AMENDMENT NO. 2
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi, Texas, a Texas home-rule municipal corporation ("City") and LJA Engineering
("Consultant"), agree to the following amendments to the Contract for Professional Services for Laguna Shores
Road from Hustlin' Hornet Drive to Caribbean Drive(Project No. 18024A):
Original Contract July 17, 2018 Administrative Approval $49,900.00
Amendment No. 1 August 21, 2018 Motion No. M2018-140 $702,125.00
In the Original Contract, Exhibit"A", Section I. Scope of Services shall be amended as set forth in the attached
Amendment No. 2, Exhibit"A".
In the Original Contract, Exhibit"A", Section III.Fees shall be amended based on the modified scope of services in
the attached Amendment No.2, Exhibit"A"for a fee not to exceed$36,530.00,for a total restated fee not to exceed
$788,555.00.
All other terms and conditions of the July 17, 2018 Contract for Professional Services between the City and
Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full
force and effect.
CITY OF CORPUS CHRISTI LJA E GI RING
/741— T9- 1, tMO/
Mark Van Vleck, Cat J Co . Date
Assistant City MaVice President
5350 South Staples Street, Suite 425
Corpus Christi, TX 78411
(361) 991-8550 Office
Jeff H. Edmonds, P. E., D e jcoym@lja.com
Director of Engineering Services
APPROVED AS TO LEGAL FORM
2019.08.19 16:05:04
�A) -05'00'
Assistant City Attorney Date
A■ EST
• / a. ala/t 9
City Secretary Date
I
4
4 SCANNED
•
Laguna Shores Road from Hustlin' Hornet Drive to Caribbean Drive
Project No. 18024A
LJA Engineering
Amendment No. 2
$36,530.00
Fund Name Accounting Unit Account No. Activity No. Amount
ST 2019 Bond 2018 P1 3556-051 550950 18024-A-3556-EXP $36,530.00
Total $36,530.00
•
lA
5350 South Staples Street,Suite 425,Corpus Christi,Texas 78411
LJA ENGINEERING t 361.991.8550 LJA.com TBPE F-1386 TBPLS 10016600
August 8, 2019
AMENDMENT NO. 2
City of Corpus Christi
Engineering Services
P.O. Box 9277
Corpus Christi, Texas 78469-9277
Attn: Ms. Marisa Alaniz, E.I.T.
Project Manager
RE: Engineering Services Agreement Between
City of Corpus Christi and LJA Engineering, Inc.
Laguna Shores Rd. (Hustlin' Hornet to Caribbean Dr.) (Project No. 18024A)
Contract Amendment No. 2—Design Phase
LJA Proposal No. 18-02361-0O2 I LJA Project No. C007-18000
Dear Ms. Alaniz,
I. SCOPE OF WORK
We have prepared Contract Amendment No. 2 (CA2) to our Laguna Shores Rd (Hustlin' Hornet
to Caribbean Dr.)A/E Contract to cover additionally requested Design Phase engineering efforts
to:
Basic Services (2. Design Phase)
A. Prepare construction plans and specifications for expansion of the Beasley ditch box
culverts.
B. Prepare construction plans and specifications for expansion of the Van Galen ditch box
culverts.
It. CONTRACT CONDITIONS
LJA will perform the above-described work for the fees established below and shown in the
attached manhour analysis. Any engineering efforts requested outside of the stated scope of
work will require another amendment to the contract and additional fees.
III. BASIS OF COMPENSATION
LJA proposes to perform the above-described scope of work for a Lump Sum fee of$36,530.00
as shown on the attached "Summary of Fees" and described herein.
R.laP'S-OPPORTUNITIES(ENGINEERING)t2019116-02361-0O2-Laguna Shores Rd(Huston'Hornet to Carribbean Dr.-
Project No.18024A)118-02381-0O2(18024A Amendment No.2.docx AMD NO.2
EXHIBIT'A'
Page 1 of 2
•
Ms. Marisa Alaniz, E.I.T.
City of Corpus Christi
August 8, 2019
TASK FEE
BASIC SERVICES(2.Design Phase)
A. Prepare construction plans and specifications for expansion of the $15,445.00
Beasley ditch box culvert upgrades.
B. Prepare construction plans and specifications for expansion of the Van $21,085.00
Galen ditch box culvert upgrades.
TOTAL DESIGN PHASE AND AMENDMENT NO. 2 $36,530.00
IV. SCHEDULE OF PAYMENT
Invoices shall be prepared, submitted and paid on a monthly basis in accordance with the Original
Contract. Invoices will be based upon engineering efforts spent at the time of invoicing.
Contract Amendment No. 2 documents are attached. We appreciate the opportunity to provide
these engineering services to you. If you have any questions regarding this Contract Amendment,
or need any additional information, please do not hesitate to contact me at 361.991.8550.
Sincerely,
LJA Engineering, Inc.
,1 gAM
Jeffrey . Coym, PE Date
Vice President
JCC/pjk
Attachment
R:\BP'S-OPPORTUNMES(ENGINEERING)\2010118-02361-CO2-Laguna Shores Rd(Hustlin'Hornet to Caribbean Dr.- AMD N0.2
Project No.18024A)\18.02381-0O2(18
024A Amendment No.2.docx
EXHIBIT'A'
Page 2 of 2
Laguna Shores Road from Hustlin' Hornet Drive to Caibbean Drive
Project No. 18024A
Bond 2018
Summary of Fees
Original Amendment Amendment No. 2 Total
Contract No. 1
Basic Services
1 _Preliminary Phase $22,450.00 $45,550.00 $0.00 $68,000.00
2 _Design Phase 0.00 228,550.00 36,530.00 265,080.00
3 _Bid Phase 0.00 12,330.00 0.00 12,330.00
4 Construction Administration Phase 0.00 35,480.00 0.00 35,480.00
Subtotal Basic Services 22,450.00 321,910.00 36,530.00 380,890.00
Additional Services
1 Permitting
a. Survey for Wetlands and LSLS for 0.00 47,600.00 0.00 47,600.00
Segments 1, 2, 3
b. Wetland Delineation 5,000.00 17,400.00 0.00 22,400.00
c. Drafting and Engineering 0.00 19,440.00 0.00 19,440.00
d. USACE Individual Permit 0.00 22,500.00 0.00 22,500.00
e. TCEQ Alterantives Analysis 0.00 9,600.00 0.00 9,600.00
f. USFWS/TPWD Coordination 0.00 3,300.00 0.00 3,300.00
g. Mitigation Plan Development 0.00 100,000.00 0.00 100,000.00
1. Mitigation Plan 0.00 0.00 0.00 0.00
2. Endangered Species Review 0.00 0.00 0.00 0.00
3.Archaeological Issues Review 0.00 0.00 0.00 0.00
h. Texas General Land Office(TGLO) Lease 0.00 3,600.00 0.00 3,600.00
i. MPO Coordination 0.00 11,550.00 0.00 11,550.00
2 ROW Acquisition Survey 0.00 0.00 0.00 0.00
3 Topographic Survey 22,450.00 50,000.00 0.00 72,450.00
4 Environmental Issues 0.00 0.00 0.00 0.00
5 H&H Analysis 0.00 28,130.00 0.00 28,130.00
6 Drainage Crossing Design 0.00 0.00 0.00 0.00
7 Public Meetings 0.00 7,500.00 0.00 7,500.00
8 Traffic Control 0.00 39,335.00 0.00 39,335.00
9 Warranty Phase 0.00 2,760.00 0.00 2,760.00
10 Record Drawings 0.00 17,500.00 0.00 17,500.00
Subtotal Additional Services 27,450.00 380,215.00 0.00 407,665.00
Total Authorized Fee $49,900.00 $702,125.00 $36,530.00 $788,555.00
07/17/18 08/21/18
Admin. Approval M2018-140 Admin. Appproval
AMEND. NO. 2
Exhibit"B"
Page 1 of 1