AMENDMENT NO. 2 to the
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City")and LNV, Inc.(`Consultant"),
agree to the following amendments to the Contract for Professional Services for Elevated Water Storage Tanks
Citywide Alternative Capacity Requirement(ACR) Implementation, Phase 3 (Project No. E16290):
Original Contract _ September 27, 2016 Motion No. M2016-126 1 $672,034.00
Amendment No. 1 April 11, 2017 Administrative Approval I $18,500.00
In the Original Contract, Exhibit A, Section I. Scope of Services shall be amended as set forth in the attached
Amendment No.2, Exhibit A.
In the Original Contract, Section III. Fees shall be amended based on the modified scope of services in the attached
Amendment No.2, Exhibit A fora fee not to exceed$39,515.00,for a total restated fee not to exceed$730,049.00.
All other terms and conditions of the September 27,2016 Contract for Professional Services between the City and
Consultant, and of any amendments to that contract,which are not specifically addressed herein shall remain in full
force and effect.
CITY OF CORPUS CHRISTI LNV, INC.
.21/. /9 &Leyep,E. 57-V1
ter Zano Date or
City Manager President
801 Navigation, Suite 300
Corpus Christi, TX 78408
(361) 883-1984 Office
(361) 883-1986 Fax
loganb@Invinc.com
RECOMMENDED
Mark Van Vleck D- e
•ssi - ' I-na•er
•
• 4-, 24) /SI.
Jeff H. Edmonds, P.E. '-te
Director of Engineering Services Accounting Unit 4098-041
Account 550950
APPROVED AS TO LEGAL FORM Activity E16290-01-4096-EXP
/1y =2,' 2019.06.05 Account Category 50950
Fund Name Water 2019 CIP
08:14:41 -05'00' Amount $35,515
Assistant City Attorney Date
ATTEST
�, . eLe% HT/UV/6N (/ tit
l
Ci Secretary Date
AMENDMENT NO. 2
Page 1 of 1
SCANNED
LNV
Solutions Today with a
engineers I architects contractors Vision for Tomorrow
May 9, 2019
Mr. Jeff Edmonds, P.E.
Director of Capital Programs
City of Corpus Christi
P.O. Box 9277
Corpus Christi, Texas 78469-9277
RE: AMENDMENT NO. 2 TO PROFESSIONAL SERVICES CONTRACT
Elevated Water Storage Tanks Citywide (ACR Implementation)
City Project E16290
Mr. Edmonds:
In response to the City's request, we are proposing Amendment No. 2 in the amount of $39,515 to
provide additional services for the Elevated Water Storage Tanks - Citywide (ACR Implementation)
project (E16290) for a total re-stated project fee of$730,049.
PROJECT BACKGROUND
Original Contract
On October 13, 2016, LNV received formal Notice to Proceed (NTP) for project E1690 — Elevated
Water Storage Tanks Citywide (Alternative Capacity Requirement Implementatlen.) The project
consists of providing the City with a 2.5 million gallon (MG) elevated storage tank (EST) at Starry
Road and a 1.25 MG EST at Nueces Bay Blvd., as outlined in the Alternative Capacity Requirement
(ACR) Implementation Plan. This project also includes the demolition of the four (4) existing ESTs in
the City's Pressure Zone 1, which are identified as Morgan EST, Gollihar EST, Alameda EST, and
Flour Bluff EST. The original contract amount for the Basic and Additional Services associated with
this project is $672,034.
Amendment No. 1
On April 18, 2017, LNV received formal Notice to Proceed (NTP) for Amendment No.1 to provide
the City with modeling assistance in which the Flour Bluff area receives water from the mainland.
The water modeling support provided for this task consisted of evaluating if adequate redundancy
exists with respect to water delivery to the Flour Bluff area, improvements that would improve water
quality in the Flour Bluff area, and the appropriate location for Starry EST with respect to
pressures/water quality. This modeling support assisted the City in implementing waterline
improvements needed along Yorktown Blvd. and Flour Bluff Drive, in addition to, the relocation of
Page 1 of 5
801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408
OFFICE 361.883.1984 I FAX 361.883.1986 I WWW.LNVINC.COM
EXHIBIT A
Page 1 of 5
the new 2.5 MG EST from Starry Road to Division Road to improve pressures and overall water
quality in the Flour Bluff area.
PURPOSE OF AMENDMENT NO. 2
The purpose of Amendment No. 2 is to include the demolition of the 12.5MG Holly Ground Storage
Tank (GST) and the installation of generators at the two (2) new ESTs into the scope of work of this
project. Due to the demolition of the City's four(4) existing ESTs being included in the scope of this
project which will require a contractor who specializes in demolition, it is recommended for the City
to include the demolition of the Holly 12.5MG GST in this scope of work since it has been
decommissioned and is no longer in use in the City's water distribution system. In addition, it is also
recommended to add generators into the scope of work of this project at both new EST locations to
provide backup power at each EST if a power interruption ever occurs. The backup power will
provide the City the ability to control the ESTs during a power outage, which is vital source to
operations for alleviating surge and sustaining adequate pressures in the system.
The scope of work specified herein is based on the following assumptions:
• Demolition of the Holly 12.5MG GST will include only the removal of the GST and utilities to
a depth of 3 feet below grade at the location of the GST. All utilities routed to the GST will be
abandoned in place and capped off at the limits of the demolition.
• Holly 12.5MG GST lead and asbestos contamination will be confirmed to exist and/or not
exist during the design phase either by original construction records review or by material
testing.
• The City will provide all required coordination with TCEQ required for decommissioning of
the Holly GST; however, an additional proposal can be provided if it is preferred for the
Engineer to provide TCEQ coordination.
• Generators to be included will have the capacity to supply power for running electrical
loadings being designed for at the two (2) EST sites to include lighting, security system,
instrumentation, IT equipment, and Police communication equipment.
• Generators will be diesel engine driven with auto transfer on power failure.
• Diesel fuel storage capacity on site will be for 48-hours full operation run time.
• Generators will be mounted to a concrete slab and provided with a weather proof enclosure
that will provide adequate exhaust ventilation.
• Generators will be designed to be located outside of each EST on a concrete slab on grade
separate from the EST foundation.
SCOPE OF WORK
BASIC SERVICES
Preliminary Phase
• Request and review available reports, record drawings, utility maps and other information
provided by the City pertaining to the Holly GST project area.
Page 2 of 5
801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408
OFFICE 361.883.1984 I FAX 361.883.1986 I WWW.LNVINC.COM
EXHIBIT A
Page 2 of 5
• Conduct up to one (1) meeting (up to 2-hour duration)with City Staff to prepare/finalize user
requirement detail (in accordance to the assumptions described above)for the generators
being added at each EST site.
• Incorporate into schedule the addition of the 12.5MG Holly GST demolition and generators
being added at each EST site based on the pertinent design scope of work.
• Incorporate opinion of probable construction costs for the addition of the 12.5MG Holly GST
demolition and generators being added at each EST site based on the pertinent design
scope of work.
• Incorporate the engineering design basis into the Engineering Letter Report for the addition
of the 12.5MG Holly GST demolition and generators being added at each EST site including
pertinent factors, preliminary layout sketches, construction sequencing, and any other factors
required for the design.
Design Phase
• Provide demolition plan/detail sheets (two (2) plan sheets anticipated)for the 12.5MG Holly
GST demolition that will be incorporated into the 60%, 90%, and final plan set submittal.
• Provide concrete slab on grade details (two (2) plan sheets anticipated)for the generator to
be installed at each site that will be incorporated into the 60%, 90%, and final plan set
submittal.
• Provide electrical details (two (2) plan sheets anticipated)for the all electrical, controls, and
instrumentation required for the connection of the generators at each site. These details will
be incorporated into the 60%, 90%, and final plan set submittal.
• Prepare and incorporate the technical specifications required for the 12.5MG Holly GST
demolition and generators being added at each EST site.
Construction Administration Phase
• Additional time anticipated during the construction phase to provide engineering services for
completing the following tasks:
➢ Review Contractor submittals and coordinate Contractor submittal review with
subconsultants related to the 12.5MG Holly demolition and installation of generators
at each EST site.
> Review Contractor provided construction "red-line" drawings and prepare project
record drawings for the 12.5MG Holly demolition and installation of generators at
each EST site.
ADDITIONAL SERVICES
Environmental Issues
• Perform an asbestos and lead survey of the 12.5MG Holly GST to include sample collection
and analysis for determining if asbestos or lead exists and mitigation required for removing
any hazardous materials found.
Page 3 of 5
801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408
OFFICE 361.883.1984 I FAX 361.883.1986 I WWW.LNVINC.COM
EXHIBIT A
Page 3 of 5
SCHEDULE
The schedule provided below considers the work under Amendment No. 2 of this contract, in
addition to, the additional time needed from the original contract due to delays in land acquisition
and the investigation/relocation of ESTs than what was originally planned for. The schedule below
provides the duration for the remaining milestones for this project.
Date Activity
TBD NTP of Amendment 2
30 days after NTP of AMD 2 Final PER submittal
95 days after NTP of AMD 2 60% Design Submittal
125 days after NTP of AMD 2 City Review
185 days after NTP of AMD 2 90% Pre-Final Design Submittal
215 days after NTP of AMD 2 City Review
245 days after NTP of AMD 2 TCEQ Review Submittal
320 days after NTP of AMD 2 Final Submittal
430 days after NTP of AMD 2 Contract Award
445 days after NTP of AMD 2 Begin Construction
1130 days after NTP of AMD 2 Complete Construction
FEES
A. Fees for Basic Services: The City will pay the ENGINEER for providing all "Basic Services"
except for the Construction Administration Phase authorized as shown in "ATTACHMENT 1".
The services for the Construction Administration Phase as specified in the original contract
and Amendment 2 will be provided on a Time and Material (T&M) basis as the project is
moved towards completion. The fees will be full and total compensation for services and for
all expenses incurred in performing these services.
B. Fees for Authorized Additional Services. The City will pay the ENGINEER the not-to-
exceed fee shown in "ATTACHMENT 1" for services specified in this amendment. The fee
will be full and total compensation for services and for all expenses incurred in performing
these services.
C. Summary of fees. Refer to ATTACHMENT 1.
If you have any questions or if you would like to discuss in more detail, please feel free to call me at
361-883-1984.
Since ely,
7
Logan Burton, P.E.
PrincipalNice President
LNV, Inc.
TBPE Firm No. F-366
Page 4 of 5
801 NAVIGATION I SUITE 300 I CORPUS CHRISTI,TEXAS 78408
OFFICE 361.883.1984 I FAX 361 883.386 I WWW.LNVINC.COM
EXHIBIT A
Page 4 of 5
ATTACHMENT 1 - SUMMARY FEE TABLE
TASK ORIGINAL AMENDMENT 1 AMENDMENT 2 TOTAL
CONTRACT
BASIC SERVICES
1. Preliminary Phase $136,795 $0 $6,880.00 $143,675
2. Design Phase $286,925 $0 $24,540.00 $311,465
3. Bid Phase $11,378 $0 $0.00 $11,378
4. Construction Administration Phase $118,992 $0 $4,395.00 $123,387
Subtotal Basic Services $554,090 $0 $35,815 $589,905
ADDITIONAL SERVICES(ALLOWANCE)
1. Permit Preparation $7,280 $0 $0 $7,280
2. ROW Acquisition Survey $14,340 $0 $0 $14,340
3. Topographic Survey and Parcel Descriptions $14,270 $0 $0 $14,270
4. Environmental Issues $27,692 $0 $ 3,700.00 $31,392
5. Public Involvement $0 $0 $0 $0
6. Subsurface Utility Investigation $0 $0 $0 $0
7. Construction Observation Services $0 $0 $0 $0
8. Warranty Phase $6,983 $0 $0 $6,983
9. Start-Up Services $13,096 $0 $0 $13,096
10. Provide SCADA Documentation $5,880 $0 _ $0 $5,880
11. Project Manual $0 $0 $0 $0
12. O&M Manuals and Training $6,595 $0 $0 $6,595
13. Process Automation System Development $21,808 $0 $0 $21,808
14. Water Modeling $0 $18,500 $0 $18,500
Subtotal Additional Services $117,944 $18,500 $3,700 $140,144
IIm
ca tto = TOTAL FEE $672,034 $18,500 $39,515 $730,049
wW
O :I
cn a
Page 5 of 5
801 NAVIGATION I SUITE 300 i CORPUS CHRISTI,TEXAS 78408
OFFICE 361.883.1984 I FAX 361.883.1986 I WWW.LNVINC.COM
Sample form for:
Payment Request
COMPLETE PROJECT NAME AE Contract
Project No. XXXX Revised 02/01/17
Invoice No. 12345
Invoice Date 01/01/2017
Total Current Previous Total Remaining Percent .
Basic Services: Contract Amd No. 1 Amd No. 2 Contract Invoice Invoice Invoice Balance Complete
Preliminary Phase $1,000.00 $0.00 $0.00 $1,000.00 $0.00 $1,000.00 $1,000.00 $0.00 100.0%
Design Phase $2,000.00 $1,000.00 $0.00 $3,000.00 $1,000.00 $500.00 $1,500.00 $1,500.00 50.0%
Bid Phase $500.00 $0.00 $250.00 $750.00 $0.00 $0.00 $0.00 $750.00 0.0%
Construction Phase $2,500.00 $0.00 $1,000.00 $3,500.00 $0.00 $0.00 $0.00 $3,500.00 0.0%
Subtotal Basic Services $6,000.00 $1,000.00 $1,250.00 $8,250.00 $1,000.00 $1,500.00 $2,500.00 $5,750.00 30.3%
Additional Services:
Permitting $2,000.00 $0.00 $0.00 $2,000.00 $500.00 $0.00 $500.00 $1,500.00 25.0%
Warranty Phase $0.00 $1,120.00 $0.00 $1,120.00 $0.00 $0.00 $0.00 $1,120.00 0.0%
Inspection $0.00 $0.00 $1,627.00 $1,627.00 $0.00 $0.00 $0.00 $1,627.00 0.0%
Platting Survey TBD TBD TBD TBD TBD TBD TBD TBD TBD
0 & M Manuals TBD TBD TBD TBD TBD TBD TBD TBD TBD
SCADA TBD TBD TBD TBD TBD TBD TBD TBD TBD
Subtotal Additional Services $2,000.00 $1,120.00 $1,627.00 $4,747.00 $500.00 $0.00 $500.00 $4,247.00 10.5%
Summary of Fees:
Basic Services Fees $6,000.00 $1,000.00 $1,250.00 $8,250.00 $1,000.00 $1,500.00 $2,500.00 $5,750.00 30.3%
Additional Services Fees $2,000.00 $1,120.00 $1,627.00 $4,747.00 $500.00 $0.00 $500.00 $4,247.00 10.5%
Total of Fees $8,000.00 $2,120.00 $2,877.00 $12,997.00 $1,500.00 $1,500.00 $3,000.00 $9,997.00 23.1%
Notes:
If needed, update this sample form based on the contract requirements.
If applicable, refer to the contract for information on what to include with time and materials (T&M).
c me
I Q -a
o m m
2
0
C)
m