The City of Corpus Christi,Texas.a Texas home-rule municipal corporation(City')and),ockw'ood.Andrawa and
Newnam.Inc.("ConsutanP),agree to the following amendments to the Contract for Engineering Design Services
for Avers Street Pedaatdan knorovsments and Turn Lane Addition(SPID to GWliharl BOND 2014 Prop 2
fProlect No.El 01001:
Original Contract May 17,2016 Ordinance No.030851 $513,625
Amendment No. 1 June 2,2017 Administrative Approval $49,900
In the Original Contract, Exhibit A, Section I. Scope of Services shall be amended as set forth in the attached
Amendment No.2,Exhibit A.
In the Original Contract,Section III.Fees shall be amended based on the modified scope of services in the attached
Amendment No.2, Exhibit A for a fee not to exceed$29,905,for a total restated fee not to exceed$593A30.
All other terms and conditions of the May 17,2016 Contract for Engineering Design Services between the City and
Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full
force and effect.
CITY OF CORPUS CHRISTI q LOCKW9ODD,,ANDREWS AND NEWNAM,INC.
e " /^ 1 lZ l/ �J f
Mark an Vieck Oa Ste n/ .G(breath, P.E. ate
Ass'stant ity Ma age Associate
500 N.Shoreline Blvd.,Suite 905
it �� Carpus Christi,TX 78401
'► . ' _ _ (361)882-2257 Office
�[ e H.Gra P. ate
"r-' utive Dire. . blic or -
Je H. Edmonds,P.E. Dat
Director of Engineering Services
APPROVED AS TO LEGAL FORM
v 2017.12.1310:22:13
"-^"--"' -06'00'
Assistant City Attorney Date
Project Number E15106
ATTEST Accounting Unit 4091-041
Account550950
Activity E151Q6-01-4091-EXP
Fund N metWate 5012
Re soca Huerta Date Fund Name Water 20128 RVBD
City Secretary l a/a i4 1
.txcw[E9ING,n.n
2017-587rrnnrr...,Es,t.v;ns$ IDM.FNTkrncONTRK.nUo PE. .,,„
12/19/17
Lockwood Andrews and Newnam
INDEXED
s
Lockwood,Andrews
&Newnam,Inc.
A LEO A DALY COMPANY
November 27, 2017
Mr. Jeff H. Edmonds, P.E.
Director of Engineering Services
City of Corpus Christi
1201 Leopard Street
Corpus Christi, Texas 78401
Reference: Amendment 2 to Bond 2014 Proposition 2 - Ayers Street—SPID to Gollihar
(Project No. E15106)
Dear Mr. Edmonds:
LAN respectfully requests that the City consider an amendment to our professional services
agreement for the Ayers Street Pedestrian and Turn-Lane Improvements Project (E15106). The
purpose of this Amendment is due to the unforeseen water utility relocations and SUE
investigation related to the April 2017 authorization to redesign the street alignment, lane widths,
and drainage systems.
Backctround
On February 21, 2017, LAN met with City Engineering staff regarding the potential loss of parking
to business owners on the east side of the street, to review their concerns, determine how the
issues may affect the design, and make recommendations to address the property owners'issues.
At this meeting and a follow-up meeting on March 10th, LAN was asked to explore the potential
of redesigning the street including reducing the lanes, removing all curb & gutter and replacing
it with a concrete valley gutter, removing all 18-inch lateral pipes along the east right-of-way that
provide for off-site drainage, add diagonal parking in front of the one property owners' business,
and ultimately shift the entire alignment of the street to the west by six feet. In May 2017, LAN
received Amendment 1, authorization to proceed, to redesign the street.
After LAN redesigned the street shifting the entire alignment to the west by six feet, as authorized
in Amendment 1, it became very clear that the water line infrastructure along the west right of
way would now be impacted by the widened of the street and the installation of the storm system.
The water utility infrastructure impacted includes:
• Approximately 3800 LF of 8-inch ACP water distribution line
• Approximately 1500 LF of 24-inch DIP water transmission main
Scone of Work
LAN has already researched and discussed with the Utility Department several options to either
relocate, replace, or install new water utility infrastructure. Unfortunately, this work was not
included in the scope of Amendment 1 nor was it foreseen in the original design of the roadway
prior to shifting the alignment to the west. LAN has also provided additional coordination with
the SUE form (Cobb Fendley), provided them with the redesigned street and storm water
Amend. No. 2
500 N.Shoreline Blvd,Suite 905 • Corpus Chnsti,Texas 78401 • 361.882.2257 • www.lan-inc.com Exhibit A
Page 1 of 3
•
•
Bond 2014 Proposition 2-Ayers Street(El 5106)
Amendment 2
November 25, 2017
Page 2
infrastructure, requested Level A SUE, at multiple different locations, and are now waiting for that
work to be completed and reported.
The proposed re-design will require an additional level of effort for LAN to revise the 100% plans,
specifications, and estimates before moving ahead to the final submittal. Revising the plans
cannot happen until after the SUE is complete. LAN will also need additional time to coordinate
with the Utility Department to determine the most appropriate method for replacing the 24-inch
water transmission main.
Compensation
LAN is requesting approval of Amendment 2 for the costs associated with this increased level of
effort. We are proposing a total fee for this Amendment to be $29,905.00 for a total restated
fee of$593,430.00. The basis for this compensation is detailed in Attachment 1.
Should you have any questions or require additional information, please contact me directly at
361-792-7225.
Sincerely,
Scott M. Harris, P.E.
Team Leader/ Regional Manager
Attachments:
1. Basis of Compensation
Copy: Chris Hale, P.E.
Amend. No. 2
Exhibit A
Page 2 of 3
•
•
Attachment 1
Basis of Compensation
The proposed re-design will require an additional level of effort for LAN to revise the 100% plans,
specifications, and estimates before moving ahead to the final submittal. Revising the plans
cannot happen until after the SUE is complete. LAN will also need additional time to coordinate
with the Utility Department to determine the most appropriate method for replacing the 24-inch
water transmission main.
Below reflects the hours involved per sheet to redesign this project:
Team Leader Senior Construction
Sheet S heel/Task Description QAIDC Manager Technician Fee
Estimates of Quantities 2 2 $982
Demolition&Removal PLans 1 2 $601
Water Utility Plans 1 1 48 $8,601
Water Utility Profiles 1 48 $6,641
Connection Details 2 28 $5,018
Miscellaneous Details 2 24 $4,518
Front End Docs,Bid Tab 2 $1.546
Specifications 2 $1938
Tobl Hour' 4 5 152
$29,905.00
In summary, the estimated total fee for this Amendment will be $29.905.00 for a total restated
fee of$593,430.00.