Loading...
HomeMy WebLinkAboutC2019-102 - 3/12/2019 - NA TASK ORDER NO. 1 This Task Order pertains to a Master Services Agreement for Professional Subsurface Utility Exploration (SUE) Services by and between City of Corpus Christi, Texas (City) and Cobb, Fendley&Associates, Inc. (Consultant) dated October 30, 2018(Agreement). Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. PROJECT NAME: 18127A Master Services Agreement for Professional Subsurface Utility Exploration (SUE) Services Task Order No. 1 18127B Slough Road from Rodd Field Road to Dead End (Project No. 18042A) 1. PROJECT DESCRIPTION. SUE Investigation Services to assist in determining the presence and location of subsurface utilities with Slough Road from Rodd Field Road to Dead End. 2. SCOPE OF SERVICES.Task Order No.1 —professional investigation services is described in Exhibit "A". 3. COMPENSATION. The total amount not to exceed for Task Order No. 1 only is $27,623.94. 4. PROJECT DELIVERABLE(S) TIMELINE. Twenty (20) business days from Notice to Proceed. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. 7-OF --• -P • • RIS COBB, FENDLEY&ASSOCIATES, INC. ''. \J")4a4 3/12/19 Jef1{H. Edmonds, P. E. ate) Dan Warth, P. E. (Date) Director of Engineering Services Regional Manager 505 E. Huntland Drive, Suite 100 Austin, TX 78752 (512) 834-9798 Office dwarth@cobbfendley.com Accounting Unit 3548-051 Account 550950 Activity 18042-A-3548-EXP Account Category 50950 Fund Name St 2012 GO Bond 2008 C2019-102 3/12/19 Cobb Fendley & Associates Inc. . r.AniNIFf CobbFendley March 11,2019 Luis Vargas,EIT City of Corpus Christi 1201 Leopard St. Corpus Christi,TX 78401 VIA E-MAIL Re: 18127A SUE Services MSA—Task Order#1 (18127B) Slough Road SUE Corpus Christi,TX Dear Mr.Vargas, CobbFendley is pleased to provide this scope and fee estimate for the Subsurface Utility Engineering(SUE)investigation services associated with the project referenced above.The proposed Scope of Services and Basis of Compensation are outlined below. This proposal is based on email and telephone communications with Luis Vargas (City of Corpus Christi) and Marisa Alaniz (City of Corpus Christi)between January 30th,February 12th and March 5th,2019. Scope of Services The purpose of this SUE investigation is to assist in determining the presence and location of subsurface utilities. For scope limits: Quality Level B within the delineated areas labelled as "SUE Location" in the attached plan exhibit. Quality Level A locations listed in the attached SUE Request spreadsheet within the delineated areas labelled as"SUE Location"in the attached plan exhibit. SERVICES TO BE PROVIDED BY COBB FENDLEY When performing this type of work CobbFendley typically follows ASCE 38-02"The Standard Guidelines for the Collection and Depiction of Existing Subsurface Utility Data"-see below. Utility Quality Levels are defined in cumulative order(least to greatest): Quality Level D-Existing Records: Utilities are plotted from review of available existing records Quality Level C - Surface Visible Feature Survey: Quality Level "D" information from existing records is correlated with surveyed surface-visible features. Quality Level B-Designate: Two-dimensional horizontal mapping. This information is obtained through the application and interpretation of appropriate non-destructive surface geophysical methods. Utility indications may be referenced to established survey control.Additional description of services,methodology and equipment is below. Quality Level A-Locate(Test Hole):Three-dimensional mapping and other characterization data. This information is obtained through exposing utility facilities through test holes and measuring and recording (to appropriate survey control) utility/environment data It is anticipated that for this project, CobbFendley will provide Quality Level A and Quality Level B SUE information. SUE investigations are conducted for engineering design purposes and are not to be used for construction clearing purposes. Utility Designating(Quality Level B) 1. Coordinate with the City of Corpus Christi to schedule work. The City of Corpus Christi will provide permission or permits to perform work on site,or right of entry to property and any utility easements. CobbFendley will submit the required right-of-way permit applications and pay any required permitting fees, for subsequent reimbursement by the Task Order No. 1, Exhibit "A", Page 1 of 3 • 18127A SUE Services MSA—Task Order#1 (18127B) Slough Road SUE Page 2 of 3 �� CobbFendley City of Corpus Christi. 2. CobbFendley will perform Record Research to obtain utility information for site and adjacent streets that may contain utilities leading onto the site.This will assist CobbFendley in identifying utilities and marking them in the field. 3. CobbFendley will designate(means to record and mark)the horizontal location of the existing tone-able utility facilities using non-destructive surface geophysical techniques, within the delineated areas labelled as "SUE Location" in the attached exhibit.Tone-able utilities are typically utilities that are conductive or internally accessible with a traceable fish tape or sonde.Water and communication vaults can be investigated from above ground.Cobb Fendley does not typically enter buried power vaults or manholes. 4. If internally accessible(e.g.via a cleanout)nonconductive lines can often be traced out with a fish tape or sonde.Under ideal circumstances nonconductive buried lines can be investigated successfully with Ground Penetrating Radar(GPR). Soil conditions in Texas are however generally not suitable for GPR.CobbFendley has had success using GPR for SUE work but non-conductive features can remain undetected. 5. A non-water base paint, utilizing the APWA color code scheme and pin flags will be used on all surface markings of underground features. CobbFendley will provide a field sketch of designated utilities. 6. CobbFendley will survey utility field markings and above ground utility features. CADD to draft the surveyed information onto a project base map will be provided by CobbFendley. The City of Corpus Christi will provide the base map in AutoCAD or Microstation format,as well as the applicable project survey control information. Vacuum Excavation(Quality Level A) In locations where the depth of identified buried utilities is requested, CobbFendley can perform Quality Level A vacuum test holes. Test holes are excavated using a nondestructive compressed air vacuum excavation truck. The Quality Level A Test Holes,up to five (5),will be performed within the delineated areas labelled as SUE Location 27,30 and 35 in the attached plan exhibit and are listed in the attached SUE Request spreadsheet. The locations on the attached plan exhibit that are struck- through in red are not included in this scope of work. It is understood that,for the sake of expediency,exposure of the requested utilities will be conducted either with individually excavated test holes,or slot trenches to expose multiple nearby utilities within one excavation. Vacuum excavation is performed as follows: 1) Comply with policies for the prevention of underground utility damage(i.e.,one-call system). CobbFendley will obtain permission and permits to perform work and determine location of test holes. 2) Vacuum excavate to measure and record the depth and location of found items. CobbFendley accepts no responsibility for contaminated soils should they be encountered during excavation. CobbFendley does not take ownership of any excavated material. 3) Record depth of the utility,line size,line material,condition of the line,type of soil around the line.Provide markers at each utility location. 4) Backfill the hole. Compact in lifts.Restore pavement. 5) Survey of utility test hole locations. 6) CobbFendley will provide copies of field test holes data sheets showing utility depth,size and line material,condition of the line,type of soil for each location. It is anticipated that traffic control will be required for SUE on this site. Standard traffic control is performed by CobbFendley and is included in our standard rates. Standard traffic control can be described as short-term lane closure necessary to access Task Order No. 1, Exhibit"A", Page 2 of 3 18127A SUE Services MSA—Task Order#1 (18127B) Slough Road SUE Page 3 of 3 ::_: CobbFendley utility features located in the roadway. It is anticipated that non-standard traffic control (lane closures,police officer present, arrow board,etc...)will be required to perform these services. The costs for non-standard traffic control have been estimated and included in this fee estimate and will be passed through to the City of Corpus Christi on our invoice,at cost plus 5%. It is anticipated that test holes will be backfilled with native soil excavated at each site,however,if select backfill is needed due to wet soil conditions or right-of-way inspector requirement,cost for select backfill will be invoiced to the City of Corpus Christi on our invoice,at cost plus 5%. Basis of Compensation Quality Level B SUE 2018 Rate Unit Quantity Sub-Total Project Manager $194.25 Hour 2 $388.50 Utility Specialist/Coordinator $141.75 Hour 4 $567.00 CADD $89.25 Hour 6 $535.50 Clerical $73.50 Hour 1 $73.50 SUE Tech I $89.25 Hour 8 $714.00 SUE Tech II $110.25 Hour 8 $882.00 Survey Crew $162.75 Hour 8 $1,302.00 RPLS $162.75 Hour 2 $325.50 per diem and hotel $136.50 Day/person 4 $546.00 Support Truck SUE $89.25 Day 1 $89.25 Mobilization S638.40 Each 1 $638.40 Quality Level B Total $6,061.65 Quality Level A SUE 2018 Rate Unit Quantity Sub-Total Quality Level A Vacuum Excavation-Daily Rate $4,685.63 Day 3 $14,056.89 Quality Level A SUE Survey $2,200.00 Day 1 $2,200.00 Traffic Control(Estimate) $1,200.00 Day 3 $3,600.00 Permitting Time $141.75 Hour 4 $567.00 Permitting Fees(Estimate) $500.00 Lump Sum 1 $500.00 Mobilization $638.40 Each 1 $638.40 Quality Level A Total $21,562.29 Task Order Total $27,623.94 If you have any questions or comments,please do not hesitate to contact us. Sincerely, /11•XVX' Joe Marek Sr.Project Manager COBB,FENDLEY&ASSOCIATES,INC. Task Order No. 1, Exhibit "A", Page 3 of 3 • • EXHIBIT B TASK ORDER SUMMARY Master Services Agreement Subsurface Utility Engineering (SUE) Services Project No. 18127A TASK NOT TO DESCRIPTION AMOUNT EXCEED AMOUNT Maximum Contract Amount (Cobb, Fendely &Associates, Inc., Oct. 30, $300,000.00 2018, Motion M2018-207) TASK ORDERS: 27,623.94 Task Order Number 1 18127B Slough Road from Rodd Field Road to Dead End (Bond 27 623.94 2018) 18042A Amount Remaining on Master Services Agreement $272,376.06 Task Order No. 1 Exhibit "B" Page 1 of 1