5. ,_" CITY OF CORPUS CHRISTI
vK AMENDMENT NO. 1 to the
CONTRACT FOR PROFESSIONAL SERVICES
,an..
1 io52
The City of Corpus Christi, Texas, hereinafter called "CITY," and FREESE AND NICHOLS, INC.,
hereinafter called "CONSULTANT," agree to the following amendment to the Contract for Professional
Services Area Development Plans - Southside and London Planning Districts & Area
Development Plans - Westside Planning District (Project Nos. El 7119 & E17120)) as authorized
and administratively amended by:
Original Contract September 18, 2018 Motion No. M2018-169 $300,000.00
IN THE ORIGINAL CONTRACT, EXHIBIT A, SCOPE OF SERVICES, shall be modified as shown in
the attached Exhibit A.
IN THE ORIGINAL CONTRACT, COMPENSATION shall be modified as shown in the attached Exhibit
A for an additional fee not to exceed $25,000.00 for a total restated fee not to exceed $325,000.00.
All other terms and conditions of the September 18, 2018 contract between the "CITY" and
"CONSULTANT" and of any amendments to that contract which are not specifically addressed herein
shall remain in full force and effect.
CITY OF CORPUS CHRISTI FREESE AND NICHOLS, INC.
.t,r,.. e_ 3att,t, a . 13 , 19 _ 9/10/2019
Kim Baker Date R n Guzman, P.E. Date
Director of Contracts and Procurement 800 N. Shoreline, Suite 1600N
Corpus Christi, Texas 78401
(361) 561-6500 Office
rg@freese.com
APPROVED AS TO FORM
Aimee Alcorn-Reed
•-( 15"j2019.09.11 15:24:12
-05'00'
Legal Department Date
Fund Name Accounting Unit . Account No. Activity No. Amount
General Fund 1020-11455-071 530000 E17119-01-1020-EXP $15,000.00
General Fund 1020-11455-071 . 530000 E17120-01-1020-EXP $10,000.00
Total $25,000.00
Encumbrance No.
SCANNED
FREESEInnovative approaches
• ZNI H ` Practical results
1 a O S Outstanding service
2711 N.Haskell Avenue,Suite 3300 • Dallas,Texas 75204 • 214-217-2200 • FAX 817-735-7491 www.freese.com
August 22, 2019
Sarah West, P.E.,CFM
Major Projects Engineer
City of Corpus Christi
1201 Leopard Street
Corpus Christi,TX 78401
Re: E17119 Area Development Plans-Southside and London Area Development Plans
E17120 Area Development Plans-Westside Area Development Plan
Dear Ms. West:
Freese and Nichols, Inc. (FNI) is requesting a scope and budget change for the Southside/London and
Westside Area Development Plans to add Task 6—Additional Services(Amendment No. 1).
Additional tasks may be required during the development of the area development plans such as
renderings, conceptual design, and engineering feasibility analysis, etc.Any additional services will need
to be authorized by the City's project manager.A scope/estimated fee will be negotiated at the time of
the request for additional tasks.
Amendment No. 1-Additional Services will be for a total not-to-exceed $25,000,amending the total
contract value to$325,000.
Sincerely,
Shad Comeaux,AICP
Associate
cc: Daniel McGinn; Keren Costanzo,AICP LEED AP
Attachments:
Revised Fee Table
EXHIBIT A
Page 1 of 2
Freese and Nichols,Inc.
P. 0. Box 980004
Fort Worth, Texas 76198-0004
(817)735-7300
Please contact Lisa Boggs at(361)561-6500 with questions
Total
Task A -Southside and London Area Development Plans -City Project No. E17119 Contract Amd No. 1 Amd No. 2 Contract
Task A-1 - Meetings & Community Engagement $51,900 $0 $0 $51,900
Task A-2 - Existing Conditions and Analysis 44,187 0 0 44,187
Task A-3 - Preliminary Recommendations, Conceptual & Implementation Plans 32,113 0 0 32,113
Task A-4 - Draft Southside and London Area Development Plans 26,900 0 0 26,900
Task A-5- Final Southside and London Area Development Plans 19,900 0 0 19,900 '
Task A-6-Additional Services (allowance) 0 15,000 0 15,000 •
Subtotal Southside/London Services $175,000 $15,000 $0 $190,000
Task B -Westside Area Development Plan -City Project No. E17120
Task B-1 -Meetings& Community Engagement $44,358 $261 $0 $44,619
Task B-2 - Existing Conditions and Analysis 25,387 1,799 0 27,186
Task B-3 - Preliminary Recommendations, Conceptual & Implementation Plans 18,837 -2,683 0 16,154
Task B-4 - Draft Westside Area Development Plans 22,718 443 0 23,161
Task B-5 - Final Westside Area Development Plans 13,700 180 0 13,880
Task B-6 -Additional Services (allowance) 10,000 10,000
Subtotal Westside $125,000 $10,000 $0 $135,000
Summary of Fees
Southside and London $175,000 $15,000 $0 $190,000
Westside 125,000 10,000 0 135,000
Total of Fees 1 $300,000 $25,000 $0 $325,000
1:1rn
CD
CD _
NW
°, i
Na
FM Project No.COR1 8613
Sample form for:
Payment Request
COMPLETE PROJECT NAME AE Contract
Project No. )(XXX Revised 02/01/17
Invoice No. 12345
Invoice Date 01/01/2017
Total Current Previous Total Remaining Percent
Basic Services: Contract Amd No. 1 Amd No. 2 Contract Invoice Invoice Invoice Balance Complete
Preliminary Phase $1,000.00 $0.00 $0.00 $1,000.00 $0.00 $1,000.00 $1,000.00 $0.00 100.0%
Design Phase $2,000.00 $1,000.00 $0.00 $3,000.00 $1,000.00 $500.00 $1,500.00 $1,500.00 50.0%/ .
Bid Phase $500.00 $0.00 $250.00 $750.00 $0.00 $0.00 $0.00 $750.00 0.0%
Construction Phase $2,500.00 $0.00 $1,000.00 $3,500.00 $0.00 $0.00 $0.00 $3,500.00 0.0%
Subtotal Basic Services $6,000.00 $1,000.00 $1,250.00 $8,250.00 $1,000.00 $1,500.00 $2,500.00 $5,750.00 30.3%
Additional Services:
Permitting $2,000.00 $0.00 $0.00 $2,000.00 $500.00 $0.00 $500.00 $1,500.00 25.0%
Warranty Phase $0.00_ $1,120.00 $0.00 $1,120.00 $0.00 $0.00 $0.00 $1,120.00 0.0%
Inspection $0.00 $0.00 $1,627.00 $1,627.00 $0.00 $0.00 $0.00 $1,627.00 0.0%
Platting Survey TBD TBD TBD TBD TBD TBD TBD TBD TBD
0 & M Manuals TBD_ TBD TBD_ TBD TBD TBD TBD TBD TBD
SCADA TBD TBD TBD TBD TBD TBD TBD TBD TBD
Subtotal Additional Services $2,000.00 $1,120.00 $1,627.00 $4,747.00 $500.00 $0.00 $500.00 $4,247.00 10.5%
Summary of Fees:
Basic Services Fees $6,000.00 $1,000.00 $1,250.00 $8,250.00 $1,000.00 $1,500.00 $2,500.00 $5,750.00, 30.3%
Additional Services Fees $2,000.00 $1,120.00 $1,627.00 $4,747.00 $500.00 $0.00 $500.00 $4,247.00 10.5%
Total of Fees $8,000.00 $2,120.00 $2,877.00 $12,997.00 $1,500.00 $1,500.00 $3,000.00; $9,997.00; 23.1%
Notes:
If needed, update this sample form based on the contract requirements.
If applicable, refer to the contract for information on what to include with time and materials (T&M).
-om
SD x
CC 7
CD is
0 W