Loading...
HomeMy WebLinkAboutC2019-051 - 3/1/2019 - NA TASK ORDER NO. 39 This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. (Consultant) dated August 16, 2016 (Agreement). Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. PROJECT NAME/NUMBER: Water and Wastewater Treatment On-Call Support, E16264 1. PROJECT DESCRIPTION—This project provides the Utility Department with on-call services to assist with any technical, operational, maintenance,diagnostic and design concerns for the City's O.N.Stevens Water Treatment Plant and six wastewater treatment plants. 2. SCOPE OF SERVICES— ONSWTP Site Master Plan Update, more fully described in Exhibit A. 3. COMPENSATION —The total amount not to exceed for Task Order No. 39 only is $10,935. This Task Order is approved, and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF C• - • ►S ' ,TI LNV, INC. • i . s Je' H. Edmonds, P.E. Date Dar ?).+9. Leyendecker�, 3/l� , P.E. Date Director of Engineering Services President 801 Navigation, Suite 300 Corpus Christi, TX 78408 (361) 883-1984 Office loganb@Invinc.com Fund Name Accounting Unit Account No. Activity No. Amount Water Operating Fund 4010-31010-062 530000 E16264-01-4010-EXP $10,935.00 , C2019-051 3/01/19 Task Order No. 39 LNV Inc. Page 1 of I SCANNED City Project No. E16264 Professional Services Contract City of Corpus Christi Water/Wastewater Treatment On-Call Support Task Authorization No. 39 — ONSWTP Site Master Plan Update February 19, 2019 LNif EXHIBIT A Page 1 of 4 Jb • • SCOPE OF WORK Project No. E16264 Water and Wastewater Treatment On-Call Support Task Authorization No. 39-ONSWTP Site Master Plan Update PURPOSE The O.N. Stevens Water Treatment Plant (ONSWTP) has been in operation since 1954 and has a rated capacity of 161.5 MGD.To map the existing and future facilities onto a single site plan,a Site Master Plan was prepared for the water treatment plant. This document represents the unofficial master plan for the future layout of ONSWTP and helps communicate the location and size of future capacity expansions and process modifications or upgrades. It ensures that all facilities are coordinated with one another for efficiency,and potential conflicts with regard to facility footprints are avoided.This was last updated in 2017. The purpose of this Task Authorization is to assist the City in updating the older Site Master Plan to ensure that all completed and planned additions or modifications to ONSWTP over the past 10 years are appropriately documented. Planning-level calculations will be performed to determine the required footprint of treatment train-3 sedimentation basins. SCOPE OF WORK ADDITIONAL SERVICES: ITEM 9—General Engineering The Engineer will perform the following: 1. Sedimentation Basin Sizing: Determine the required footprint/capacity of future treatment train-3 sedimentation basins with or without plate settlers. 2. Site Master Plan Update: Discuss with City staff to discuss recent and planned improvements.Review documentation that describes the modifications and upgrades to existing water treatment processes along with any construction that has taken place at ONSWTP since the Site Master Plan was last updated. Furnish updated version of the Site Master Plan with the latest layout of ONSWTP,structural modifications,and process improvements. A high-level timeline provided by the City will also be included in the Site Master Plan.The components of the Site Master Plan shall be color-coded to match the timeline provided by the City. The Site Master Plan will be updated as and when requested by the City per availability of funding. 1 EXHIBIT A Page 2 of 4 Opp US C, LNV JH DELIVERABLES The Engineer will prepare a Draft Site Master Plan Update and submit it to the City for review and comments. Upon receipt of comments, the Engineer will incorporate the necessary changes and submit one (1) hard copy and one(1) electronic copy of the Site Master Plan. SCHEDULE The Engineer's services shall be performed in a timely manner consistent with sound professional practices. The Engineer will complete the work according to the following schedule: Activity Completion Date Contract Execution-Notice to Proceed(NTP) TBD Draft Submittal 2 weeks after NTP Final Submittal 2 weeks after City's review A similar schedule will be followed for the next updates as and when requested by the City as the budget allows.The time limits set forth in the schedule shall include allowances for reasonable and expected review time by the City and approval by authorities having jurisdiction over this project and shall not be allowed as cause for delay or adjustments to the schedule. Delays caused by review times by the City exceeding those anticipated by the Engineer's schedule are cause for adjustments in the schedule. Any adjustments made to the agreed upon schedule shall be made in writing and accepted by both parties. The Engineer shall begin work immediately upon receipt of the executed Task Authorization and/or Notice to Proceed(written or emailed). FEE The services will be provided on a Time and Materials (T&M) basis as the project is moved towards completion.The anticipated amount for this task authorization is$10,935.00,as shown in ATTACHMENT A. If the level of effort exceeds this estimate, a separate task authorization will be requested. EXHIBIT A Page 3 of 4 O A V J1 LNV l,! TASK AUTHORIZATION MANAGER The Task Authorization Manager will be the primary contact person during the performance of this work. All correspondence or inquiries should be addressed to the Task Authorization Manager. This work task will be coordinated by: Daniel Grimsbo, P.E. A.I.C.P. Interim Assistant Director of Utilities Department City of Corpus Christi Office: 361-826-1874 Fax: 361-826-1889 Email: DanG@cctexas.com APPROVAL The undersigned has reviewed and approved this Task Authorization and recommends LNV, Inc.to perform the work as presented: Reco mended by: bffi ler DA--/ Cr< (n'1 S' 0 (Printed Name) .; 1 I ( (Date) 3 EXHIBIT A Page 4 of 4