Loading...
HomeMy WebLinkAboutC2019-371 - 5/21/2019 - NA RATIFICATION OF TASK ORDER NO. 41 This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. (Consultant) dated August 16, 2016 (Agreement). Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. PROJECT NAME/NUMBER: Water and Wastewater Treatment On-Call Support, E16264 1. PROJECT DESCRIPTION—This project provides the Utility Department with on-call services to assist with any technical, operational, maintenance, diagnostic and design concerns for the City's O.N.Stevens Water Treatment Plant and six wastewater treatment plants. 2. SCOPE OF SERVICES — Broadway WWTP Blower Building Repairs, more fully described in Exhibit A. 3. COMPENSATION —The total amount not to exceed for Task Order No. 41 only is $1,505.00. This Task Order is approved, and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LNV, INC. 07�--, yfro ein 1, Jeff . Edmonds, P.E. Date ter a . Leyendecker, P.E. Date Director of Engineering Services President 801 Navigation, Suite 300 Corpus Christi, TX 78408 (361) 883-1984 Office Ioganb@Invinc.com Fund Name Accounting Unit Account No. Activity No. Amount WW Capital Reserve 4510-064 550950 18084-A-4510-EXP $1,505.00 Task Order No. 41 Page 1 of 1 SCANNED City Project No. E16264 Professional Services Contract City of Corpus Christi Water/Wastewater Treatment On-Call Support Task Authorization No. 41 —Broadway Wastewater Treatment Plant Blower Building Repairs May 15, 2019 LNif EXHIBIT A Page 1 of 4 LNV T} J - r )fl3� SCOPE OF WORK Project No.E16264 Water and Wastewater Treatment On-Call Support Task Authorization No.41 — Broadway Wastewater Treatment Plant Blower Building Repairs PURPOSE The City issued the Notice to Proceed for the Broadway WWTP Blower Building Repairs Project on January 16,2017.The scope of services for the project originally included design phase services to prepare drawings and specifications for the repair of concrete walls, brick envelope, brick ties and capstone blocks in the Blower Building at Broadway WWTP. The scope of services also included windstorm inspection and certification services to perform necessary inspections during construction phase of the project and to complete and submit the WPI-2 document for the City to obtain the WPI-8 Windstorm Certificate issued by Texas Department of Insurance (TDI). According to the original contract (City Project No.7293), the project was not intended to be bid out.As a result,the scope of work did not include the preparation of Front End Documents and bid phase services. It is now the City's intention to bid out this project as a small construction contract.The purpose of this task authorization is to assist the City in preparing the Front End Documents for a small construction contract to enable the City to bid out the project.The City intends to handle all bid phase services. SCOPE OF WORK ADDITIONAL SERVICES: Task 0009—General Engineering The Engineer will perform the following: 1. Assemble a DRAFT and FINAL construction bid package for the project including: • Prepare Construction Contract Front End Documents using City's current version Note:The construction drawings and technical specifications have already been prepared under the original contract(City Project No.7293). Under this task authorization,the Front End Documents will be prepared and the bid package will be assembled. DELIVERABLES Bid Package EXHIBIT A Page 2 of 4 • ,OPPUS cN'P if LNV • e,15 SCHEDULE The Engineer's services shall be performed in a timely manner consistent with sound professional practices. The Engineer will complete the work according to the following schedule: Activity Completion Date Contract Execution-Notice to Proceed(NTP) TBD Task 0009—General Engineering 1 week after NTP The Engineer shall begin work immediately upon receipt of the executed Task Authorization and/or Notice to Proceed(written or emailed). FEE The services will be provided on a Time and Materials (T&M) basis as the project is moved towards completion. The anticipated amount for this task authorization is $1,505.00, as shown in ATTACHMENT A. The Engineer shall not incur any cost in excess of this not-to-exceed amount without prior written authorization from the City's Task Authorization Manager. TASK AUTHORIZATION MANAGER The Task Authorization Manager will be the primary contact person during the performance of this work. All correspondence or inquiries should be addressed to the Task Authorization Manager.This work task will be coordinated by: Pablo Martinez, P.E.C.P.M Project Manager City of Corpus Christi Engineering Services Office:361-826-1929 Email: PabloMl@cctexas.com EXHIBIT A Page 3 of 4 Attachment A Task Authorization No.41 Man-hour and Fee Analysis LNV Inc. Project Mgr. Project Engineer EIT II LNV TOTALS $ 205.00 $ 170.00 $ 120.00 Task Description Hrs. Sub-total Hrs. Sub-total Hrs. Sub-total Total Hrs. Total Fee 0009 General Engineering 1 5 205 2 5 340 8 S 960 11 S 1.505.00 Sub-totals 1 $ 205 2 $ 340 8 $ 960 11 $ 1,505.00 IV m � _ moo o 4 a