Loading...
HomeMy WebLinkAboutC2019-430 - 7/17/2019 - NA TASK ORDER NO. 45 This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and LNV, Inc. (Consultant) dated August 16, 2016 (Agreement). Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. PROJECT NAME/NUMBER: Water and Wastewater Treatment On-Call Support, E16264 1. PROJECT DESCRIPTION—This project provides the Utility Department with on-call services to assist with any technical, operational, maintenance, diagnostic and design concerns for the City's O.N.Stevens Water Treatment Plant and six wastewater treatment plants. 2. SCOPE OF SERVICES—ONSWTP Liquid Chlorine Piping Replacement Additional Construction Support, more fully described in Exhibit A. 3. COMPENSATION —The total amount not to exceed for Task Order No. 45 only is $18,480. This Task Order is approved, and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORP = IS I LNV, INC. 11Z14,1 7 (7 /y , , i,_�� 79//17 Jeff H. Edmonds, P.E. Da Dan . er, P.E. ate Director of Engineering Services Preside 801 Navigation, Suite 300 Corpus Christi. TX 78408 (361) 883-1984 Office loganb@Invinc.com Fund Name Accounting Unit Account No. Activity No. Amount Water Operating Fund 4010-31010-062 530000 E16264-01-4010-EXP $18,480.00 Task Order No. 45 Page 1 of 1 SCANNED City Project No. E16264 Professional Services Contract City of Corpus Christi Water/Wastewater Treatment On-Call Support Task Authorization No. 45 — ONSWTP Liquid Chlorine Piping Replacement Additional Construction Support June 19, 2019 U4if EXHIBIT A Page 1 of 3 • SCOPE OF WORK Project No. E16264 Water and Wastewater Treatment On-Call Support Task Authorization No. 45 - ONSWTP Liquid Chlorine Piping Replacement Additional Construction Support PURPOSE Under the scope of work for TA 26 and TA 40,the design and bid phase for the ONSWTP Liquid Chlorine Piping Replacement Project were completed.Initial construction phase involving planning and construction sequencing was also completed. The anticipated start date for construction of the ONSWTP Liquid Chlorine Piping Replacement project is June 24, 2019. In order to ensure successful completion of the critical project, the purpose of this task authorization is to provide additional effort for the Engineer to perform extensive construction observation services for the 30-day duration of construction. This is to assist with risk mitigation and verification of contractor's work and construction conformance with design plans and specifications. SCOPE OF WORK BASIC SERVICES: The Engineer will perform the following: Task 0003—Construction Phase 1. Perform sites visits for up to 30-days to assist with: • Observation of progress in construction/installation • Ensuring conformance of construction with design documents and construction plan • Risk Mitigation measures • Providing clarifications and additional information requested by contractor Note on Scope of Work:The scope of this task authorization is limited to performing one (1)site visit per day for the 30-day duration of construction. Each site visit is anticipated to be for up to 4 hours. DELIVERABLES—N/A SCHEDULE The Engineer's services shall be performed in a timely manner consistent with sound professional practices. The Engineer will complete the work according to the following schedule: Activity Completion Date Contract Execution-Notice to Proceed(NTP) TBD Task 0003—Construction Phase TBD based on Contractor's Schedule 1 EXHIBIT A Page 2 of 3 The time limits set forth in the schedule shall include allowances for reasonable and expected review time by the City and approval by authorities having jurisdiction over this project and shall not be allowed as cause for delay or adjustments to the schedule. Delays caused by review times by the City exceeding those anticipated by the Engineer's schedule are cause for adjustments in the schedule. Any adjustments made to the agreed upon schedule shall be made in writing and accepted by both parties. The Engineer shall begin work immediately upon receipt of the executed Task Authorization and/or Notice to Proceed(written or emailed). FEE The task authorization will be billed on a Time and Materials(T&M)basis as the project is moved towards completion. The anticipated amount for this task authorization is $18,480.00.The Engineer will not incur cost in excess of this not-to-exceed the amount without prior written authorization from City. The detailed fee analysis for this task authorization is provided in Attachment A. TASK AUTHORIZATION MANAGER The Task Authorization Manager will be the primary contact person during the performance of this work. All correspondence or inquiries should be addressed to the Task Authorization Manager. This work task will be coordinated by: Pablo Martinez,P.E.,C.P.M Project Manager Engineering Department City of Corpus Christi Office: 361-826-1929 Email: PabloMl@cctexas.com 2 EXHIBIT A Page 3 of 3