Loading...
HomeMy WebLinkAboutC2019-043 - 2/11/2019 - NA CITY OF CORPUS CHRISTI CONTRACT FOR ENGINEERING DESIGN SERVICES AMENDMENT NO. 4 The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City")and Lockwood,Andrews and Newnam, Inc. ("Consultant"), agree to the following amendments to the Contract for Engineering Design Services for Avers Street Pedestrian Improvements and Turn Lane Addition (SPID to Gollihar) BOND 2014 Prop 2 (Project No. E15106): Original Contract May 17, 2016 Ordinance No. 030851 $513,625 Amendment No. 1 June 2, 2017 Administrative Approval $49,900 Amendment No. 2 December 21, 2017 Administrative Approval $29,905 Amendment No. 3 October 30, 2018 Administrative Approval $36,800 In the Original Contract, Exhibit A, Section I. Scope of Services shall be amended as set forth in the attached Amendment No. 4, Exhibit A. In the Original Contract, Section III. Fees shall be amended based on the modified scope of services in the attached Amendment No. 4, Exhibit A for a fee not to exceed $31,745, for a total restated fee not to exceed $661,975. All other terms and conditions of the May 17, 2016 Contract for Engineering Design Services between the City and Consultant, and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPU S CHRISTI LO KWOOD, ANDR, WS AND NEWNAM, INC. G/" /# VII/ /Markt/Icke Stev A. Gilbreath, P.E. Date Assistant City Mana!er Associate 500 N. Shoreline Blvd., Suite 905 'll ' �7-' . '� Sidi _ OC) Corpus Christi, TX 78401 l�`' (361) 882-2257 Office Vale H. Gray, Tate smharris@lan-inc.com Exec tive Directo • ' • irks iii aro--"moi%� S' /? Jeff H. ' dmonds, P.E. •_ e Director of Engineering Services APPROVED AS TO LEGAL FORM 9/1)/4 -'- 2019.02.06 10:32:08 -06'00' Assistant City Attorney Date Project Number E15106 Accounting Unit 3551-051 ATTEST Account 550950 1 1 Activity E15106-01-3551-EXP n L- ;, /Y n a✓ `tom /( 3/1(j Account Category 50950 C2Ut,-(j43 ! I Fund Name Street 2015 GO Bond 2014 2/11/19 Date Lockwood Andrews & Newnam AYERS STREET PEDESTRIAN IMPS TURN LANE ADDITION\AMENDMENT NO 4 LAN\E15106 AMENDMENT NO 4 LAN DOC REV.10/1/15 Lockwood, Andrews 1.9.11 &Newnam,Inc. A IFO A DALY COMPANY January 11, 2019 Mr. Jeff H. Edmonds, P.E. Director of Engineering Services City of Corpus Christi 1201 Leopard Street Corpus Christi, Texas 78401 Reference: Amendment 4 to Bond 2014 Proposition 2 - Ayers Street— SPID to Gollihar (Project No. E15106) Dear Mr. Edmonds: LAN respectfully requests that the City consider an amendment to our professional services agreement for the Ayers Street Pedestrian and Turn-Lane Improvements Project (E15106). The purpose of this amendment is to increase our compensation for additional bid phase services to evaluate and include an additive alternate related to the proposed paving improvements. Proposed Additive Alternate In November 2018, LAN met with City staff to discuss and respond to contractor questions prior to the bid date. These recent questions and previous contractor questions created concern that some contractors would not bid the project, or the bids would come in over budget due to the multifaceted pavement design. City staff asked for LAN's opinion on whether a redesign of the project for full depth reconstruction would result in more competitive bids and within the available budget. On December 13, 2018, LAN sent a letter summarizing that the as-bid design met the intent and criteria of the Bond project and is constructible but benefits from a full depth reconstruction (FDR) outweigh the negatives and may avoid potential cost overruns for unforeseen conditions. LAN recommended that the City reconsider FDR of the entire roadway within the limits of this project. On December 170, 2018, LAN met with City Engineering staff to discuss the above recommendations and agreed that before considering a redesign of the project, the project could be bid including an additive alternate that would allow the contractor to provide the unit costs for completing additional pavement reconstruction up to a full-depth reconstruction of the roadway where necessary. Scope of Amendment #4—Additional Bid Phase Services As mentioned above, LAN will include an additive alternate in the bid documents for the prospective contractors to include unit costs for completing additional pavement reconstruction up to the full depth reconstruction of the roadway. In order for us to revise our bid documents we need to do the following additional items not included in our original contract or previous amendments: 500 N.Shoreline Blvd,Suite 905 • Corpus Christi,Texas 78401 • 361.882.2257 • www.lan-inc.com AMEND. NO. 4 EXHIBIT "A" Page 1 of 4 Bond 2014 Proposition 2-Ayers Street(El 5106) Amendment 4 January 11,2019 Page 2 • Provide an exhibit and coordinate with a third-party geotechnical engineer to complete additional borings of the roadway. • Review the recommendations from the geotechnical engineer and analyze the borings and existing pavement strata. • In AutoCAD Civil 3D, generate additional cross sections of the existing and proposed roadway surfaces, analyze those cross sections, perform paving quantity take-offs, and revise the proposed surfaces as necessary. Additional cross sections will be included on approximately ten (10) new sheets included in the Addenda. • Based on the results of the additional geotechnical work and the additional cross sections, generate new concrete pavement demo details (this may be more than one detail depending on the Geotech and limits of existing pavement) and complete additional concrete pavement quantity take-offs, as necessary. • Revise/firm-up existing as-bid drawings to reflect the paving materials/limits, discovered through the above analysis, and include those revised sheets in the proposed Addenda. Drawings that will need to be revised include: o Drawing Index o General Notes (2 sheets) o Estimated Quantities (2 sheets) o Demolition and Removal Plans (10 sheets) o Limits of New Improvements &Overlay Plans (2 sheets) o Street Plan &Profiles (8 Sheets) • Modify bid form and front end documents. The following front end documents will need to be revised to reflect the additive alternate: o Table of Contents o Invitation to Bid and Instructions to Bidders o Bid Acknowledgement Form o Bid Form o Supplementary Conditions o Summary of Work o Alternates and Allowances o Measurement and Basis of Payment o Special Procedures • Modify the Opinion of Probable Construction Costs • Attend an additional pre-bid meeting, including pre/post discussions with City staff, review/respond to additional Bidder questions, prepare Addenda, and review bids, revise bid tabs to include new pay items, and provide recommendation for award. Summary LAN understands that this project is unique and has promised to deliver a project that is both complete and constructible. For that reason, we anticipate that we will require more fee to complete this additional scope of work during the bid phase. We respectfully request that the City consider an amendment to our professional services agreement for the Ayers Street Pedestrian and Turn-Lane Improvements Project(E15106). LAN AMEND. NO. 4 EXHIBIT "A" Page 2 of 4 Bond 2014 Proposition 2 -Ayers Street(E15106) Amendment 4 January 11, 2019 Page 3 is proposing a total additional fee of$31,745.00 for Amendment #4, a total restated contract fee of$661,975.00. A manhour summary is included below: MGMT MGMT ENGR ENGR TECH Total Cost Team Leader Sr CM Engineer IV Engineer II TECH Task Description S.Harris J.Montalvo A Vigstol D.Lopez G Gatica 1 Exhbh and Coordination w Thad-Party Geotech 0 5 2 0 0 2 5724 2 Review Geotech report,analyze borngs 1 4 0 0 0 6994 3 Additional Cross Sections(Analysts, Take-offs,etc.) 2 8 12 0 40 58,068 4 New Concrete Pavement Details 1 5 6 0 0 8 $2 400 5 Revise Existng As-Bd Plans 1 1 0 0 22 52 890 6 Modify As-Bid Front End Docs 1 16 2 4 0 S4 070 7 Modify OPCC 05 1 4 0 0 5808 8 Addenda, Discussions w/Cry, Q&A, and Meetings 16 24 8 24 4 511 790 Subtotal 23.5 62 26 28 76 $31,745 TOTAL HOURS I UNITS: 23.5 62 26 28 76 TOTAL COSTS: $4 465 512 462 $3.328 52 856 58 631 531,745 , A summary of the original contract and previous amendments is included in the table below: Basic Services: Contract Amd No.1 Amd No.2 Amend No.3 Amend No 4 Total Contract (April 2016) (May 2017) (Nov 2017) (Nov 2018) Prelim Phase $128,400.00 $0 SO SO 5128,400.00 Design Phase $223,100.00 549,900 529,905 582,650 5385.555.00 Bid Phase 512,100.00 SO 50 ($6,100) 531,745 $37,745.00 Construction Admin 546,800.00 SO SO ,•_ $30,800.00 Subtotal Basic Services $410,400.00 $49,900 529,905 $60,550 $31,745 $582,500.00 Additional Services: 1. Permitting $12,000.00 $0 $0 ($12,000) $0.00 2. Topographic Survey $71,875.00 $0 $0 $71,875.00 3. Permit Preparation $5,750.00 $0 $0 ($5,750) $0.00 4. Public Involvement $7,600.00 $0 $0 $7,600.00 5. Warranty Phase $6,000.00 $0 $0 ($6,000) $0.00 Subtotal Additional Services $103,225.00 $0 $0 ($23,750) $79,475.00 Summary of Fees Basic Services Fees $410,400.00 $49,900 $29,905 $60,550 $31,745 $582,500.00 , Additional Services Fees $103,225.00 SO $0 ($23,750) 579,475.00 Total of Fees $513,625.00 $49,900 $29,905 $36,800 $31,745 $661,975.00 AMEND. NO. 4 EXHIBIT "A" Page 3 of 4 Bond 2014 Proposition 2 -Ayers Street(E15106) Amendment 4 January 11, 2019 Page 4 Should you have any questions or require additional information, please contact me directly at 361-792-7225. Sincerely, Scott M. H.rris, P.E. Associate, Regional Manager Copy: Marisa Alaniz, E.I.T. AMEND. NO. 4 EXHIBIT "A" Page 4 of 4 Ayers Street Pedestrian Improvements and Turn Lane Addition (Bond 2014) Project No. E15106 SUMMARY OF FEES Contract Amend. No. 1 Amend. No. 2 Amend. No. 3 Amend. No. 4 Total Basic Services Fees 1 Preliminary Phase $128,400.00 $0.00 $0.00 $0.00 $0.00 $128,400.00 2 Design Phase 223,100.00 49,900.00 29,905.00 82,650.00 0.00 385,555.00 3 Bid Phase 12,100.00 0.00 0.00 (6,100.00) 31,745.00 37,745.00 4 Construction Administration Phase 46,800.00 0.00 0.00 (16,000.00) 0.00 30,800.00 Subtotal Basic Services Fees 410,400.00 49,900.00 29,905.00 60,550.00 31,745.00 582,500.00 Additional Services Fees (Allowance) 1 Permit Preparation 12,000.00 0.00 0.00 (12,000.00) 0.00 0.00 2 ROW Acquisition Survey 0.00 0.00 0.00 0.00 0.00 0.00 3 Topographic Survey 71,875.00 0.00 0.00 0.00 0.00 71,875.00 • 4 Environmental Issues 5,750.00 0.00 0.00 (5,750.00) 0.00 0.00 5 Public Involvement 7,600.00 0.00 0.00 0.00 0.00 7,600.00 . 6 Subsurface Utility Investigation 0.00 0.00 0.00 0.00 0.00 0.00 7 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 0.00 8 Warranty Phase 6,000.00 0.00 0.00 (6,000.00) 0.00 0.00 9 Geotechnical Engineering Services 0.00 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees 103,225.00 0.00 0.00 (23,750.00) 0.00 79,475.00 Authorized Total Authorized Fee $513,625.00 $49,900.00 $29,905.00 $36,800.00 $31,745.00 $661,975.00 5/17/2016 5/30/2017 12/21/17 10/30/18 * 030851 Ad. Approval Ad. Approval Ad. Approval Ad. Approval * D m3 -0 x m A) 2z co mWv - 74z o 0 _ p,