Loading...
HomeMy WebLinkAboutC2019-407 - 6/24/2019 - NA CITY OF CORPUS CHRISTI AMENDMENT NO. 2 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City") and Govind Development, LLC("Consultant"),agree to the following amendments to the Contract for Professional Services for Corona Drive from Flynn Parkway to Everhart Road BOND 2014(Project No. El 3091): Original Contract February 18, 2014 Ordinance No. 030096 $546,986.00 Amendment No. 1 I April 12, 2017 Administrative Approval $16,870.00 In the Original Contract, Exhibit "A", Section I. Scope of Services shall be amended as set forth in the attached Amendment No. 2, Exhibit"A". In the Original Contract, Exhibit"A",Section III. Fees shall be amended based on the modified scope of services in the attached Amendment No.2. Exhibit"A"for a fee not to exceed $12,500.00,for a total restated fee not to exceed $576,356.00. All other terms and conditions of the February 18, 2014 Contract for Professional Services between the City and Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect. - O' 4 S' STI GO ND DEVELOPMENT, LLC 4. 2 ? 44 , .eff H. Edmonds, E., D to Ajm:r Kular, P.E. Date Director of Engineering Services Vice President 9510 Leopard Street Corpus Christi, TX 78410 APPROVED AS TO LEGAL FORM (361)241-2777 Office 2019.06.10 16:19:22 akular@govinddevelopment.com -05'00' Assistant City Attorney Date S amu . Ci Secretary Date SCANNED Corona Drive from Flynn Parkway to Everhart Road BOND 2014 (Project No. E13091) Govind Development, LLC Amendment No. 2 $12,500.00 Fund Name Accounting Unit Account No. Activity No. Amount ST 2015 GO Bond 2014 3551-051 550950 E13091-01-3551-EXP $12,500.00 Total $12,500.00 • I/aL //ND Govind Development,Engineering Division 9510 Leopard St LLC Corpus Christi,TX 78410 ENG/NE£JZING UN/S/O-N April 9, 2019 Jeff Edmonds, P.E. Director of Engineering Services City of Corpus Christi 1201 Leopard Street Corpus Christi,Texas 78401 RE: Amendment No. 2 for Detail Design Engineering Services Corona Drive (Flynn Parkway- Everhart Road) (Bond 2014) (Project No. E13091) Dear Mr. Edmonds, Govind Development, LLC (GDL) is pleased to provide our engineering fee proposal amending the base contract for Corona Drive (Flynn Parkway - Everhart Road) (Bond 2014) by providing services for detailed design on additional work, as requested by the City of Corpus Christi, Department of Engineering Services. Below is the scope of work based on discussion with City staff. Scope of Work The design work includes the additional services related to the following: (Island Gate Way): > Providing several models simulating heavy truck movements in and around adjacent private property. Coordination meetings to review models on-site and at city locations. ➢ Additional field survey work along private property accounting for new road widening from 24' to 36' back-to-back. > Revised plan sheets and profile sheets depicting the revised turning radius and road widening. > Revised plan sheet for the intersection detail. > Revised access detail with adjusted construction concrete surface tie-in detail drawing. > Exhibits provided for new Right of Way(ROW) land acquisition, Metes&Bounds Description. (Corona Drive) ➢ Traffic control sequencing coordination and meetings, beyond scope of performance measures. > AEP lighting revised layout,site-visits and meetings relevant to the approved revised TCP. CONFIDENTIALITY NOTICE-This document Is the property of Govind Development,LLC and contains information that is highly confidential,proprietary and Attorney/Client Privileged,and which Govind Development considers trade secrets and has diligently protected as such.It is Intended only for the specific purpose for which it was prepared and for disclosure only to the persons or entity to whom it is addressed.It may not be disclosed to other parties without the express written consent of Govind Development,LLC.The unauthorized disclosure of any AMEND. NO. 2 information contained in the Proposal will cause Govind Development great and irreparable harm Exhibit "A" Page 1 of 3 Project Contract Summary of Fees (to date): This proposal amends the base contract for the following amounts: Base Contract Total: $546,986 Amendment No.1 Total: $16,870 Amendment No.2 Total: $12,500 (Current Scope) Adjusted Total of contract: $576,356 If you have any questions, please contact me at(361)241-2777 or Chale@govinddevelopment.com. Respectfully, Chris Hale, P.E. Civil Section Manager Govind Development, LLC—Engineering Division CONFIDENTIALITY NOTICE-This document is the property of Govind Development,LLC and contains Information that is highly confidential,proprietary and Attorney/Client Privileged,and AMEND. NO. 2 which Govind Development considers trade secrets and has diligently protected as such.It is intended only for the specific purpose for which it was prepared and for disclosure only to the persons or entity to whom it is addressed.It may not be disclosed to other parties without the express written consent of Govind Development,LLC.The unauthorized disclosure of any Exhibit rrA" information contained In the Proposal will cause Govind Development great and irreparable harm Page 2 of 3 • Corona Drive from Flynn Parkway to Everhart Road Project No. E13091 Bond 2014 Summary of Fees Original Contract Amendment No. 1 Amendment No. 2 Total Basic Services 1 Preliminary Phase $50,000.00 $0.00 $0.00 $50,000.00 2 Design Phase 154,300.00 16,870.00 6,400.00 177,570.00 3 Bid Phase 9,430.00 0.00 0.00 9,430.00 4 Construction Administration Phase 37,270.00 0.00 0.00 37,270.00 Subtotal Basic Services 251,000.00 16,870.00 6,400.00 274,270.00 Additional Services 1 Permit Preparation 7,300.00 0.00 0.00 7,300.00 2 ROW Acquistion Survey 12,375.00 0.00 500.00 12,875.00 3 Corona Re-alignment ROW 4,400.00 0.00 0.00 4,400.00 Acquisition Survey _ 4 Topographic Survey and Parcel 25,950.00 0.00 200.00 26,150.00 Descriptions 5 Corona Re-alignment Topographic 6,800.00 0.00 0.00 6,800.00 Survey 6 Environmental Issues TBD 0.00 0.00 TBD 7 Public Involvement 10,000.00 0.00 0.00 10,000.00 8 Subsurface Utility Investigation 65,525.00 0.00 0.00 65,525.00 9 Franchise Utility Coordination 20,000.00 0.00 0.00 20,000.00 10 Construction Observation Services TBD 0.00 0.00 TBD 11 Corona Re-alignment Schematic 29,700.00 0.00 0.00 29,700.00 Design 12 Geotechnical Services 23,595.00 0.00 0.00 23,595.00 13 Hydraulic and Hydrologic Modeling 21,600.00 0.00 0.00 21,600.00 and Analysis 14 Traffic Control Planning and Design 16,000.00 0.00 4,400.00 20,400.00 _ 15 Traffic Signal Design 13,120.00 0.00 0.00 13,120.00 16 Roadway Illumination Design 15,421.00 0.00 1,000.00 16,421.00 _ 17 CCTV Inspection Services 24,200.00 0.00 0.00 24,200.00 18 Warranty Phase TBD 0.00 0.00 TBD Subtotal Additional Services 295,986.00 0.00 6,100.00 302,086.00 Total Authorized Fee $546,986.00 $16,870.00 $12,500.00 $576,356.00 02/18/14 04/12/17 Ord. 030096 Admin. Approval Admin. Appproval AMEND. NO. 2 Exhibit"A" Page 3 of 3