Loading...
HomeMy WebLinkAboutC2019-422 - 7/8/2019 - NA CITY OF CORPUS CHRISTI AMENDMENT NO. 8 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi, Texas, hereinafter called "CITY, and Freese and Nichols, Inc. hereinafter called "ENGINEER," agree to the following amendment to the Contract for Professional Services for South Staples Street from Brawner Parkway to Kostorvz Road(Bond 2012) (Project No. E12095) as authorized and administratively amended by: Original Contract January 29, 2013 Motion No. M2013-017 $731,030.00 Amendment No. 1 July 11, 2014 Administrative Approval $49,537.00 Amendment No. 2 January 23, 2015 Administrative Approval $39,154.00 Amendment No. 3 April 25, 2016 Administrative Approval $37,454.00 Amendment No. 4 October 13, 2016 Administrative Approval $49,883.00 Amendment No. 5 November 28, 2017 Administrative Approval $42,769.00 Amendment No. 6 March 23, 2018 Administrative Approval $49,951.00 Amendment No. 7 April 11, 2018 Administrative Approval $14,887.00 In the Original Contract, Exhibit "A", Section I. Scope of Services shall be amended as set forth in the attached Amendment No. 8, Exhibit"A". In the Original Contract, Exhibit "A", Section III. Fees shall be amended based on the modified scope of services in the attached Amendment No. 8, Exhibit "A" for a fee not to exceed $35,955, for a total restated fee not to exceed $1,050,620. All other terms and conditions of the January 29, 2013 contract between the "CITY" and "ENGINEER" and of any amendments to that contract which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPUS CHRISTI FREE E AND NICHOLS, INC. e/Qn /5- ' (D•30 •‘S Mark Van Vleck, 3. e Ron zman, P.E. Date Assistant Cis • ana• 4' Vice President/Principal 800 N. Shoreline Blvd., Suite 1600N Corpus Christi,Texas 78401 _�� 7 . / (361) 561-6500 Office eff H. Edmonds, P.E. Sate (361) 561-6501 Fax Director of Engineering Services rg@freese.com APPROVED AS TO LEGAL FORM 9(A) 2019.07.01 15:24:56 -05'00' Legal Department Date AMEND. NO. 8 Page 1 of 2 SCANNED ATTEST . ,`e,l‘Weea%. t- 4.,,k7 Rebecca Huerta, City Secretary South Staples Street from Brawner Parkway to Kostoryz Rd (Project No. E12095) Freese and Nichols Amendment No. 8, $35,955 Not to Exceed $1,050,620 Fund Name Accounting Account Activity No. Account Amount Unit No. Category Street 2016 CO Bond 2012 3552-051 550950 E12095-01-3552-EXP 50950 $35,955.00 Total $35,955.00 AMEND. NO. 8 Page 2 of 2 rilIFREESE Innovative approaches NICHOLS Practical results Outstanding service 800 N.Shoreline Blvd.,Suite 1600N • Corpus Christi,Texas 78401 • 361-561-6500 • fax 361-561-6501 www.freese.com June 13, 2019 Mr.Jeff Edmonds, P.E. Director of Engineering Services City of Corpus Christi P.0. Box 9277 Corpus Christi,Texas 78469-9277 Re: South Staples Street from Brawner Parkway to Kostoryz Road (Bond 2012) City Project No. E12095-Amendment#8 Dear Mr. Edmonds, At the request of your staff, Freese and Nichols, Inc. is pleased to submit our contract amendment#8 for your consideration. Please note that this amendment provides for additional tasks completed for the Construction Phase on the Staples Street project. The additional Construction Phase activities in this proposal have been necessary due to additional traffic control design, utility conflicts encountered during construction, requested efforts to design additional utilities, review RFI's,and participating in additional meetings. Construction phase services were previously deleted by Amendment#4 to support the redesign effort requested by the City. Amendment#6 partially restored the deleted construction phase services. This amendment will include the following: A. Basic Services: 1. Additional Construction Administration Phase • Prepare revised traffic control drawings for Phase 1 of the project between Texan Trail and Brawner Parkway. Meet with the City and contractor to discuss options. • Provide additional meetings and design support for the lowering of an AEP duct bank and City gas line in conflict with the proposed 54" storm water RCP. Participate in three (3) meetings with AEP and City to develop options and alternatives for lowering the utility lines. Prepare drawings and exhibits depicting the locations of existing and proposed improvements. • Provide additional coordination and design review for the relocation of AEP and AT&T owned utility poles throughout the project. Prepare exhibits for AT&T to lower an existing duct bank at the intersection of Texan Trail crossing Staples Street. • Review additional submittals and RFI's related to property owner inquiries and substitution requests by the contractor. • Participate in six(6) additional meetings and six(6) additional site visits with the City and contractor to support the construction phase. AMEND. NO. 8 EXHIBIT "A" Page 1 of 2 Summary of Fees 1 Construction Administration Phase $35,955.00 TOTAL $35,955.00 Freese and Nichols, Inc. respectfully requests a lump sum contract amendment in the amount of $35,955.00 to address the aforementioned items. Please feel free to contact me at 361.561.6500 should you have any questions regarding this matter. Respectfull , T2 ' Iv'' Ron Guzman, P.E. Principal/Vice President AMEND. NO. 8 EXHIBIT"A" Page 2 of 2 South Staples Street from Brawner Parkway to Kostoryz Road (Bond 2012) Project No. E12095 SUMMARY OF FEES Original Contract Street Wastewater Storm Water Water Gas MIS Total Basic Services Fees 1 Preliminary Phase $32,813.10 $3,611.71 $16,734.62 $4,267.85 $325.17 $313.56 $58,066.00 2 Design Phase 142,612.59 15,697.23 72,732.17 18,548.97 1,413.26 1,362.78 252,367.00 3 Bid Phase 6,986.33 768.98 3,563.02 908.68 69.23 66.76 12,363.00 4 Construction Administration Phase 35,140.74 3,867.91 17,921.72 4,570.60 348.24 335.80 62,185.00 Subtotal Basic Services Fees 217,552.76 23,945.82 110,951.52 28,296.10 2,155.89 2,078.90 384,981.00 Additional Services Fees(Allowance) 1 Permitting 14,131.46 1,555.44 7,207.02 1,838.01 140.04 135.04 25,007.00 . 2 ROW Acquisition Survey 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3 Topographic Survey 39,366.56 4,333.04 20,076.88 5,120.23 390.11 376.18 69,663.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5A Public Meetings 14,056.86 1,547.23 7,168.98 1,828.31 139.30 134.33 24,875.00 . 5B Additional Public Outreach 20,871.97 2,297.36 10,644.67 2,714.72 206.84 199.45 36,935.00 6 Subsurface Utility Investigation 39,205.51 4,315.31 19,994.74 5,099.28 388.52 374.64 69,378.00 7 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 Warranty Phase 3,107.48 342.04 1,584.81 404.18 30.79 29.69 5,499.00 9 Signalization Improvements 33,239.75 3,658.67 16,952.21 4,323.34 329.40 317.63 58,821.00 10 Traffic Control 31,572.70 3,475.18 16,102.02 4,106.52 312.88 301.70 55,871.00 Subtotal Additional Services Fees Authc 195,552.29 21,524.25 99,731.32 25,434.60 1,937.87 1,868.66 346,049.00 Total Authorized Fee $413,105.05 $45,470.07 $210,682.85 $53,730.71 $4,093.77 $3,947.56 $731,030.00 01/29/13 Motion No. M2013-017 mX3 = Z mEdv o � z � � o South Staples Street from Brawner Parkway to Kostoryz Road (Bond 2012) Project No. E12095 SUMMARY OF FEES Amendment No. 1 Amd. No. 2 Amd. No. 3 Amd. No.4 Street Storm Water Total Street Street Street Basic Services Fees 1 Preliminary Phase $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 2 Design Phase 0.00 0.00 0.00 39,154.00 37,454.00 140,783.00 . 3 Bid Phase 0.00 0.00 0.00 0.00 0.00 (12,363.00) 4 Construction Administration Phase 0.00 0.00 0.00 0.00 0.00 (62,185.00) Subtotal Basic Services Fees 0.00 0.00 0.00 39,154.00 37,454.00 66,235.00 Additional Services Fees(Allowance) 1 Permitting 0.00 0.00 0.00 0.00 0.00 0.00 2 ROW Acquisition Survey 0.00 0.00 0.00 0.00 0.00 0.00 _ 3 Topographic Survey 0.00 0.00 0.00 0.00 0.00 (1,465.00) 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 0.00 5A Public Meetings 0.00 0.00 0.00 0.00 0.00 (9,388.00) . 5B Additional Public Outreach 0.00 0.00 0.00 0.00 0.00 0.00 6 Subsurface Utility Investigation 7,432.00 42,105.00 49,537.00 0.00 0.00 0.00 7 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 0.00 8 Warranty Phase 0.00 0.00 0.00 0.00 0.00 (5,499.00) 9 Signalization Improvements 0.00 0.00 0.00 0.00 0.00 0.00 10 Traffic Control 0.00 0.00 0.00 0.00 0.00 0.00 Subtotal Additional Services Fees Authc 7,432.00 42,105.00 49,537.00 0.00 0.00 (16,352.00) Total Authorized Fee $7,432.00 $42,105.00 $49,537.00 $39,154.00 $37,454.00 $49,883.00 07/11/14 01/23/15 04/25/16 10/13/16 Admin.Approval Ad. Approval Ad. Approval Ad. Approval A) X3 cD (12 = Z W D N o .. z � � O South Staples Street from Brawner Parkway to Kostoryz Road (Bond 2012) Project No. E12095 SUMMARY OF FEES Amd. No. 5 Amd. No. 6 Amd. No.7 Amd. No. 8 Street Wastewater Storm Water Water Gas Total Street Street Street Basic Services Fees 1 Preliminary Phase $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 2 Design Phase 0.00 7,107.00 0.00 0.00 16,007.00 23,114.00 0.00 0.00 0.00 3 Bid Phase 7,053.09 768.98 3,563.02 908.68 69.23 12,363.00 0.00_ 0.00 0.00 4 Construction Administration Phase 0.00 0.00 0.00 0.00 0.00 0.00 49,951.00 0.00 35,955.00 . Subtotal Basic Services Fees 7,053.09. 7,875.98 3,563.02 908.68 16,076.23 35,477.00 49,951.00 0.00 35,955.00 Additional Services Fees (Allowance) _ 1 Permitting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 ROW Acquisition Survey 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 . 3 Topographic Survey 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5A Public Meetings 0.00 0.00 0.00 0.00_ 0.00 0.00 0.00 9,388.00 0.00 5B Additional Public Outreach 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 Subsurface Utility Investigation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 Warranty Phase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,499.00 0.00 9 Signalization Improvements 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10 Traffic Control 7,292.00 0.00 0.00 0.00 0.00 7,292.00 0.00 0.00 0.00 Subtotal Additional Services Fees Authc 7,292.00 0.00 0.00 0.00 0.00 7,292.00 0.00 14,887.00 0.00 Total Authorized Fee $14,345.09 $7,875.98 $3,563.02 $908.68 $16,076.23 $42,769.00 $49,951.00 $14,887.00 $35,955.00 11/28/17 03/23/18 04/11/18 • Administrative Approval Ad. Approval Ad. Approval Ad. Approval ▪ x3 c,l ..74 o _ z � po0 - Co South Staples Street from Brawner Parkway to Kostoryz Road (Bond 2012) Project No. E12095 SUMMARY OF FEES Total Street Wastewater Storm Water Water Gas MIS Total Basic Services Fees 1 Preliminary Phase $32,813.10 $3,611.71 $16,734.62 $4,267.85 $325.17 $313.56 $58,066.00 2 Design Phase 360,003.59 22,804.23 72,732.17 18,548.97 17,420.26 1,362.78 492,872.00 _ 3 Bid Phase 1,676.42 1,537.96 7,126.04 1,817.36 138.46 66.76 12,363.00 4 Construction Administration Phase 58,861.74 3,867.91 17,921.72 4,570.60 348.24 335.80 85,906.00 Subtotal Basic Services Fees 453,354.85 31,821.80 114,514.54 29,204.78 18,232.12 2,078.90 649,207.00 Additional Services Fees (Allowance) 1 Permitting 14,131.46 1,555.44 7,207.02 1,838.01 140.04 135.04 25,007.00 2 ROW Acquisition Survey 0.00 0.00 0.00 0.00 0.00 0.00 0.00 . 3 Topographic Survey 37,901.56 4,333.04 20,076.88 5,120.23 390.11 376.18 68,198.00 4 Environmental Issues 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5A Public Meetings 14,056.86 1,547.23 7,168.98 1,828.31 139.30 134.33 24,875.00 5B Additional Public Outreach 20,871.97 2,297.36 10,644.67 2,714.72 206.84 199.45 36,935.00 6 Subsurface Utility Investigation 46,637.51 4,315.31 62,099.74 5,099.28 388.52 374.64 118,915.00 7 Construction Observation Services 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 Warranty Phase 3,107.48 342.04 1,584.81 404.18 30.79 29.69 5,499.00 9 Signalization Improvements 33,239.75 3,658.67 16,952.21 4,323.34 329.40 317.63 58,821.00 10 Traffic Control 38,864.70 3,475.18 16,102.02 4,106.52 312.88 301.70 63,163.00 Subtotal Additional Services Fees Authc 208,811.29 21,524.25 141,836.32 25,434.60 1,937.87 1,868.66 401,413.00 Total Authorized Fee $662,166.14 $53,346.05 $256,350.87 $54,639.39 $20,170.00 $3,947.56 $1,050,620.00 Isim � =Wvz A o .. z _ co