Loading...
HomeMy WebLinkAboutC2019-189 - 3/29/2019 - NA • CITY OF CORPUS CHRISTI AMENDMENT NO. 2 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas, hereinafter called "CITY," and Martinez, Guy & Mavbik, Inc., hereinafter called "ENGINEER," agree to the following amendment to the Contract for Professional Services for Community Park Development and Improvements — Bill Witt Park (Bond 20121 (Project No. E14002, Parent Project E121151 as authorized and administratively amended by: Original Contract April 23, 2013 Motion No. M2013-073 $156,780.00 Amendment No. 1 December 17, 2015 Administrative Approval $25,000.00 In the Original Contract, Exhibit A, Scope of Services shall be amended as set forth in the attached Amendment No. 2, Exhibit A. In the Original Contract, Exhibit A, Fees shall be amended based on the modified scope of services in the attached Amendment No. 2, Exhibit A for a fee not to exceed $6,560.00, for a total restated fee not to exceed$188,340.00. All other terms and conditions of April 23, 2013 Contract for Professional Services between the City and Consultant, and of any amendments to that contract, which are not specifically addressed herein shall remain in full force and effect. C •F $ ' - C TI M' -TINEZ GUY& A BIK, INC 3(.. • V:lerie H. Gr-y, P.E. Date icardo Martinez, r ' ma e E e tive Direlstor Fo Public •rks President 6000 S. Staples S . a 207 RECOMMENDS Corpus Christi, TX 78413 q / (361) 814-3070 Office 7 I rmartinez@mgm-inc.com Becky Perrin Date Interim Director of Parks and Recreation APPROVED AS TO LEGAL FORM 2019.03.25 10:30:58 -05'00' Assistant City Attorney Date TES ity Secretary Amendment No.2 Contract for Professional Services C2019-189 Page 1 of 2 3/29/19 Martinez, Guy & Maybik Inc. SCANNF Accounting Unit: 3293-141 Account: 550950 Activity: E14002-01-3293-EXP Account Category: 50950 Fund Name: PK&RC2013GOBD12 Amount: $6,560.00 Amendment No.2 Contract for Professional Services Page 2 of 2 • MARTINEZ, GUY & MAYBIK, INC. February 28, 2019 ENGINEERS&SURVEYORS Ms.Sarah West P.E. 6000 S.Staples,Suite 207 CorpusChristi, City of Corpus Christi-Major Projects Engineer Texas78413 Offficee33661..8814.3070 1201 Leopard Street Corpus Christi,Texas 78469 Offices in Houston&Corpus Christi RE: Community Park Development & Improvements Bill Witt Park(Bond 2012), Project No. E14002—Contract Amendment No. 2 Proposal Dear Ms. West: MGM Inc. was informed by the City's construction department on 12/28/2018 in regards to the installation of the new grates at parking lot #2 (adjacent to the existing kickball field). Upon MGM Inc.'s field visit it was noted that the edge of parking lot #2 was shifted closer to the drainage swale, and was also built up to a higher elevation that was not per the design elevations of the construction plans. As a result the alterations to parking lot#2 have created a construction issue with the drainage design and will now require the installation of concrete retaining walls at the grate inlet areas to retain the steep edges of the built up parking lot in lieu of sloping the grade into the proposed swale as shown in the original construction plans. Since parking lot #2 has changed in dimensions and vertical elevation MGM Inc. will now need to survey the full length of the drainage area at parking lot #2. MGM Inc. will also be providing engineering services and new construction plans for the required concrete retaining walls. COMPENSATION MGM proposes to perform continued construction phase services for the aforementioned project for a total fixed fee of SIX THOUSAND FIVE HUNDRED AND SIXTY DOLLARS AND ZERO CENTS ($6,560.00). 1. Surveying Services $ 2,260.00 2. Engineering Services $ 950.00 3. Provide Revised Plans & Retaining Wall Plans/Details $ 2,550.00 4. Additional Project Management Services and Construction Administration Services $ 800.00 February 28, 2019 1 Community Park Development& Improvements Bill Witt Park(Bond 2012), Project No. E14002 City of Corpus Christi Exhibit A Page 1 of 3 Said fee shall be paid as follows:monthly payments based on the progress of services rendered. Any Additional Services performed hourly by MGM and as authorized by the Client, would be charged according to the following rates: Project Management/Engineering at $135/hour; Windstorm Engineer at $130/hour; and Administration Assistance at $55/hour. Summary of Fees Basic Services Fees Original Amendment Amendment Contract No. 1 No. 2 1. Preliminary Phase $22,840.00 $0.00 $0.00 2. Design Phase $69,800.00 $30,370.00 $5,760.00 3. Bid Phase $6,620.00 $0.00 $0.00 4. Construction Administration Phase $15,680.00 $0.00 $800.00 Subtotal Basic Services Fees $114,940.00 $30,370.00 $6,560.00 Additional Services Fees 1. Permit Preparation To Be $0.00 $0.00 Determined 2. ROW Acquisition Survey None $0.00 $0.00 Anticipated 3. Topographic Survey $27,680.00 $0.00 $0.00 4. Environmental Issues $1,920.00 ($1,920.00) $0.00 5. Public Involvement $4,600.00 ($3,450.00) $0.00 6. Subsurface Utility Investigation $5,240.00 $0.00 $0.00 7. Construction Observation Services To Be $0.00 $0.00 Determined 8. Start-up Services Not Applicable $0.00 $0.00 9. Warranty Phase $2,400.00 $0.00 $0.00 Sub-Total Additional Services Fees Authorized $41,840.00 ($5,370.00) $0.00 Total Authorized Fee $156,780.00 $25,000.00 $6,560.00 Approved Approved Pending Approval from Approved By: City February 28, 2019 2 Community Park Development& Improvements Bill Witt Park (Bond 2012), Project No. E14002 City of Corpus Christi Exhibit A Page 2 of 3 Sincerely, MARNEZ, GUY & MAYB K, INC. Richard Martinez, E. President Accepted by CITY OF CORPUS CHRISTI (CLIENT) Accepted this day of February 2019, By: Authorized Signature Printed Name &Title • February 28, 2019 3 Community Park Development&Improvements Bill Witt Park(Bond 2012), Project No. E14002 City of Corpus Christi Exhibit A Page 3 of 3