhibit A. In the Original Contract,Section III.Fees shall be amended based on the modified scope of services in the attached Amendment No.2, Exhibit A for a fee not to exceed$29,905,for a total restated fee not to exceed$593A30. All other terms and conditions of the May 17,2016 Contract for Engineering Design Services between the City and Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPUS CHRISTI q LOCKW9ODD,,ANDREWS AND NEWNAM,INC. e " /^ 1 lZ l/ �J f Mark an Vieck Oa Ste n/ .G(breath, P.E. ate Ass'stant ity Ma age Associate 500 N.Shoreline Blvd.,Suite 905 it �� Carpus Christi,TX 78401 '► . ' _ _ (361)882-2257 Office �[ e H.Gra P. ate "r-' utive Dire. . blic or - Je H. Edmonds,P.E. Dat Director of Engineering Services APPROVED AS TO LEGAL FORM v 2017.12.1310:22:13 "-^"--"' -06'00' Assistant City Attorney Date Project Number E15106 ATTEST Accounting Unit 4091-041 Account550950 Activity E151Q6-01-4091-EXP Fund N metWate 5012 Re soca Huerta Date Fund Name Water 20128 RVBD City Secretary l a/a i4 1 .txcw[E9ING,n.n 2017-587rrnnrr...,Es,t.v;ns$ IDM.FNTkrncONTRK.nUo PE. .,,„ 12/19/17 Lockwood Andrews and Newnam INDEXED s Lockwood,Andrews &Newnam,Inc. A LEO A DALY COMPANY November 27, 2017 Mr. Jeff H. Edmonds, P.E. Director of Engineering Services City of Corpus Christi 1201 Leopard Street Corpus Christi, Texas 78401 Reference: Amendment 2 to Bond 2014 Proposition 2 - Ayers Street—SPID to Gollihar (Project No. E15106) Dear Mr. Edmonds: LAN respectfully requests that the City consider an amendment to our professional services agreement for the Ayers Street Pedestrian and Turn-Lane Improvements Project (E15106). The purpose of this Amendment is due to the unforeseen water utility relocations and SUE investigation related to the April 2017 authorization to redesign the street alignment, lane widths, and drainage systems. Backctround On February 21, 2017, LAN met with City Engineering staff regarding the potential loss of parking to business owners on the east side of the street, to review their concerns, determine how the issues may affect the design, and make recommendations to address the property owners'issues. At this meeting and a follow-up meeting on March 10th, LAN was asked to explore the potential of redesigning the street including reducing the lanes, removing all curb & gutter and replacing it with a concrete valley gutter, removing all 18-inch lateral pipes along the east right-of-way that provide for off-site drainage, add diagonal parking in front of the one property owners' business, and ultimately shift the entire alignment of the street to the west by six feet. In May 2017, LAN received Amendment 1, authorization to proceed, to redesign the street. After LAN redesigned the street shifting the entire alignment to the west by six feet, as authorized in Amendment 1, it became very clear that the water line infrastructure along the west right of way would now be impacted by the widened of the street and the installation of the storm system. The water utility infrastructure impacted includes: • Approximately 3800 LF of 8-inch ACP water distribution line • Approximately 1500 LF of 24-inch DIP water transmission main Scone of Work LAN has already researched and discussed with the Utility Department several options to either relocate, replace, or install new water utility infrastructure. Unfortunately, this work was not included in the scope of Amendment 1 nor was it foreseen in the original design of the roadway prior to shifting the alignment to the west. LAN has also provided additional coordination with the SUE form (Cobb Fendley), provided them with the redesigned street and storm water Amend. No. 2 500 N.Shoreline Blvd,Suite 905 • Corpus Chnsti,Texas 78401 • 361.882.2257 • www.lan-inc.com Exhibit A Page 1 of 3 • • Bond 2014 Proposition 2-Ayers Street(El 5106) Amendment 2 November 25, 2017 Page 2 infrastructure, requested Level A SUE, at multiple different locations, and are now waiting for that work to be completed and reported. The proposed re-design will require an additional level of effort for LAN to revise the 100% plans, specifications, and estimates before moving ahead to the final submittal. Revising the plans cannot happen until after the SUE is complete. LAN will also need additional time to coordinate with the Utility Department to determine the most appropriate method for replacing the 24-inch water transmission main. Compensation LAN is requesting approval of Amendment 2 for the costs associated with this increased level of effort. We are proposing a total fee for this Amendment to be $29,905.00 for a total restated fee of$593,430.00. The basis for this compensation is detailed in Attachment 1. Should you have any questions or require additional information, please contact me directly at 361-792-7225. Sincerely, Scott M. Harris, P.E. Team Leader/ Regional Manager Attachments: 1. Basis of Compensation Copy: Chris Hale, P.E. Amend. No. 2 Exhibit A Page 2 of 3 • • Attachment 1 Basis of Compensation The proposed re-design will require an additional level of effort for LAN to revise the 100% plans, specifications, and estimates before moving ahead to the final submittal. Revising the plans cannot happen until after the SUE is complete. LAN will also need additional time to coordinate with the Utility Department to determine the most appropriate method for replacing the 24-inch water transmission main. Below reflects the hours involved per sheet to redesign this project: Team Leader Senior Construction Sheet S heel/Task Description QAIDC Manager Technician Fee Estimates of Quantities 2 2 $982 Demolition&Removal PLans 1 2 $601 Water Utility Plans 1 1 48 $8,601 Water Utility Profiles 1 48 $6,641 Connection Details 2 28 $5,018 Miscellaneous Details 2 24 $4,518 Front End Docs,Bid Tab 2 $1.546 Specifications 2 $1938 Tobl Hour' 4 5 152 $29,905.00 In summary, the estimated total fee for this Amendment will be $29.905.00 for a total restated fee of$593,430.00. Amend. No. 2 Exhibit A Page 3 of 3 500 N.Shoreline SW.Suite 905 • Corpus Christi, 1 8 Texas 78401 • 1682.22 57 • www.Nmmc.can