Loading...
HomeMy WebLinkAboutC2019-380 - 6/4/2019 - NA TASK ORDER NO. 29 This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing by and between City of Corpus Christi,Texas(City)and Professional Service Industries,Inca(Lab)dated January 16. 2018 by Motion No. M2018-005 (Agreement). Lab shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. MSA PROJECT NUMBER/NAME: 17099A Geotechnical and Construction Materials Testing TASK ORDER PROJECT NUMBER/NAME: 17099AD Geotechnical and Construction Materials Testing 1. PROJECT DESCRIPTION: El 5106 Ayers Street Pedestrian Improvements and Turn Lane Addition SPID to Gollihar Bond 2014 2. SCOPE OF SERVICES—GeoTech and/or Construction Material Services to observe,test and report for the Avers Street Pedestrian Improvements and Turn Lane Addition SPID to Gollihar Bond 2014 project, and as more fully described in Exhibit A. 3. COMPENSATION—The total amount not to exceed for this Task Order only is$110,070.00. This Task Order is approved, and Lab may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF C• PUS CHRISTI P OFESSIONAL SERVICE INDUSTRIES,INC. � 7/24ATJeI, Edmonds, P.E. Date Henry alindo, P.E. Di -ctor of Engineering Services 4V Branch Manager 810 South Padre Island Drive Corpus Christi,TX 78416 (361) 854-4801 Office henry.galindo@psiusa.com Project Number: E15106 Accounting Unit: 3551-051 Account: 550920 Activity: El 5106-01-35514-EXP Account Category: 50920 Fund Name: ST2015 GO BD 14 Amount: $110,070.00 Task Order No. 29 Testing Agreement Page 1 of 2 SCANNED TASK ORDER FUNDING REQUEST FORM CONTRACT MSA#AND TITLE: 17099A Geotechnical and Construction Materials Testing(PSI) TASK ORDER PROJECT#/TITLE: 17099AD Geotechnical and Construction Materials Testing(PSI) REQUESTING DEPARTMENT:ENGINEERING SERVICES FUND NAME/FUND#-ME: ACCOUNT: ACTIVITY: 3551-051 550920 E15106-01-35514-EXP CONSULTANT:Professional Services Industries(PSI) TASK ORDER#: 29 SCOPE OF WORK: SEE PROPOSAL TASK ORDER IS FOR PROJECT(S)LISTED BELOW: PROJECT# FEE PROJECT NAME E15106 $110,070.00 Ayers St Ped Impr/Turn Ln Add SPID/Gollihar Bond 2014 Revised $110,070.00 Grand Total MARISA ALANIZ, PM PM PRINT NAME: SIGNATURa l 2 Jy! O! DATE: Task Order No. 29 Testing Agreement Page 2 of 2 u tertek May 10, 2019 City of Corpus Christi Engineering Services 1201 Leopard Street Corpus Christi, Texas 78401 Attn: Ms. Marisa Alaniz Email: MarisaAlcctexas.com Phone: (361) 826-3526 Re: Construction Materials Testing and Observation Proposal Ayers St. Pedestrian Improvements and Turn Lane Project No. E15106(Bond 2014)-Revised TO#29 2018/2019 MSA Geotechnical and Materials Testing Corpus Christi, Texas PSI Proposal No.: 0325-275170 Dear Ms. Alaniz: Professional Service Industries, Inc. (PSI) an Intertek Company, is pleased to have been selected based on qualifications to perform Construction Material Testing and Observations Services for the above referenced project(E15106). Construction Hive TM is the primary report distribution platform used by PSI to provide a better experience to our clients. You will have 24-hour access to your reports on this website from any internet enabled device with a web browser. Construction HiveTM has powerful report viewing, retrieval and searching capabilities that allow you to find the information you are looking for faster and with greater ease. This proposal includes our services to observe, test and report on the construction material placement activities. Please note that our services will be performed on an intermittent, call-out, as requested basis. This proposal does not include full time or continuous on-site observation services. Scheduling will be the responsibility of our client's designated representative. PSI will proceed with the work upon issuance by the City of Corpus Christi of a Task Order to proceed with this project. We look forward to providing our services during construction of the above referenced project. Please do not hesitate to contact our office with any questions or concerns. Respectfully submitted, Professional Service Industries, Inc. C>,) 17( ) Felix Ovalle Henry Galindo, P.E. Project Manager Branch Manager Construction Services Exhibit A PSI •810 S.Padre Island Drive•Corpus Christi,TX 78416•Phone(361)854-4801 •Fax(361)854-6049 Page 1 of 3 intertek ESTIMATED FEES PSI Proposal No. 275170 E15106 Ayers St. Pedestrian Improvements,Corpus Christi,Texas E15106 Ayers St. Pedestrian Improvements and Turn Lane City of Corpus Christi Marisa Alaniz,E.I.T./Engineer II Estimated Construction Materials Testing Services Project No. E15106 (Bond 2014) Project: Ayers Street Pedestrian Improvements and Turn Lane, Corpus Christi, TX Unit Unit Item Total Quantity Price Earthwork Testing and Observation Soils preparation(Roadways,Sidewalks and Driveways) Engineering Technician(In-place Density Testing) Per Hour 300 $46.00 $13,800.00 Laboratory Moisture Density Relationship(Standard) Each 2 $150.00 $300.00 Atterberg Limit Determination Each 2 $65.00 $130.00 Percent Passing No.200 Sieve Each 2 $50.00 $100.00 Sample Preparation for Laboratory Testing Each 2 $50.00 $100.00 Daily Equipment Charge Per Trip 150 $65.00 $9,750.00 Sample Pickup Charge Per Trip 4 $150.00 $600.00 Transportation Charge Per Trip 150 $50.00 $7,500.00 Per Report Review Report 152 $30.00 $4,560.00 Subtotal $36,840.00 Flexible Base/Base Course(Curb Gutter/Roadway) Engineering Technician(In-place Density Testing) Per Hour 100 $46.00 $4,600.00 Sieve Analysis(Gradation) Each 4 $50.00 $200.00 Laboratory Moisture Density Relationship(Modified) Each 4 $175.00 $700.00 Atterberg Limit Determination Each 4 $65.00 $260.00 La Abrasion Each 4 $350.00 $1,400.00 Sample Preparation for Laboratory Testing Each 4 $50.00 $200.00 Wet Ball Mill Test Each 1 $300.00 $300.00 Triaxial Test Each 1 $800.00 $800.00 CBR Each 1 $400.00 $400.00 Daily Equipment Charge Per Trip 50 $65.00 $3,250.00 Transportation Charge Per Trip 50 $50.00 $2,500.00 Per Management Services for Supervision and Report Review Report 58 $30.00 $1,740.00 Subtotal $16,350.00 PSI Proposal 275170 ,^ May 10,2019 V , Page 2 of 3 Exhibit A Page 2 of 3 Utility Trench Backfill,Ditch Backfill,and Behind C&G(BOC) Engineering Technician(In-place Density Testing) Per Hour 80 $46.00 $3,680.00 Daily Equipment Charge Per Trip 40 $65.00 $2,600.00 Transportation Charge Per Trip 40 $50.00 $2,000.00 Per Report Review Report 40 $30.00 $1,200.00 Subtotal $9,480.00 Earthwork Testing and Observation Estimate $62,670.00 Concrete Testing and Observation Concrete(Sidewalks/Curb Gutter/Driveways) Engineering Technician(Concrete Sampling and Testing)4hr.Min. Per Hour 240 $40.00 $9,600.00 Concrete Cylinders(Cured and/or Tested in Compression)(4X8) Each 180 $15.00 $2,700.00 Daily Equipment Charge Per Trip 60 $65.00 $3,900.00 Sample/Cylinder Pickup(Technician,Trip,and Report Review) Each 60 $150.00 $9,000.00 Transportation Charge Per Trip 60 $50.00 $3,000.00 Per Report Review Report 120 $30.00 $3,600.00 Subtotal $31,800.00 Concrete Testing and Observation Estimate $31,800.00 Asphalt Testing and Observation Asphalt Testing and Observation(Full Time) Engineering Technician(Asphalt Monitoring and Testing) Per Hour 100 $46.00 $4,600.00 Extraction,Gradation Per Day 20 $180.00 $3,600.00 Lab Density and Stability Each 20 $75.00 $1,500.00 Theoretical Density(Rice Method) Each 20 $90.00 $1,800.00 Thickness,Air Void%,and Theoretical Density-In Place(Core) Each 6 $75.00 $450.00 Nuclear Density Gauge Per Trip 10 $65.00 $650.00 Core Machine and Generator Each 3 $250.00 $750.00 Transportation Charge Per Trip 10 $50.00 $500.00 Per Report Review Report 35 $30.00 $1,050.00 Subtotal $14,900.00 Asphalt Testing and Observation Estimate $14,900.00 Engineering & Technical Services Professional Engineering Services Professional Engineer Per Hour 4 $130.00 $520.00 Project Manager Per Hour 2 $90.00 $180.00 Subtotal $700.00 Engineering&Technical Services Estimate $700.00 Construction Materials Testing and Observation Estimated Total $110,070.00 Remarks: Estimate Only. Does Not Account for Material Overruns,Cancellation Fees,and Weekends PSI Proposal 275170 '^ May 10,2019 V 1 Page 3 of 3 Exhibit A Page 3 of 3