Loading...
HomeMy WebLinkAboutC2019-039 - 2/8/2019 - NA CITY OF CORPUS CHRISTI AMENDMENT NO. 4 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City")and HDR Engineering, Inc. ("Architect/Engineer — AlE"), agree to the following amendments to the Contract for Professional Services for Chaparral Street Phase 2 Downtown Development Master Plan (Project No. E15107): _ Original Contract December 29, 2015 Administrative Approval $49,895 Amendment No. 1 October 25 2016 Motion No. M2016-143 $657,649 Amendment No. 2 July 17, 2017 Administrative Approval $3,850 Amendment No. 3 May 18, 2018 Administrative Approval $5,500 In the Original Contract, Exhibit'A", Section I. Scope of Services shall be amended as set forth in the attached Amendment No. 4, Exhibit"A". In the Original Contract, Section III., shall be amended based on the modified scope of services in the attached Amendment No. 4, Exhibit"A"for a fee not to exceed for a total restated fee not to exceed $716,894. All other terms and conditions of the October 25,2016 Amendment No. 1 to the Contract for Professional Services between the City and Consultant, an• • -ny amendments to that contract, which are not specifically addressed herein shall remai •rce an. - c - TI HDR ENGINEERING,INC. hGJ%�/44 1. J- H. dmonds, / Arthur Colwell, P. E. Date '.E. rate Director of Engineering Services Vice President/Managing Principal 555 N. Carancahua, Suite 1600 Corpus Christi,TX 78401 APPROVED AS TO LEGAL FORM (361) 696-3300 Office arthurcolwell@hdrinc.com 4� 2019.02.06 10:27:06-06'00' Assistant City Attorney Date ATTEST c(Z_ Az-r g-(g (i i' Secretary Date Accounting Unit 3551-051 Account 550950 Activity E15107-01-3551-EXP Account Category 50950 Fund Name Street GO Bond 2016 C2019-039 2/08/19 HDR Engineering Inc. SCANNED January 16, 2019 10028053 Mr. Jeff H. Edmonds, P.E. Director of Engineering Services City Of Corpus Christi 1201 Leopard Street Corpus Christi,TX 78401 RE: Amendment 4 Chaparral Street Phase 2 from Schatzell Street to Taylor Street(Bond 2014) E15107 Dear Mr. Edmonds, HDR is requesting a zero dollar amendment to cover the budget overrun of the construction administration phase for Chaparral St. Phase 2 — Schatzell St. to Taylor St. (Bond 2014) Project No. E15107. HDR has kept the City of Corpus Christi Engineering Services informed through e-mails and progress reports of the construction administration phase budget status as we approached and exceeded the budget. We have withheld invoicing the construction administration overrun until a zero dollar amendment is executed between the City of Corpus Christi Engineering Services and HDR. The anticipated budget was exceeded due to requests by the Engineering Services and Construction Department to modify existing signing and striping sheets, add new signing and striping sheets, and the associated approval process. Please note that HDR has yet to complete record drawings for the project. Please refer to the attached Exhibit C. An amount of$7,828.46 has been reallocated in Amendment 4 resulting in a zero dollar change while providing HDR the ability to cover the budget overrun and complete the record drawings. Please feel free to contact us at any time to discuss as necessary. Sincerely, HDR ENGINEERING, INC. //),/12A14 Samuel Saldivar,Jr., P.E. Arthur B. Colwell, P.E. Civil Program Leader Vice President/Managing Principal Cc: Marisa Alaniz, P.E., City of Corpus Christi Enclosure: Exhibit"C" Fee Summary hdrinc.com 555 N.Carancahua,Suite 1600,Corpus Christi,TX 78401-0849 (361)696-3300 AMEND. NO. 4 EXHIBIT "A" Page 1 of 2 Exhibit C Chaparral Street from Schatzell to Taylor Project No.E15107 Basic Services: Contract Amd No.1 Amd No.2 Amd No.3 Amd No.4 Total Contract 1.Preliminary Phase $49,895.00 $10,497.00 $60,392.00 2.Design Phase $346,822.00 $346,822.00 2.c.6 Electrical Design $53,152.00 $3,850.00 $57,002.00 3.Bid Phase $11,112.00 $11,112.00 4.Construction Administration Phase(Time&Materials) $50,021.00 $7,828.46 $57,849.46 4.a.Electrical(Time&Materials) $11,102.00 -$2,792.46 $8,309.54 Subtotal Basic Services Fees $49,895.00 $482,706.00 $3,850.00 $0.00 $5,036.00 $541,487.00 Additional Services: 1.Permit Preparation(Authorized at NTP) $1,031.00 $1,031.00 1.a.RAS(Authorized at NTP) $5,250.00 $5,250.00 N/A TBD 3.Topographic Survey and Parcel Descriptions f.Main Section(Schatzell to Taylor)(Authorized at NTP) $51,491.00 $51,491.00 g.Add'I Survey(Surfacing&Striping)(Authorized at NTP) $43,758.00 , $43,758.00 4.Environmental Issues(Authorized at NTP) $5,036.00 -$5,036.00 $0.00 5.Public Involvement(Authorized at NTP) $4,233.00 $4,233.00 5.Public Involvement(Support) $20,020.00 $5,500.00 $25,520.00 6.Subsurface Utility Investigation(Authorized at NTP) $33,286.00 $33,286.00 7.Construction Observation Services TBD TBD 8.Warranty Phase $3,688.00 $3,688.00 9.Landscaping Design(Authorized at NTP) $7,150.00 $7,150.00 10.Televised Inspection of Lines TBD TBD Subtotal Additional Services $0.00 $174,943.00 $0.00 $5,500.00 -$5,036.00 $175,407.00 Summary of Fees Basic Services Fees $49,895.00 $482,706.00 $3,850.00 $0.00 $5,036.00 $541,487.00 Additional Services Fees $0.00 $174,943.00 $0.00 $5,500.00 -$5,036.00 $175,407.00 Total of Fees $49,895.00 $657,649.00 $3,850.00 $5,500.00 $0.00 $716,894.00 m3 - xm 0 = z co map N —iz —Pi • is, N .. A