HomeMy WebLinkAboutC2017-595 - 12/22/2017 - NA I, •
CITY OF CORPUS CHRISTI
CONTRACT FOR PROFESSIONAL SERVICES
AMENDMENT NO. 5
The City of Corpus Christi,Texas,a Texas home-ru!e municipal corporation("City")and LNV,Inc.("Consultant");
agree to the following amendments to the Contract for Professional Services for O.N.Stevens Water Treatment
Plant High Service Building No.3(Prosect No. E110661:
Original Contract February 13, 2013 Administrative Approval $47,500.00
Amendment No. 1 _ October 15,2013 Motion No. 2013-159 $2.358.103.00
Amendment No.2 April 1, 2015 Administrative Approval $28,600.00
Amendment No.3 February 15,2016 Administrative Approval $2,581.16
Amendment No.4 May 5, 2017 Administrative Approval $20,300.00
Exhibit A, Scope of Services shall be amended as set forth in the attached Amendment No 5, Exhibit A.
Exhibit A, Fees shall be amended based on the modified scope of services in the attached Amendment No 5,
Exhibit A for a fee not to exceed$39,700.00, for a total restated fee not to exceed$2,496,784.16
All other terms and conditions of the February 13, 2013 contract between the City and Consultant, and of any
amendments to that contract, which are not specifically addressed herein shall remain in full force and effect
CITY OF CORPUS CHRISTI LNV,INC.
31,444A4Li e yociiJ FL.1121.-7 ...e„,,,,"
,,,, / i ,/, /,--7
Margie C. Rose Date Dan Ste ! , P E Date
City Manager President
801 Navigation,Suite 300
� Corpus Christi, TX 78408
`- IZY/r (381)883-1984 Office
Mark Van Vleck a e (361)883-1986 Fax
Assis -• Cityanage loganb@Invinc.com
Al
Val . Gray, P ' ate
ExeMEve Director • ''ub Wo s
11114414
Jeff . Edmonds P.E. Da
Director of Engineering Services
APPROVED AS TO LEGAL FORM
19/0/ * 2017.12.12
10:40:01 -06'00'
Assistant City Attorney Date
2017-595 R r 1¶D33 CNSW TP rttt,i.SRVC B_DG NO TAu£NO►E,rt MD SCOP,TRACt DOC u_
12/22/17
LNV Inc.
INDEXED
~
ATTEST
kee-tie_ fit-S-z i( X 0
i Secretary Date
Project Name ONSWTP High Srvc Bldg No.3
Accounting Unit 4088-062
Account 550950
Activity E11066-01-4088-EXP
Account Category 50950
Fund Name Water 2012 RVBD
Amount$39,700
K.tENGINEERING OATAEXCHANGEUENNIFERWATERAE11066 ONSWTP HIGH SRVC BLDG NO 3UAIENOMENT NO 5'.CONTRACT.COC RE, Ilii
1 +
LNV
Solutions Today with a
engin eers architects contractors Vision for Tomorrow
November 15, 2017
Mr. Jeff Edmonds, P.E.
Director of Capital Programs
City of Corpus Christi
P.O. Box 9277
Corpus Christi. Texas 78469-9277
RE: AMENDMENT NO. 5 TO PROFESSIONAL SERVICES CONTRACT
O.N. Stevens Water Treatment Plant-High Service Pump Building No. 3
City Project E11066
Mr. Edmonds:
In response to the City s request. we are proposing Amendment No. 5 in the amount of $39,700 to
provide additional services for the O.N. Stevens Water Treatment Plant- High Service Pump
Building No. 3 project(E11066)for a total re-stated project fee of$2,496,784.16
PROJECT BACKGROUND
Original Contract
On February 18, 2013, LNV received formal Notice to Proceed (NTP) for engineering services
associated with the preliminary design of the new High Service Pump Building No. 3 for a total fee of
$47,500. This contract provided the scope of work for the full design and construction of the new
pump building by evaluating and inspecting the proposed site, performing system-wide hydraulic
modeling, and developing design criteria, including demand projections, master plan
recommendations, and recommendations from the Elevated Storage Tanks - Citywide and
Alternative Capacity Requirement (ACR) projects.
Amendment No. 1
On October 17, 2013, LNV received formal Notice to Proceed (NTP) for Amendment No. 1, which
was approved by City Council on October 15, 2013 by Motion No. M2013-159, to provide all Basic
and Additional Services associated with the design and construction of the new High Service Pump
Building No. 3 and Alternative Power Expansion for a fee not-to-exceed $2,358,103 for a total
restated fee not-to-exceed $2,405,603. The new pump building is anticipated to have the capability
to deliver treated water to the distribution system from the existing clearwells (Clearwell No. 1 and
Page 1 of 6
Amend. No. 5
801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 Exhibit A
OFFICE 361 883 1984 I FAX 36I 883 1986 WWW LNVINC COM
•
No. 2) and future clearwells (Clearwell No. 3 and No. 4). The completion of this project would allow
the City to decommission High Service Pump Building No. 1.
Amendment No. 2
On April 9, 2015, LNV received formal Notice to Proceed (NTP) for Amendment No. 2 to provide
Additional Service No. 23- Geotechnical- Subsurface Investigation for the new High Service Pump
Building No. 3 for a fee not-to-exceed $28,600 for a total restated fee not-to-exceed $Z434,203.
This additional service provided a geotechnical investigation of the proposed site for the new pump
building and a geotechnical engineering report, which included recommendations for the types of
foundations and pavement sections that should be considered in the design of the High Service
Pump Building No. 3.
Amendment No. 3
On February 16, 2016, LNV received formal Notice to Proceed (NTP) for Amendment No. 3 to
provide additional Basic Services (Design and Construction Administration) and Start-up, Warranty,
SCADA and Equipment O&M Manual, Windstorm Certification, and Geotechincal - Subsurface
Investigation Additional Services associated with the new High Service Pump Building No. 3 for a
fee not-to-exceed $2,581.16 for a total restated fee not-to-exceed $2,436,784.16. This amendment
reallocated unused funds from the Peer Review Coordination and Response Additional Service in
------the amount of $138,053.70, along with the additional fee of $2,581.16 to complete the scope of
services for Amendment No. 3. The scope of services for Amendment No. 3 included the following
tasks:
• High Service No. 2 Pump Discharge Control Valve Replacement
• High Service No. 2 Motor Protection Relay(MPR) Replacement
• Clearwell No. 1 Repairs
• Existing Alternative Power Building Retrofit and Windstorm Certification
Amendment No.4
On May 15, 2017, LNV received formal Notice to Proceed (NTP) for Amendment No. 4 to provide
additional Basic Services (Design and Construction Administration) and Topographic Survey
Additional Services for a fee not-to-exceed $20,300.00 for a total restated fee not-to-exceed
----
$2,457,084.16. The scope of services for Amendment No. 4 included assessment and proposed
solution to address erosion issues around existing Clearwell No, 2 and potential weak unstable soils
along the drainage ditch south of High Service Pump Building No. 3,which were encountered during
construction. The proposed solution was incorporated into plans and specifications issued to the
Contractor to be included into their work scope for the High Service Pump Building No. 3 project.
Page z of 6 Amend. No.5
801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 3408 Exhibit A
Of VICE 361 883 1984 I PAY 361883 1986 I V/MN lMYNC COM
•
PURPOSE OF AMENDMENT NO. 6
The City staff has requested professional services to upgrade the existing and designed control
system network architecture to improve reliability and reduce complexity of the existing High Service
No. 2 (HS#2) and new High Service No. 3 (HS#3) systems. The control system upgrades for
Amendment No. 5 will include the following:
• HS#2 PLC being upgraded to ControlLogix
• Installation of a ControlLogix remote I/O rack inside PCR#2
• Physical separation of all HS#2 pump controls from HS#3 pump controls
SCOPE OF WORK
BASIC SERVICES
2. Design Phase
An additional budget allowance of$26,870 has been requested under Amendment No. 5 to
provide additional design phase services for the following upgrades to the existing control
network architecture:
• Upgrade of existing HS#2 PLC to ControlLogix family, in dual-redundant processor
configuration. The PLC and configuration will be identical to that of the new HS#3
PLC. This upgrade will result in the same level of reliability in HS#2 PLC as the future
I-1S#3 PLC. Additionally, this will allow interchangeability of PLC components
between the two pump stations.
• Physical separation of all HS#2 pumps controls from HS#3 pumps controls. This will
entail adding control and status cabling from one of the new pump VFDs in HS#3,
dedicated to one of the HS#2 pumps and located in HS#3 electrical room, to HS#2
PLC. The separation will eliminate potential simultaneous, common-mode failures of
both pump stations.
• Add a ControlLogix remote I/O rack inside PCR #2 where motor starters are
physically located. Rewire motor starters to the rack, eliminating existing long and
exposed cable runs to the new HS#3 electrical room. The remote I/O rack effectively
becomes an extension of the new HS#3 PLC via redundant fiber-optic connections.
-- - -- This option is preferred because it reduces overall cabling and takes most advantage
of the re-used motor starters in PCR #2. This improvement removes process-critical
PLC from a building destined for demolition in the near future and introduces
additional level of redundancy for the control of four new constant-speed pumps.
All upgrades will be incorporated into plans and specifications sealed by a Texas Registered
Professional Engineer(P.E.).
Page 3 o16
NI NAVIGATION I SWE 300 I CORPUS OIR16TI,TEMAS 78408 Amend. No. S
Exhibit A
[OFFICE 661®3.1984 I FAX 361 sea1986 i WWW MN/IN<EOM
•
ADDITIONAL SERVICES
6. Start-Up Services
An additional budget allowance of $5,380 has been requested under Amendment No. 5 to
provide additional start-up services to transfer finished work of the upgrades to the existing
control network architecture from a construction status to an operating, functional system.
The start-up services will include training support to plant operating personnel on the system
operational procedures for the upgrades to the existing control network architecture as a part
of Amendment No. 5.
6. Warranty Phase
An additional budget allowance of $3,950 has been requested under Amendment No. 5 to
provide additional warranty phase services for a 12-month period for the upgrades to the
existing control network architecture after completion of the construction phase. This scope
assumes that such services may be required for up to 24 hours oar 12-month warranty
period in addition to the total time provided for this phase under Amendment No. 1 and
Amendment No. 3.
7. SCADA 8 Equipment 08M Documentation
An additional budget allowance of $3,500 has been requested under Amendment No. 5 to
provide additional SCADA documentation and equipment 08M documentation for the
upgrades to the existing control network architecture. This service will include providing
standardized SCADA documentation required for the upgrades to the existing control
network architecture. SCADA document will include PFDs, P81Ds, loop sheets, logics,
SCADA architecture, DCS I/O lists, instrument lists, tie-in lists, piping lists, equipment lists,
and instrument specification sheets.
SCHEDULE
All work under Amendment No. 5 of this contract shall be completed by the Engineer in accordance
with the schedule provided below.
Activity Completion Date
Basic Services
2. Design Phase 14 weeks after NTP
Additional Services
5. Start-Up 8 Training Services TBD; Based on Contractor's Schedule
6.Warranty Phase 12 months after Construction Completion
7. SCADA 8 Equipment O&M Documentation TBD; Based on Contractor's Schedule
Page 4 of
801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408 Amend.No. 5
OFFICE 36188.1984 I FM 361.883 1988 AW LIMNC COM Exhibit
FEES
A. Fees for Basic Services. The City will pay fixed fee for providing for all "Basic Services'
except for the Construction Administration Phase authorized as shown in "ATTACHMENT 1".
The services for the Construction Administration Phase will be provided on a Time and
Material (T&M) basis as the project is moved towards completion. The fees for Basic
Services will not exceed those identified and will be full and total compensation for all
services outlined in this amendment.
B. Fees for Authorized Additional Services. The City will pay the ENGINEER the not-to-
exceed fee shown in "ATTACHMENT 1" for services specified in this amendment. The fee
will be full and total compensation for services and for all expenses incurred in performing
these services
C. Summary of fees.
Refer to ATTACHMENT 1.
If you have any questions or if you would like to discuss in more detail, please feel free to call me at
361-883-1984.
Sincerely,
Logan W. Burton, P.E.
Principal/Vice President
LNV, Inc.
TBPE Firm No. F-366
Page 5 of 8
801 NAVIGATION SUITE 300 I CORPUS CHRISTI,TEXAS 78408 Amend No. 5
OFFICE 361 883 1984 I FAX 361 883 1986 I WWW INVINCCOM Exhibit A
'..
ORIGINAL
CONTRACT
AMO. NO:1
AMD. NO.2
AMD. NO.3
AMO. NO.4
AMD. NO.5
TOTAL
RASICSERVKES
1. Preliminary Phase
$ 47.50000
5 381.371.00
$
5 -
5
$ -
5 428 871.00
2. Design Phase
5 -
5961762.00
$ 88,304.116
$ 12,41000
5 26,870.00
$ 1.091,361.86
3. Bid Phase
5 -
$ 39219.00
$
$
5 -
5 -
5 39219.00
4. Convection Administration Phase
5 -
5 277,453.00
$ 19,000.10
5 4.880.00
5 301.333.00
SUBTOTAL BASIC SERVICES (AUTHORIZED)
$ 47,500.00
5 1,657,810.00
$ -
$ 107,30416
$ 17.300.00
$ 26,870.00
$ 1856284.86
•M�Tn WARECC2
�2QOL&
AjenVIC£5(ALL
1. Permit&hicsw Coordination
5 -
5 24,02610
5
5
5 -
$
5 24,026.00
2. Topographic Survey
5 -
5 58.346.00
5
5
53.000.00
5
$ 61346.00
3. Environmental Issues
5 -
5 31.088.00
5 -
5 -
$
5
$
5 31088110
4. Construction Observation Services
5 -
TBD
5 -
$ -
S
$
5 -
5.Start-Up
5 -
$ 22,922.00
$
5 3,200.00
5 -
5 5,38000
5 86502.00
a
6. Warrantyty PhPhase
5 -
553,906 00
$ -
5 4,950.00
5 -
5 3,950.00
5 62.806.00
7. NADA &Equipment O&M Documentation
$ -
$ $ 51,12500
5 -
5 2,000.00$
$ 3.500 00
5 59625.00
8. Public InvolvementnN/AI
5 -
N/A
5 -
5
$
5 -
5 -
9.Electronic Operations O&M Manual
5 -
TRO
5 -
5
5-
10.Conformed Contract Documents
5-
TBD
$
5 -
-
5
5
11. Existing Facilities Condition Assessment
$ -
TBD
5
$
12. Windstorm Certification 'AUTHORIZED)
$ 5 -
5 19,800.00
$
$
5 21,680.00
$ -
5
5 41,480.00
13. Peer Review netion& Response (AUTHORIZED)
5 -
5 153,39100
5
5 (138,053 201
5
5 -
5 15,339.30
14.High Sm. Pumping Sys. Energy Audit &eingStudyn Evaluation
5 -
TBD
5 -
$ -
$
-
15.Olunfel laboratory Scale Hydraulic Modeling Study
-
TBD
5 -
5 -
-
$5
5 -
5 -
$
16.OlsinrectionCTEwluation
$
5 -
TBD
$ -
5 -
$
$ -
17 Plant Process and Hydraulic Evaluation
$ -
TBD
5
5
$
$5
18. Electrical Studies (AUTHORIZED)
$
5 51,150.00
-
5
5 -
$
$ -
5 51 150.00
19. Control logic& Application Development Support (AUTHORIZED,
$
$ 28,416.00
$
$ -
$
5 -
5 -
5 28.416.00
20 Control System Integration Coordination (AUTHORIZED)
-
5 2841600
$ -
5 -
$ -
5
5 28416.00
21. Probed Manual (AUTHORIZED)
$ -
$ 23.650 00
$
5 -
5
5 21650.00
22. Program Management& Projects (AUTHORIZED)
$ -
$ 99,000.00
5
5
$ -
5 -
$
5 99,00000
atianCoordination
23.0eolechnscal- Subsurface Investigation (AUTHORIZED)SE
$
5 -
5
5 2960000
5 1,500.00
$ -
5
5 30.10080
SUBTOTAL ADDITIONAL SERVICES (AUTHORIZED)
5
$ 709293.00
$ 28.600.00
5 1104,223.70t
S 3,000.00
$ (3030.00
5 639.999.30
TOTAL AUTHORIZED FEE
$ 47,500.00
$ 2,355.103.00
5 28,600.00
$ 2,581.16
$ 20,300.00
$ 39,200.00
5 2.496.284.16
Pap 6 dB
Exhibit A
AMENDMENT NO. 5
ATTACHMENT 1