Loading...
HomeMy WebLinkAboutC2019-190 - 3/29/2019 - NA CITY OF CORPUS CHRISTI AMENDMENT NO. 1 to the CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City") and Urban Engineering ("Consultant"), agree to the following amendments to the Contract for Professional Services for Kinney& Power Street Pump Station Improvements (Project No. E16320): Original Contract September 11, 2018 Motion No. M2018-159 $162,527.00 Exhibit A, Scope of Services shall be amended as set forth in the attached Amendment No.1, Exhibit A. Exhibit A, Fees shall be amended based on the modified scope of services in the attached Amendment No. 1, Exhibit A for a fee not to exceed $0.00, for a total restated fee not to exceed $162,527.00. All other terms and conditions of the September 11,2018 Contract for Professional Services between the City and Consultant, and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPUS C 4-r011" URBAN ENGINEERING ' 3 Z41 l7 Mar 28, 2019 do(ker 28,2019 Jeff H. dmonds, P.E. D to James L. Urban, P.E. Date Director of Engineering Services Principal 2725 Swantner Corpus Christi, TX 78404 (361) 884-3101 Office (361) 854-6001 Fax jimu@urbaneng.com markm@urbaneng.cam APPROVED AS TO LEGAL FORM � )® 2019.03.28 15:26:56 -05'00' Assistant City Attorney Date ATTEST C'u twt?, 3/a/17 Re cca Huerta Date City Secretary K:\ENGINEERING DATAEXCHANGE\CLARISSAJ\SEAWALL-TYPE A1E16320-KINNEY ST AND POWER ST PUMP STATION\URBAN-AMENDMENT NO.1\AMENDMENT NO.1 DOC 02019-190 3/29/19 Urban Engineering SCANNFD L1 URBAN ENGINEERING Job No. 36688.B700 March 20, 2019 VIA EMAIL Mrs. Sarah West, P.E. Engineering Services City of Corpus Christi P. 0. Box 9277 Corpus Christi, Texas 78469 Subject: Kinney& Power St. Pump Station Improvements City Project No. E16320 Dear Sarah: As a part of the subject project our team scope included review and assessment of the 2016 XPSWMM 1 D/2D model previously developed by HDR for the downtown drainage system. This model is to be used to evaluate present requirements and capacity of the downtown system and to determine the feasibility of interim solutions to maximize the capacities of the existing drainage system. As we have discussed, during our review of the model we determined several issues that we believe need to be addressed. These issues and/or proposed updating of the model are outside the scope of the original project. The intent of revisions to the XPSWMM model is to get as accurate a model as possible and updating it will directly impact the understanding of the conditions within downtown Corpus Christi and the development of drainage improvements. We believe that the proposed improvements to the model are very important, even critical, to providing an accurate model for the task we have been given. The proposed critical model revisions are listed in the following: 1. Pump Station configuration issues 2. 1D model not properly connected to the 2D model in several areas in the downtown area and where the Water St. horseshoe trunkline is not connected to laterals. These areas are allowing water to enter the bay when the local storm sewer should flow into the downtown system toward the Power St. Pump Station. 3. Salt Flats 1D model not properly connected to 2D near the bay. This does not allow the Resaca area to properly drain at the beginning and at the end of the storm event. 4. Stranded water areas that directly affect the pump station behavior need to be address by adding 1 D/2D connections at trunklines. 5. XPSWMM catchment flows incorrectly being applied outside the levee area near Salt Flats. The existing AE contract has an Additional Service to review possible impacts of the new Harbor Bridge Relocation Project on the downtown drainage system. Based on the information provided to date, the effects of the Harbor Bridge relocation project on the downtown system appear to be relatively minor. The$16,225 allocated for the Harbor Bridge updates, could be more effectively used to support the modeling update noted above. We propose to provide the necessary revisions and updating of the XPSWMM model for a fee of $16,225 and request the (361)854-3101 2725 SWANTNER DR.• CORPUS CHRISTI,TEXAS 78404 FAX(361)854-6001 www.urbaneng.corn TBPE Firm#145 TBPLS Firm#10032400 EXHIBIT A Page 1 of 3 Sarah West, P.E. March 20, 2019 Page 2 City prepare a no cost AE amendment to our original contract. An updated Fee Summary is provided in the following: Updated Fee Summary Basic Services: Contract Amd No. 1 Total Contract 1. Workshop/Meetings/Proj. Management(T&M Allowance) $30,776 $0 $30,776 2. Pump Station Site Visits $7,270 $0 $7,270 3. Initial Assessment of Conditions& Recs $39,883 $0 $39,883 4. Power St. Pump Station Evaluation $19,356 $0 $19,356 5. Kinney St. Pump Station Evaluation $19,356 $0 $19,356 6. Deliverables& Expenses $29,661 $0 $29,661 7. Model Updating/Revisions $0 $16,225 $16,225 Subtotal Basic Services $146,302 $16,225 $162,527 Additional Services Fees: 1. Harbor Bridge Relocation Drainage Impact Evaluation (authorization required) $16,225 -$16,225 $0 Sub-Total Additional Services $16,225 -$16,225 $0 Summary of Fees: Basic Services Fees $146,302 $16,225 $162,527 Additional Services Fees $16,225 -$16,225 $0 Total of Fees $162,527 $0 $162,527 Updating the model has an impact on the project schedule. An updated schedule is provided in the following: Updated Project Schedule Activity March 8,2019 Notice To Proceed(NTP) Complete Task 1: Initial Assessment&Kickoff Meeting June 27, 2019 Task 1: Prel Technical Memo Workshop Complete Task 2: Pump Station Site Visits April 12,2019 Task 3: Initial Assessment of Current Conditions May 24,2019 Task 4: Power St. Pump Station Evaluation May 24,2019 Task 5: Kinney St. Pump Station Evaluation August 15,2019 Task 6: Presentation of Final Project Deliverables April 5,2019 Task 7: Modeling Updating/Revisions EXHIBIT A Page 2 of 3 • Sarah West, P.E. March 20, 2019 Page 2 Please review and let me know if any questions. If acceptable, please have an AE fee amendment agreement processed. Sincerely, URBAN ENGINEERING Mark Maroney, P. E. MM/ EXHIBIT A Page 3 of 3 E16320 Urban Amd 1 Final Audit Report 2019-03-28 Created: 2019-03-28 By: Elsa Kroeger(elsak@urbaneng.com) Status: Signed Transaction ID: CBJCHBCAABAASu9MmtwhBTG4NOxFKZ-8o9_Lg08njOY1 "E16320 Urban Amd 1 " History t Document uploaded by Elsa Kroeger(elsak@urbaneng.com)from Acrobat 2019-03-28-4:20:29 PM GMT-IP address:24.173.56.98 C'-. Document emailed to jim urban (jimu@urbaneng.com)for signature 2019-03-28-4:20:50 PM GMT t Document viewed by jim urban (jimu@urbaneng.com) 2019-03-28-4:22:58 PM GMT-IP address: 107.77.219.63 CY° Document e-signed by jim urban (jimu@urbaneng.com) Signature Date:2019-03-28-4:23:34 PM GMT-Time Source:server-IP address: 107.77.219.63 d Signed document emailed to jim urban (jimu@urbaneng.com), Mark Maroney (markm@urbaneng.com)and Elsa Kroeger(elsak@urbaneng.com) 2019-03-28-4:23:34 PM GMT a Adobe Sign