AMENDMENT NO. 4
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City")and HDR Engineering, Inc.
("Architect/Engineer — AlE"), agree to the following amendments to the Contract for Professional Services for
Chaparral Street Phase 2 Downtown Development Master Plan (Project No. E15107):
_ Original Contract December 29, 2015 Administrative Approval $49,895
Amendment No. 1 October 25 2016 Motion No. M2016-143 $657,649
Amendment No. 2 July 17, 2017 Administrative Approval $3,850
Amendment No. 3 May 18, 2018 Administrative Approval $5,500
In the Original Contract, Exhibit'A", Section I. Scope of Services shall be amended as set forth in the attached
Amendment No. 4, Exhibit"A".
In the Original Contract, Section III., shall be amended based on the modified scope of services in the attached
Amendment No. 4, Exhibit"A"for a fee not to exceed for a total restated fee not to exceed $716,894.
All other terms and conditions of the October 25,2016 Amendment No. 1 to the Contract for Professional Services
between the City and Consultant, an• • -ny amendments to that contract, which are not specifically addressed
herein shall remai •rce an. -
c - TI HDR ENGINEERING,INC.
hGJ%�/44 1.
J- H. dmonds,
/ Arthur Colwell, P. E. Date
'.E. rate
Director of Engineering Services Vice President/Managing Principal
555 N. Carancahua, Suite 1600
Corpus Christi,TX 78401
APPROVED AS TO LEGAL FORM (361) 696-3300 Office
arthurcolwell@hdrinc.com
4� 2019.02.06 10:27:06-06'00'
Assistant City Attorney Date
ATTEST
c(Z_ Az-r g-(g (i
i' Secretary Date
Accounting Unit 3551-051
Account 550950
Activity E15107-01-3551-EXP
Account Category 50950
Fund Name Street GO Bond 2016
C2019-039
2/08/19
HDR Engineering Inc.
SCANNED
January 16, 2019 10028053
Mr. Jeff H. Edmonds, P.E.
Director of Engineering Services
City Of Corpus Christi
1201 Leopard Street
Corpus Christi,TX 78401
RE: Amendment 4
Chaparral Street Phase 2 from Schatzell Street to Taylor Street(Bond 2014) E15107
Dear Mr. Edmonds,
HDR is requesting a zero dollar amendment to cover the budget overrun of the construction
administration phase for Chaparral St. Phase 2 — Schatzell St. to Taylor St. (Bond 2014) Project No.
E15107. HDR has kept the City of Corpus Christi Engineering Services informed through e-mails and
progress reports of the construction administration phase budget status as we approached and
exceeded the budget. We have withheld invoicing the construction administration overrun until a zero
dollar amendment is executed between the City of Corpus Christi Engineering Services and HDR.
The anticipated budget was exceeded due to requests by the Engineering Services and Construction
Department to modify existing signing and striping sheets, add new signing and striping sheets, and the
associated approval process. Please note that HDR has yet to complete record drawings for the project.
Please refer to the attached Exhibit C. An amount of$7,828.46 has been reallocated in Amendment 4
resulting in a zero dollar change while providing HDR the ability to cover the budget overrun and
complete the record drawings. Please feel free to contact us at any time to discuss as necessary.
Sincerely,
HDR ENGINEERING, INC.
//),/12A14
Samuel Saldivar,Jr., P.E. Arthur B. Colwell, P.E.
Civil Program Leader Vice President/Managing Principal
Cc: Marisa Alaniz, P.E., City of Corpus Christi
Enclosure: Exhibit"C" Fee Summary
hdrinc.com
555 N.Carancahua,Suite 1600,Corpus Christi,TX 78401-0849
(361)696-3300
AMEND. NO. 4
EXHIBIT "A"
Page 1 of 2
Exhibit C
Chaparral Street from Schatzell to Taylor
Project No.E15107
Basic Services: Contract Amd No.1 Amd No.2 Amd No.3 Amd No.4 Total Contract
1.Preliminary Phase $49,895.00 $10,497.00 $60,392.00
2.Design Phase $346,822.00 $346,822.00
2.c.6 Electrical Design $53,152.00 $3,850.00 $57,002.00
3.Bid Phase $11,112.00 $11,112.00
4.Construction Administration Phase(Time&Materials) $50,021.00 $7,828.46 $57,849.46
4.a.Electrical(Time&Materials) $11,102.00 -$2,792.46 $8,309.54
Subtotal Basic Services Fees $49,895.00 $482,706.00 $3,850.00 $0.00 $5,036.00 $541,487.00
Additional Services:
1.Permit Preparation(Authorized at NTP) $1,031.00 $1,031.00
1.a.RAS(Authorized at NTP) $5,250.00 $5,250.00
N/A TBD
3.Topographic Survey and Parcel Descriptions
f.Main Section(Schatzell to Taylor)(Authorized at NTP) $51,491.00 $51,491.00
g.Add'I Survey(Surfacing&Striping)(Authorized at
NTP) $43,758.00 , $43,758.00
4.Environmental Issues(Authorized at NTP) $5,036.00 -$5,036.00 $0.00
5.Public Involvement(Authorized at NTP) $4,233.00 $4,233.00
5.Public Involvement(Support) $20,020.00 $5,500.00 $25,520.00
6.Subsurface Utility Investigation(Authorized at NTP) $33,286.00 $33,286.00
7.Construction Observation Services TBD TBD
8.Warranty Phase $3,688.00 $3,688.00
9.Landscaping Design(Authorized at NTP) $7,150.00 $7,150.00
10.Televised Inspection of Lines TBD TBD
Subtotal Additional Services $0.00 $174,943.00 $0.00 $5,500.00 -$5,036.00 $175,407.00
Summary of Fees
Basic Services Fees $49,895.00 $482,706.00 $3,850.00 $0.00 $5,036.00 $541,487.00
Additional Services Fees $0.00 $174,943.00 $0.00 $5,500.00 -$5,036.00 $175,407.00
Total of Fees $49,895.00 $657,649.00 $3,850.00 $5,500.00 $0.00 $716,894.00