HomeMy WebLinkAboutC2017-600 - 12/28/2017 - NA TASK ORDER NO. 3
This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus
Christi,Texas(City)and LNV, Inc. (Consultant)dated September 13, 2016(Agreement). Consultant shall perform
services on the project described below as provided in this Task Order and in the Agreement. This Task Order
shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall
supplement the Agreement as it pertains to the project described below.
PROJECT NAME: Water System Process Control & E13031
1. PROJECT DESCRIPTION — This project provides services for O.N. Stevens Water Treatment Plant
Analysis and Optimization, Water Distribution System Analysis and Optimization, Information System
Assessment, and SCADA Assessment.
2. SCOPE OF SERVICES —ONSWTP Process Control Mapping
3. COMPENSATION —The total amount not to exceed for Task Order No. 3 only is $12,172.00.
This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement
remain in full force and effe .
CITY OF CORPI LNV, INC.
Ael r* 8 / 7 r, A rt V
•
Jeff . Edmonds, P.E. rate Da �': er, P.E. Date
Director of Engineering Services President
801 Navigation, Suite 300
Corpus Christi, TX 78408
(361) 883-1984 Office
loganb@Invinc.com
Fund Name Accounting Unit Account No. Activity No. Amount
Water 2013 RVBD 4093-063 550950 E13031-01-4093-EXP $12,172
2017-600
12/28/17
LNV Inc.
INDEXED
City Project No. E13031
Professional Services Contract
City of Corpus Christi
Water System Process Control Reliability
Task Authorization No. 3 — ONSWTP Process Control Mapping
December 19, 2017
PpUi Ch
O 9
LNV =�
Jh
SCOPE OF WORK
Project No. E13031
Water System Process Control Rehabilitation
Task Authorization No. 3 —ONSWTP Process Control Mapping
PURPOSE
The City of Corpus Christi operations one(1)water treatment plant,O.N. Stevens Water Treatment Plant.
which is rated for 161.5 million gallons per day (MGD). The plant has a modem computer based
Distributive Control Systems (DCS) with multiple controllers, operation stations. process instrument
measurements and analytical instrumentation. The plant is one of the state's largest and requires both
automation and human decision making to maintain efficient operations.
The purpose of this Task Authorization is to assist the City Engineering Services map current operational
processes and data management systems that feed information into the control systems of the ONSWTP
operation. The project will identify opportunities for improved process control of data and decision
processes for the plant.
SCOPE OF WORK
ADDITIONAL SERVICES:
Phase 0100—O.N. Stevens Water Treatment Plant Analysis and Optimization
The Engineer will perform the following:
Task 0101-Project Management
I. Attend meetings with City Staff and Sub Consultants to ensure all project requirements and city
standards are met and proper coordination takes place.
2. Prepare and distribute meeting notes to City Staff and Sub Consultants.
3. Prepare and submit project invoices to the City and coordinate with City's Project Manager.
Task 0102-Engineering and Programming Phase Services
I. Project Development
• Scope development
• Project scheduling and administration
2. Support Requirements
• Site meetings
• Miscellaneous Communications
3. Pre-Work for Mapping Session(s)
• Create or modify Mapping Methodology
• Create information package for participants
4. Mapping Session(s)&Support
1
• ,
PLUS CH
LNVJN
• ..il •
• Conduct mapping session(8 hours/session)
• Supplemental research for session support
• Document Implementation Plan
• Document recommendations and report
5. Client Rollout Support
• Support for Work Product rollout
DELIVERABLES
The Engineer will prepare a DRAFT Document Implementation Plan and a Document Recommendation
Report for the City's review. Upon receipt of comments.the Engineer will incorporate comments into the
FINAL documents and provide one(I)hard copy and one(1)electronic copy to the designated City Task
Authorization Manager specified under this authorization.
SCHEDULE
The Engineer's services shall be performed in a timely manner consistent with sound professional
practices. The Engineer will complete the work according to the following schedule:
Activity Completion Date
Contract Execution-Notice to Proceed(NTP) TBD
Task 0101-Project Management 60 days after NTP
Task 0102-Engineering& Programming Phase Services 60 days after NTP
The time limits set forth in the schedule shall include allowances for reasonable and expected review time
by the City and approval by authorities having jurisdiction over this project, and shall not be allowed as
cause for delay or adjustments to the schedule. Delays caused by review times by the City exceeding those
anticipated by the Engineer's schedule are cause for adjustments in the schedule. Any adjustments made
to the agreed upon schedule shall be made in writing and accepted by both parties.
The Engineer shall begin work immediately upon receipt of the executed Task Authorization and/or Notice
to Proceed(written or emailed).
FEE
The total anticipated amount for Task Authorization No. 3 is 512,172.00 as shown in ATTACHMENT A.
The services for Task 0101-Project Management Services will be provided on a Time and Material(T&M)
basis as the project is moved towards completion.
The services for Task 0102-Engineering&Programming Phase Services will be provided on a Lump Sum
basis.
If the level of effort exceeds the estimate shown in Attachment A. a separate task authorization will be
requested.
2
t f • '
pPp Us C��9
1 f1
TASK AUTHORIZATION MANAGER
The Task Authorization Manager will be the primary contact person during the performance of this work.
All correspondence or inquiries should be addressed to the Task Authorization Manager. This work task
will be coordinated by:
Dan Grimsbo. P.E. A.I.C.P.
Executive Director of Utilities Department
City of Corpus Christi
Office: 361-826-1874
Fax: 361-826-1889
Email: DanG()cctexas.com
APPROVAL
The undersigned has reviewed and approved this Task Authorization and authorizes LNV. Inc.to perform
the work as presented:
Reco ended by:
._ . J
. ri
DA',/ i'+' 3 C C (Printed Name)
A/ D5 G / (Date)
3
Task
LNV Inc.
Description
Attachment A
TA3- ONSWTP Process Control Mapping
Man-hour and Fee Analysis
Principal/VP
Project Mgr.
Project Engineer
EIT II
Expenses
TOTALS
$ 195.00
$ 190.00
5 165.00
$ 105.00
Hrs.
Sub -total
Hrs.
Subtotal
Hrs.
Subtotal
Hrs.
Subtotal
Sub -total
Total Hrs.
Total Fee
0100
O.N. Stevens Water Treatment Plant Analysis & Optimization
0101
Project Mangament Services
$
4
760.00
4
5 420.00
$ 1,180.00
Sub -totals
4
760.00
4
$ 420.00
8
1,180.00
Task
Bath Engineering
Description
Sr. Engineer
SCADA Controls Specialist
Sr. Designer
R. Designer
Expenses
Lump Sum Fee
Admin Fee (10% of
subconsultant feel
Total Fee
$ 165.00
5 150.00
$ 120.00
$ 95.00
Hrs.
Subtotal
Hrs.
Subtotal
Hrs.
Subtotal
Hrs.
Subtotal
Sub -total
Subtotal
Sub -total
0100
O.N. Stevens Water Treatment Plant Analysis & Optimization
0102
Engineering & Programming Phase
Services
$
5
5
$
5 9,992.00
5 999.20
5 10,992.00
Sub -totals
$-
$ -
$ -
$ -
$ -
$ 9,992.00
$ 999.20
$ 10,992.00
TOTAL FEE -
$ 12,172.00