Loading...
HomeMy WebLinkAboutC2019-408 - 6/25/2019 - NA CITY OF CORPUS CHRISTI AMENDMENT NO. 3 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City") and Govind DeveloamentL LLC.("Consultant"),agree to the following amendments to the Contract for Professional Services for North Padre Island Beach Access Road 3A and 2 BOND 2014, Prop. 2 (Project No. E15111): Original Contract May 31, 2016 Motion No. M2016-056 $73,935.00 Amendment No. 1 May 4;2017 Administrative Approval $16,150.00 Amendment No. 2 November 13, 2018 Motion No. M2018-215 $59,350.00 In the Original Contract, Exhibit"A", Section I. Scope of Services shall be amended as set forth in the attached Amendment No. 3, Exhibit"A". In the Original Contract, Section 4. Fee shall be amended based on the modified scope of services in the attached Amendment No.3,Exhibit"A"for a fee not to exceed$8,500.00,fora total restated fee not to exceed$157,935.00. All other terms and conditions of the May 31, 2016 Contract for Professional Services between the City and Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect _ / - ' ' PS '1ST/ GO IND DEVELOPMENT, LLC. • • • -.400I11641.03-.,l 4/3// eff H. Edmonds, P. E. D-.- Ajm r Ku lar, P.E. Date Director of Engineering Services Vice President 9510 Leopard Street Corpus Christi, TX 78410 APPROVED AS TO LEGAL FORM (361) 241-2777 Office 2019.06.06 09:34:22 akular@govinddevelopment.com 05'00' • Assistant City Attorney Date eST Xe(Q)26C},` t+LACAA-ek PC5/161 L City Secretary Date Fund Name Accounting Unit Account Activity Amount Water 2013 RVBD 4093-041 550950 E15111-01-4093-EXP $4,500.00 St 2015 GO Bond 2014 3551-051 550950 E15111-01-3551-EXP 4,000.00 Total $8,500.00 • SCANNED Govind Development,LLC Engineering Division 9510 Leopard St DEVELOPMENT, LLC Corpus Christi,TX 78410 ENGINEERING DIVISION April 8, 2019 Jeff Edmonds, P.E. Director of Engineering Services City of Corpus Christi 1201 Leopard Street Corpus Christi,Texas 78401 RE: Amendment No.3 for Detail Design Engineering Services E15111-North Padre Island Beach Access Roads(3A and 2) (Bond 2014) Dear Mr. Edmonds, Govind Development, LLC (GDL) is pleased to provide our engineering fee proposal amending the base contract for North Padre Island Beach Access Roads (3A and 2) (E15111), to support the continued hurricane recovery efforts by providing our services for a detailed additional design, as requested by the City of Corpus Christi, Department of Engineering Services. Below is the scope of work based on discussion with City staff. Scope of Work The design work includes the additional services related to the following: (Zahn Road Beach Access): ➢ Revised Beginning of Project(BOP) to include the brick-pavers and curb and gutter at the end of the asphalt roadway approaches. Includes two separate existing roadways (approximately 300LF each) separated by a raised median approaching the swing-gate entrance to the beach access road. ➢ Additional survey for existing underground utilities within the extension (water, wastewater, gas and manholes), which have facilities within the requested extension. ➢ Additional CAD for the topography sheets, plan sheets, profile sheets, and striping sheets. ➢ Geotechnical analysis for pavement section on the extension. ➢ Permit exhibit revisions(DPP& BCC). (Beach Access Road 3A): ➢ Meetings and design for new beachfront waterline (approximately 1,075LF) connecting to existing waterline at Access Road 3A(by request). AMEND. NO. 3 Exhibit "A" Page 1 of 3 CONFIDENTIALITY NOTICE-This document is the property of Govind Development,LLC and contains information that is highly confidential,proprietary and Attorney/Client Privileged,and which Govind Development considers trade secrets and has diligently protected as such.It is intended only for the specific purpose for which it was prepared and for disclosure only to the persons or entity to whom it is addressed.It may not be disclosed to other parties without the express written consent of Govind Development,LLC.The unauthorized disclosure of any information contained in the Proposal will cause Govind Development great and irreparable harm Project Contract Summary of Fees(to date): This proposal amends the base contract for the following amounts: Base Contract Total $73,935 (Access Roads 3A&2) Amendment No.1 Total $16,150 (Small f/Newport&Zahn Roads) Amendment No.2 Total $59,350 (Design f/Newport&Zahn Roads) Amendment No.3 Total $8,500 (Extension Zahn Road—Current Scope) Adjusted Total of contract: $157,935 If you have any questions, please contact me at(361) 241-2777 or Chale@govinddevelopment.com. Respectfully, Cj2.4 0 744 Chris Hale, P.E. Civil Section Manager Govind Development, LLC—Engineering Division AMEND. NO. 3 Exhibit "A" Page 2 of 3 CONFIDENTIALITY NOTICE-This document is the property of Govind Development,LLC and contains information that is highly confidential,proprietary and Attorney/Client Privileged,and which Govind Development considers trade secrets and has diligently protected as such.It is intended only for the specific purpose for which it was prepared and for disclosure only to the persons or entity to whom it is addressed.It may not be disclosed to other parties without the express written consent of Govind Development,LLC.The unauthorized disclosure of any information contained in the Proposal will cause Govind Development great and Irreparable harm North Padre Island Beach Access Road 3A and 2 (Project No. E15111) Amend. No. 2 Original Amend. No. 1 Part A Part B Zahn Amend. No. 3 Total Newport Pass Road Total Road Basic Services 1 Preliminary Phase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 Design Phase 66,135.00 16,150.00 20,500.00 14,000.00 34,500.00 3,500.00 120,285.00 3 Bid Phase 2,750.00 0.00 2,000.00 2,000.00 4,000.00 0.00 6,750.00 4 Construction Phase 1,250.00 0.00 2,450.00 1,250.00 3,700.00 0.00 4,950.00 - Subtotal Basic Services 70,135.00 16,150.00 24,950.00 17,250.00 42,200.00 3,500.00 131,985.00 Additional Services 1 Permit Preparation 1,800.00 0.00 4,750.00 2,000.00 6,750.00 1,000.00 9,550.00 2 ROW Acquisition 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Survey 3 Topographic Survey 0.00 0.00 5,250.00 4,000.00 9,250.00 2,500.00 11,750.00 and Parcel Descriptions 4 Environmenatl Issues 0.00 0.00 0.00 0.00 0.00 500.00 500.00 5 Public Involvement 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 Subsurace Utility 0.00 0.00 0.00 0.00 0.00 500.00 500.00 Investigation Construction 7 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Observation Services 8 Warranty Phase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9 Franchise Utility 0.00 0.00 0.00 0.00 0.00 500.00 500.00 Coordination Hydraulic and 10 Hydrologic Modelding 1,000.00 0.00 0.00 0.00 0.00 0.00 1,000.00 and Analysis 11 Traffic Control Planning 1,000.00 0.00 750.00 400.00 1,150.00 0.00 2,150.00 and Design Subtotal Additional Services 3,800.00 0.00 10,750.00 6,400.00 17,150.00 5,000.00 25,950.00 Total 73,935.00 16,150.00 35,700.00 23,650.00 59,350.00 8,500.00 157,935.00 D 05/31/16 05/04/17 11/13/18 _//19 c- m m M2016-056 Admin Approval M2018-215 Admin Approval go(D& . w ..: z o. nO w .. w