HomeMy WebLinkAboutC2019-108 - 3/20/2019 - NA TASK ORDER NO. 42 This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. (Consultant) dated August 16, 2016 (Agreement). Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. PROJECT NAME/NUMBER: Water and Wastewater Treatment On-Call Support, E16264 1. PROJECT DESCRIPTION—This project provides the Utility Department with on-call services to assist with any technical,operational, maintenance,diagnostic and design concerns for the City's O.N.Stevens Water Treatment Plant and six wastewater treatment plants. 2. SCOPE OF SERVICES —ONSWTP Effluent Filter Piping Assessment, more fully described in Exhibit A. 3. COMPENSATION —The total amount not to exceed for Task Order No. 42 only is $7,076.00. This Task Order is approved, and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF C• 11P RIST LNV, INC. 1" 2# F 3/14 Jtq •eff H. Edmonds, P.E. •ate .�orDa . Leyendecker, P.E. Date Director of Engineering Services President 801 Navigation, Suite 300 Corpus Christi, TX 78408 (361) 883-1984 Office loganb@Invinc.com Fund Name Accounting Unit Account No. Activity No. Amount Water Operating Fund 4010-31010-062 530000 E16264-01-4010-EXP $7,076.00 C2019-108 3/20/19 LNV Inc. Task Order No. 42 Page 1 of 1 S1ANNFfl Professional Services Contract City of Corpus Christi Water/Wastewater Treatment On-Call Support City Project No. E16264 Task Authorization No. 42 — ONSWTP Effluent Filter Piping Assessment March 14, 2019 UMV EXHIBIT A Page 1 of 4 SCOPE OF WORK Water and Wastewater Treatment On-Call Support Project No. E16264 Task Authorization No. 42— ONSWTP Effluent Filter Piping Assessment PURPOSE The ON Stevens WTP uses sand and anthracite filters in both Plant 1 and Plant 2. Filtered Water from Filters in both the North and South Buildings flows through a 20-inch pipe from each filter unit to a closed filtered water flume. Corrosion has been recently observed at locations where the 20-inch pipe passes through concrete to convey water to the filtered water flume. The condition of 20-inch pipes inside the flume cannot be observed, which is also suspected to be corroded. The purpose of this task authorization is to provide assistance to the City by performing an assessment of these 20-inch pipes. Under this task authorization, visual and ultrasonic testing (to be performed by HOT Inspection Services, Inc.) of pipes will be performed to define the condition of pipe walls. In this phase of the task, power tool cleaning and minimal destructive testing may be necessary. A total of 4 pipes will be evaluated representing approximately 20% of the 22 pipes present, two (2) from each Filter location (North and South). A report (produced by HOT Inspection Services, Inc.) will be issued to the City detailing the results of testing and recommending for remedial measures needed in order to resolve the issues. Based on the findings of the assessment, the City will make decisions regarding the future course of action and a separate task authorization may be issued for the implementation of selected remedial measures. SCOPE OF WORK ADDITIONAL SERVICES: ITEM 9—General Engineering Task 0001 —ONS WTP Effluent Filter Piping Inspection The Engineer will perform the following: i. Review record information for filter piping ii. Coordinate and conduct one(1) site visit for visual inspection iii. Coordinate and conduct one (1) site visit for ultrasonic testing for a total of 4 pipes,2 in each filter building iv. Prepare/submit report to the City that will provide the following information: • Findings of visual assessment and ultrasonic testing • Remedial measures Note: The report to be provided will be prepared by HOT Inspection Services, Inc. with Quality Assurance/Quality Control (QA/QC)review and coordination with the City by LNV. 1 of 3 EXHIBIT A Page 2 of 4 DELIVERABLES A report produced by HOT Inspection Services, Inc. will be issued to the City detailing the results of testing and recommendation for remedial measures needed in order to resolve the issues. SCHEDULE The Engineer's services shall be performed in a timely manner consistent with sound professional practices. The Engineer will complete the work according to the following schedule: Activity Completion Date Contract Execution -Notice to Proceed (NTP) TBD Task 0001 — ONS WTP Effluent Filter Piping Inspection - Review Record Information 1 week after NTP - Visual Inspection Site Visit 1 weeks after NTP - Ultrasonic Testing 3 weeks after NTP - Final Report 4 weeks after NTP The time limits set forth in the schedule shall include allowances for reasonable and expected review time by the City and approval by authorities having jurisdiction over this project, and shall not be allowed as cause for delay or adjustments to the schedule. Delays caused by review times by the City exceeding those anticipated by the Engineer's schedule are cause for adjustments in the schedule. Any adjustments made to the agreed upon schedule shall be made in writing and accepted by both parties. The Engineer shall begin work immediately upon receipt of the executed Task Authorization and/or Notice to Proceed (written or emailed). FEE The services for all tasks listed under this task authorization will be provided on a Time and Materials (T&M) basis. The anticipated amount for this task authorization is $7,076.00, as shown in ATTACHMENT A. The Engineer will not incur cost in excess of this not-to-exceed amount without prior written authorization from the City. 2 of 3 EXHIBIT A Page 3 of 4 TASK AUTHORIZATION MANAGER The Task Authorization Manager will be the primary contact person during the performance of this work. All correspondence or inquiries should be addressed to the Task Authorization Manager. This work task will be coordinated by: Alex Barabanov, P.E. Senior Project Manager City of Corpus Christi Office: 361-826-1873 Email: AlexBa@cctexas.com 3 of 3 EXHIBIT A Page 4 of 4