Loading...
HomeMy WebLinkAboutC2019-475 - 8/20/2019 - NA TASK ORDER NO.2 This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and •.JA Engineering' (Consultant) dated June 19, 2018 (Agreement). Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as It pertains to the project described below. PROJECT NAME/NUMBER:18100A-Citywide Storm Water Infrastructure Rehabilitation 1. PROJECT DESCRIPTION The project scope includes the development and implementation of a City-wide Storm water infrastructure rehabilitation and replacement program. 2. SCOPE OF SERVICES The scope of services includes an investigation and drainage study to determine the cause for flooding issues at the intersection of Glen Oak and Flour Bluff Drive as well as the outfall location. Adjacent subdivisions will also be analyzed. This task order is more fully described in Exhibit A. 3. COMPENSATION The total amount not to exceed for Task Order No. 2 only is$33,375. This Task Order is approved and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF C / WA ENGINEERING • J>ff H.Edmon•s, P. E. w ate / e .• P. E. Date Director of Engineering Services Vice President 5350 S.Staples Street, Suite 425 Corpus Christi,D(78411 (361)991-8550 Office jcoym@lja.com TASK ORDER NO.2 Fund Name Accounting Account Activity No. Amount Unit No. SW 2012B RVBD 3495-043 550950 18100A-01-3495-EXP $33,375.00 Total $33,375.00 SCANNED 114 5656 S Staples Street.Suite 230,Corpus Christi,Texas 78411 LJA ENGINEERING t 361.991.8550 f 361.993.7569 LJA,com TBPE F-1386 TBPLS 10104001 August 15, 2019 FEE PROPOSAL Jeff Edmonds, PE Director of Engineering Services City of Corpus Christi PO Box 9277 Corpus Christi, Texas 78469-9277 Re: Proposal for Task Order#2 — Glen Oak/Flour Bluff Drive Intersection and Outfall Drainage Study Citywide Storm Water Infrastructure Rehabilitation/Replacement Master Service Agreement (MSA) City Project No. 18100A Dear Mr. Edmonds: LJA Engineering, Inc. (LJA) is pleased to provide this proposal for investigation and preparation of a drainage study for the referenced project. The following is the scope of services we anticipate will be required. SCOPE OF SERVICES: For Task Order#2 LJA will conduct an investigation and prepare a drainage study to determine the cause for flooding issues at the intersection of Glen Oak and Flour Bluff Drive as well as the outfall location. Additionally, adjacent subdivision collection systems will be analyzed. Recommendations for possible solutions to remedy these recurring flooding issues will also be included. The City's 2009 Storm Water Draft Master Plan will be reviewed and analyzed as required. We intend to perform the following tasks to achieve the scope mentioned above: 100 Project Kickoff Meeting with City Staff and Internal Project Coordination 200 Field Investigation to Gather Necessary Elevations of Existing Drainage Facilities 300 Review of Existing Record Drawings 400 Preparation of Draft Drainage Study Report with Findings, Suggested Improvements and Opinions of Probable Construction Costs. 500 Address City Comments and Prepare Final Drainage Study Report ITEMS TO BE PROVIDED BY THE CITY: • Existing Record Drawings of Drainage Facilities, Subdivisions and Street Project in the Subject Area • Records of Flooding Incidents Submitted to the City in the Subject Area R\BP'S-OPPORTUNITIES IENGINEERING)12019118-01195-T02-City of CC Task order No 2-Glen Oak_Fiour Bluff Dr intersection& DrC 1eyrirdf:oA letter oocx Letter Doc>, Page 1 of 2 Mr. Jeff Edmonds, PE August 15, 2019 Page 1 of 2 SCHEDULE: Notice to ProceedTBD Project Kick Off Meeting r — 1 Week After NTP Field Investigation and Data Gathering 2 Weeks After NTP Deliver Draft Drainage Study Report and Recommendations 5 Weeks After NTP City Staff Review and Comments 2 Weeks After Draft Submittal Deliver Final Drainage Study Report and Recommendations 2 Weeks After Receiving City Comments FEE ANALYSIS: We propose to provide these services for a fixed fee of $33,375.00 and as summarized in the Table below. DESCRIPTION NOT TO EXCEED AMOUNT Maximum Contract Per Initial MSA Contract $500,000.00 Task Order No. 1 $46,645.00 Task Order No. 2 $33,375.00 Remaining MSA Contract Amount $419,980.00 If this proposal meets with your approval, your signature below will be sufficient authorization to commence the work. We appreciate the opportunity to submit this proposal and look forward to working with you on completion of this project. If you have any questions. please feel free to contact me at any time at 361.991.8550 or by email at Icoym(a lja.com. Sincerely Accepted By: CITY OF CORPUS CHRISTI `� , d . 14A Jeff Coym, PE By: Vice President, Corpus Christi Name: Title: Date: R\BP'S-OPPORTUNITIES(ENGINEERING)\2019118-01195-TO2-City al CC Task Order No 2-Glen Oak_Flour Buff Dr Intersection&Outlaw E ItBJ pAI Letter tlocx Letter Ooc, Page 2 of 2