HomeMy WebLinkAboutC2019-369 - 5/17/2019 - NA TASK ORDER NO. 33
This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing
by and between City of Corpus Christi, Texas (City) and Rock Engineering &Testing Laboratory, Inc., (Lab)
dated January 16, 2018 by Motion No. M2018-005 (Agreement). Lab shall perform services on the project
described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until
it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement
as it pertains to the project described below.
MSA PROJECT NUMBER/NAME: 17100A Geotechnical and Construction Materials Testing
TASK ORDER PROJECT NUMBER/NAME: 17100AH Geotechnical and Construction Materials Testing
1. PROJECT DESCRIPTION: 18160A City Wide Water Distribution System Repair and Replace IDIQ
Year 3 —Contract Renewal #2
2. SCOPE OF SERVICES—GeoTech and/or Construction Material Services to observe, test and report for
the City Wide Water Distribution System Repair and Replace IDIQ Year 3 — Contract Renewal #2
project,and as more fully described in Exhibit A.
3. COMPENSATION—The total amount not to exceed for this Task Order only is $35,760.00.
This Task Order is approved, and Lab may proceed. All other terms and conditions of the Agreement remain
in full force and effect.
0- 10CITY OF CORPUS I ROCK ENGINEERING&TESTING
LABORATORY, INC.
r
i' a S l 7 �� 05-14-19
Jeff . Edmonds, P.E. D to urtis A. Ro Date
Director of Engineering Services C ' erating Offic
6817 Leopard Street
Corpus Christi, TX 78409
(361) 883-4555 Office
curtis@rocktesting.com
Project Number: 18160A
Accounting Unit: 4098-041
Account: 550920
Activity: 18160-A-4098-EXP
Account Category: 50920
Fund Name: Water 2019 CIP
Amount: $35,760.00
Task Order No. 33
Testing Agreement
Page 1 of 2
SCANNED
TASK ORDER FUNDING REQUEST FORM
CONTRACT MSA#AND TITLE: 17100A Geotechnical and Construction Materials Testing(ROCK)
TASK ORDER PROJECT#/TITLE: 17100AH Geotechnical and Construction Materials Testing(ROCK)
REQUESTING DEPARTMENT:ENGINEERING DEPARTMENT
FUND NAME/FUND#-ME: ACCOUNT: ACTIVITY:
4098-041 550920 18160-A-4098-EXP
CONSULTANT:Rock Engineering
TASK ORDER#:33
SCOPE OF WORK:SEE PROPOSAL
TASK ORDER IS FOR PROJECT(S)LISTED BELOW:
PROJECT# FEE PROJECT NAME
18160A $35,760.00 City Wide Water Dist Syst Rep/Repl IDIQ Contract Renewal#2
$35,760.00 Grand Total
SANDRA GOMEZ,PE
P '' NT NAME: 1) ,&„...„,„(5_,4/
'IGNATURE:
5/ elII61
DATE:
Task Order No. 33
Testing Agreement
Page 2 of 2
•
v rF • GEOTECHNICAL ENGINEERING
• CONSTRUCTION MATERIALS
441-.4o
/ 0 C . ENGINEERING &TESTING
eo SOILS •ASPHALT• CONCRETE
A
May 2,2019
City of Corpus Christi
Jeffrey Edmonds, PE
SUBJECT: ESTIMATED TESTING BUDGET FOR THE PROPOSED
18160A CITY WIDE WATER DISTRIBUTION SYSTEM REPAIR AND REPLACEMENT YR 3 ID IQ
Corpus Christi,TX
RETL Proposal Number: P050119B
Dear Mr. Edmonds,
Rock Engineering and Testing Laboratory, Inc. (RETL) (TBPE Firm No. 2101) is pleased to provide an estimate to
perform the required Construction Materials Testing for the above referenced project. The Construction Materials
Testing for the above referenced construction project is based upon quantities as derived from the information as
provided to RETL as of the date of this proposal.
We understand that we have been chosen to provide these services for this publicly funded project. Therefore, by
providing cost information we are not in violation of the Texas Professional Services Procurement Act.
The estimated testing amount for this project is$35,760.00 This estimate will change and is dependent upon the
actual scope of work performed as requested by project representatives as well as any implemented
recommendations once the Geotechnical Report has been issued. Requested services beyond what is contained in
this estimate will be billed based on the unit rates contained here-in.
Please make note that the actual fees invoiced for this project will be based on the actual testing requested and
performed. The total fee assessed will be dependent on the contractor's construction techniques, number of trips
made to the jobsite, elapsed time from technician arrival to commencement of testing activities, and any stand-by
time the technician is required to be on-site but not performing testing activities.
This estimate does not take into account project schedule,weather delays, and cancellations of services after arrival,
etc. which are beyond RETL's control. Also note, that holiday/Sunday rates do apply as well as overtime rates for
services beyond 8 hours at a rate of$102.00 per hour.
In order to best respond to the project testing needs and schedules, please schedule testing a minimum of 48 hours
in advance in order to defer any potential delays. RETL strives to accommodate all testing requests as they are
received and can make accommodations with advanced notice to schedules.
RETL appreciates your consideration of our firm to assist you during the construction phase of your project. If you
agree with this proposal, please sign the attached Laboratory Testing Services Agreement, submit the Distribution
List and provide billing information. Please do not hesitate to contact me at(361)883-4555 extension 415 if you have
any questions regarding the proposal or would like to discuss further.
Sincerely,
Pablo Schmitt
Project Estimator
ROCK ENGINEERING&TESTING LABORATORY,INC.
6817 LEOPARD STREET•CORPUS CHRISTI,TEXAS,78409 Exhibit A
OFFICE: (361)883-4555•FAX: (361)883-4711 •www.rocktesting.com Page 1 of 4
P050119B
.F r,
.6. CITY WIDE WATER DISTRIBUTION SYSTEM REPAIR AND REPLACEMENT YR
.c 0 OC 3IDIQ
°• CITY OF CORPUS CHRISTI
CORPUS CHRISTI,TX
JEFFREY EDMONDS, P.E.
01.SOILS
SOILS-SUBGRADE/GENERAL FILL
RAW SUBGRADE
LANES/LIFTS QTY per
MIN PER SET TESTING FREQ FREQ TOTAL RATE AMOUNT
5190 MATERIALS SAMPLING CHARGE 1 SAMPLING 5 5 EA $62.00 $310.00
S510 PROCTOR-STANDARD ASTM D698 1 PER MATERIAL 5 5 EA $233.00 $1,165.00
S600-1 NUCLEAR FIELD DENSITY Min 3(ASTM D6938) 1 SEE PLANS 80 80 EA $49.00 $3,920.00
V486 VEHICLE 1 PER TRIP 19 19 TR $49.00 $931.00
SUBTOTAL SOILS-SUBGRADE/GENERAL FILL $6,326.00
SOILS-BACKFILL
TRENCH BACKFILL
LANES/LIFTS QTY per
MIN PER SET TESTING FREQ FREQ TOTAL RATE AMOUNT
S190 MATERIALS SAMPLING CHARGE 1 PER MAT SOURCE 5 5 EA $62.00 $310.00
S510 PROCTOR-STANDARD ASTM D698 1 PER MATERIAL 5 5 EA $233.00 $1,165.00
S600-1 NUCLEAR FIELD DENSITY Min 3(ASTM D6938) 1 200LF/LIFT 60 60 EA $49.00 $2,940.00
V486 VEHICLE 1 PER TRIP 15 15 TR $49.00 $735.00
SUBTOTAL SOILS-BACKFILL $5,150.00
01.SOILS
SUBTOTAL $11,476.00
02.FLEXIBLE BASE
SOILS-BASE MATERIAL
FLEXIBLE BASE MATERIAL
LANES/LIFTS QTY per
MIN PER SET TESTING FREQ FREQ TOTAL RATE AMOUNT
S190 MATERIALS SAMPLING CHARGE 1 SAMPLING 5 5 EA $62.00 $310.00
S502 ATTERBERG LIMITS/PLASTICITY INDEX(W/AGGR)ASTM D4318 1 PER 3000 CYDS 1 1 EA $102.00 $102.00
S504 GRADATION(Sieve Analysis)ASTM C136 1 PER 3000 CYDS 1 1 EA $102.00 $102.00
S522 PROCTOR-MODIFIED ASTM D1557 1 PER 3000 CYDS 1 1 EA $274.00 $274.00
S600-1 NUCLEAR FIELD DENSITY Min 3(ASTM D6938) 1 SEE PLANS 60 60 EA $49.00 $2,940.00
V486 VEHICLE 1 PER TRIP 15 15 TR $49.00 $735.00
SUBTOTAL SOILS-BASE MATERIAL $4,463.00
02. FLEXIBLE BASE
SUBTOTAL $4,463.00
Exhibit A
Page 2 of 4
Tuesday,May 07,2019 Page 1 of 3
1. P050119B
�' 18160A CITY WIDE WATER DISTRIBUTION SYSTEM REPAIR AND REPLACEMENT YR
0c-kkip..k.,
3 ID IQ
{'°•• CITY OF CORPUS CHRISTI
CORPUS CHRISTI,TX
JEFFREY EDMONDS, P.E.
03.ASPHALT
ASPHALT
HMAC
LANES/LIFTS QTY per
MIN PER SET TESTING FREQ FREQ TOTAL RATE AMOUNT
A105 ASPHALT FULL SERIES(ASTM C117,C136,D2041,D6307) 1 PER 5001 OR DAY 5 5 EA $687.00 $3,435.00
S190 MATERIALS SAMPLING CHARGE 1 PER SAMPLE 5 5 EA $62.00 $310.00
S191 SAMPLE PREPARATION CHARGE 1 PER SAMPLE 5 5 EA $72.00 $360.00
V486 VEHICLE 1 PER TRIP 5 5 TR $49.00 $245.00
SUBTOTAL ASPHALT $4,350.00
03.ASPHALT
SUBTOTAL $4,350.00
03.MISC CONCRETE
CONCRETE
1 @7,3@28
LANES/LIFTS QTY per
MIN PER SET TESTING FREQ FREQ TOTAL RATE AMOUNT
C301-1 CONCRETE CYLINDERS 4 SEE PLANS 40 160 EA $49.00 $7,840.00
S399 CUBES/CYLINDERS PICK UP FEE 1 PER SET 40 40 POUR $48.00 $1,920.00
V486 VEHICLE 1 PER TRIP 80 80 TR $49.00 $3,920.00
SUBTOTAL CONCRETE $13,680.00
03.MISC CONCRETE
SUBTOTAL $13,680.00
04. RIGID CONCRETE PAVEMENT
CONCRETE
1 @7,3028
LANES/LIFTS QTY per
MIN PER SET TESTING FREQ FREQ TOTAL RATE AMOUNT
C301-1 CONCRETE CYLINDERS 4 DAY 5 20 EA $49.00 $980.00
S399 CUBES/CYLINDERS PICK UP FEE 1 PER POUR 5 5 POUR $48.00 $240.00
V486 VEHICLE 1 PER TIRP 10 10 TR $49.00 $490.00
SUBTOTAL CONCRETE $1,710.00
04. RIGID CONCRETE PAVEMENT
SUBTOTAL $1,710.00
Exhibit A
Page 3 of 4
Tuesday,May 07,2019 Page 2 of 3
, t P050119B
°s, 18160A CITY WIDE WATER DISTRIBUTION SYSTEM REPAIR AND REPLACEMENT YR
4' OCA 3 ID IQ
40n
°a,, CITY OF CORPUS CHRISTI
CORPUS CHRISTI,TX
JEFFREY EDMONDS, P.E.
MISCELLANEOUS
MISCELLANEOUS
ADMINISTRATION FEE
LANES/LIFTS QTY per
MIN PER SET TESTING FREQ FREQ TOTAL RATE AMOUNT
P119 ADMINISTRATION FEE 1 PER PROJECT 1 1 LS $81.00 $81.00
SUBTOTAL MISCELLANEOUS $81.00
MISCELLANEOUS
SUBTOTAL $81.00
GRAND TOTAL $35,760.00
All Laboratory Testing Rates include Technician Time and Reporting
Soil densities will be billed 3 minimum per call out(1 hour per 3 densities).
The vehicle fee includes the technician travel time and all vehicle charges.
The fee for one set of concrete test cylinders includes the technician time(1 hr),equipment,making,curing,testing and reporting.
Certified Weld Inspections(CWI)will be billed at 4 hours minimum.
TESTING NOT INCLUDED IN THIS PROPOSAL
Exhibit A
Page 4 of 4
Tuesday,May 07,2019 Page 3 of 3