HomeMy WebLinkAboutC2019-516 - 9/26/2019 - NA •
TASK ORDER NO. 20
This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing
by and between City of Corpus Christi, Texas (City) and Rock Engineering & Testing Laboratory, Inc., (Lab)
dated January 16, 2018 by Motion No. M2018-005 (Agreement). Lab shall perform services on the project
described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until
it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement
as it pertains to the project described below.
MSA PROJECT NUMBER/NAME: 17100A Geotechnical and Construction Materials Testing
TASK ORDER PROJECT NUMBER/NAME: 17100U Geotechnical and Construction Materials Testing
1. PROJECT DESCRIPTION: 19061A IDIQ Minor Street Improvements FY 2019 (Part A) -$15,678.50
19062A IDIQ Minor Street Improvements FY 2019 (Part B) -$12,542.80
19063A IDIQ Minor Street Improvements FY 2019 (Part C) - $3,135.70
2. SCOPE OF SERVICES— GeoTech and/or Construction Material Services to observe, test and report for
IDIQ Minor Street Improvements FY 2019 project, and as more fully described in Exhibit A.
3. COMPENSATION —The total amount not to exceed for this Task Order only is $31,357.00.
This Task Order is approved, and Lab may proceed. All other terms and conditions of the Agreement remain
in full force and effect.
CITY OF COR US CHRISTI ROCK ENGINEERING &TESTING
LABORATORY, INC.
d,,,,,,,,e
„7/20 _ 09-26-19
Jeff H. Edmonds, P.E. Cu is A. ocDate
Director of Engineering Services Chie erating Office
6817 Leopard Street
Corpus Christi, TX 78409
(361) 883-4555 Office
curtis@rocktesting.com
SCAN N ETA Order
age N1o.20
Pof 3
TASK ORDER FUNDING REQUEST FORM
CONTRACT MSA#AND TITLE: 17100A Geotechnical and Construction Materials Testing(ROCK)
TASK ORDER PROJECT#/TITLE: 17100U Geotechnical and Construction Materials Testing(ROCK)
REQUESTING DEPARTMENT:ENGINEERING DEPARTMENT
FUND NAME/FUND#-ME: ACCOUNT: ACTIVITY:
1041-051 550920 19061-A-1041-EXP($15,678.50)
1041-051 550920 19062-A-1041-EXP(S12,542.80)
1041-051 550920 19063-A-1041-EXP($3,135.70)
CONSULTANT: Rock Engineering
TASK ORDER#: 20
SCOPE OF WORK:SEE PROPOSAL
TASK ORDER IS FOR PROJECT(S)LISTED BELOW:
PROJECT# FEE PROJECT NAME
19061A/ $31,357.00 IDIQ Minor Street Improvements FY2019
19062A/
19063A
$31,357.00 Grand Total
Marisa Alaniz
PM PRINT NAME:
N
9/24/2019
DATE:
Task Order No.20
Page 2 of 3
Project Number: 19061 A/19O62A/19O63A
Accounting Unit: 1041-051
Account: 550920
Activity: 19061-A-1041-EXP ($15,678.50)
19062-A-1041-EXP ($12,542.80)
19063-A-1041-EXP ($3,135.70)
Account Category: 50920
Fund Name: Streets
Amount: $31,357.00
Task Order No.20
Page 3 of 3
`#o * res • GEOTECHNICAL ENGINEERING
• CONSTRUCTION MATERIALS
(A • OC .c ENGINEERING &TESTING
� • SOILS • ASPHALT • CONCRETE
oq ece°
4r09F, `oo
City of Corpus Christi
Felix Ocanas, PE
SUBJECT: ESTIMATED TESTING BUDGET FOR THE PROPOSED
19061A,19062A, 19063A IDIQ MINOR STREET IMPROVEMENTS FY 2019
Corpus Christi, TX
RETL Proposal Number: P080819A
Dear Mr. Ocanas,
Rock Engineering and Testing Laboratory, Inc. (RETL) (TBPE Firm No. 2101) is pleased to provide an estimate to
perform the required Construction Materials Testing for the above referenced project. The Construction Materials
Testing for the above referenced construction project is based upon quantities as derived from the information as
provided to RETL as of the date of this proposal.
We understand that we have been chosen to provide these services for this publicly funded project. Therefore, by
providing cost information we are not in violation of the Texas Professional Services Procurement Act.
The estimated testing amount for this project is$31,357.00. This estimate will change and is dependent upon the
actual scope of work performed as requested by project representatives as well as any implemented
recommendations once the Geotechnical Report has been issued. Requested services beyond what is contained in
this estimate will be billed based on the unit rates contained here-in.
Please make note that the actual fees invoiced for this project will be based on the actual testing requested and
performed. The total fee assessed will be dependent on the contractor's construction techniques. number of trips
made to the jobsite, elapsed time from technician arrival to commencement of testing activities, and any stand-by
time the technician is required to be on-site but not performing testing activities.
This estimate does not take into account project schedule, weather delays, and cancellations of services after arrival,
etc. which are beyond RETL's control. Also note, that holiday/Sunday rates do apply as well as overtime rates for
services beyond 8 hours at a rate of$112.50 per hour.
In order to best respond to the project testing needs and schedules, please schedule testing a minimum of 48 hours
in advance in order to defer any potential delays. RETL strives to accommodate all testing requests as they are
received and can make accommodations with advanced notice to schedules.
RETL appreciates your consideration of our firm to assist you during the construction phase of your project. If you
agree with this proposal, please sign the attached Laboratory Testing Services Agreement, submit the Distribution
List and provide billing information. Please do not hesitate to contact me at(361)883-4555 extension 415 if you have
any questions regarding the proposal or would like to discuss further.
Sincerely,
Pablo Schmitt
Project Estimator
Exhibit A
Page 1 of 4
ROCK ENGINEERING&TESTING LABORATORY,INC.
6817 LEOPARD STREET•CORPUS CHRISTI,TEXAS,78409
OFFICE: (361)883-4555•FAX: (361)883-4711 •www.rocktesting.com
P080819A
s. ',
°T�y
a 19061A,19062A, 19063A IDIQ MINOR STREET IMPROVEMENTS FY 2019
OC .
'' CITY OF CORPUS CHRISTI
.A' CORPUS CHRISTI,TX
JEFFREY EDMONDS, PE
01.SOILS
SOILS-SUBGRADE/GENERAL FILL
LANES/LIFTS QTY per
MIN PER SET TESTING FREQ FREQ TOTAL RATE AMOUNT
S190 MATERIALS SAMPLING CHARGE 1 SAMPLING 6 6 EA $71.00 $426.00
5510 PROCTOR-STANDARD ASTM D698 1 SEE PLANS 6 6 EA $270.00 $1,620.00
S600-1 NUCLEAR FIELD DENSITY Min 3(ASTM D6938) 1 SEE PLANS 39 39 EA $53.00 $2,067.00
V486 VEHICLE 1 PER TRIP 17 17 TR $53.00 $901.00
SUBTOTAL SOILS-SUBGRADE/GENERAL FILL $5,014.00
SOILS-BASE MATERIAL
LANES/LIFTS QTY per
MIN PER SET TESTING FREQ FREQ TOTAL RATE AMOUNT
S190 MATERIALS SAMPLING CHARGE 1 SEE PLANS 7 7 EA $71.00 $497.00
S502 ATTERBERG LIMITS/PLASTICITY INDEX(W/AGGR)ASTM D4318 1 SEE PLANS 7 7 EA $118.00 $826.00
S504 GRADATION(Sieve Analysis)ASTM C136 D6913 1 SEE PLANS 7 7 EA $118.00 $826.00
S522 PROCTOR-MODIFIED ASTM D1557 1 SEE PLANS 7 7 EA $309.00 $2,163.00
S546 WET BALL MILL 1 SEE PLANS 7 7 EA $386.00 $2,702.00
S548 LA ABRASION(ASTM C131) 1 SEE PLANS 7 7 EA $385.00 $2,695.00
S600-1 NUCLEAR FIELD DENSITY Min 3(ASTM D6938) 1 SEE PLANS 58 58 EA $53.00 $3,074.00
S610 CALIFORNIA BEARING RATIO(ASTM D1883) 1 SEE PLANS 2 2 EA $637.00 $1,274.00
V486 VEHICLE 1 PER TRIP 22 22 TR $53.00 $1,166.00
SUBTOTAL SOILS-BASE MATERIAL $15,223.00
01.SOILS SUBTOTAL $20,237.00
03.ASPHALT
ASPHALT
HMA
LANES/LIFTS QTY per
MIN PER SET TESTING FREQ FREQ TOTAL RATE AMOUNT
A105 ASPHALT FULL SERIES(ASTM C117,C136,D2041,D6307) 1 SEE PLANS 4 4 EA $770.00 $3,080.00
A200 ROLLING PATTERN 1 PER HOUR 4 4 HR $77.00 $308.00
A202 ASPHALT CORED IN PLACE DENSITY 1 SEE PLANS 4 4 EA $122.00 $488.00
A203 ASPHALT CORE-TRIMMING 1 PER CORE 4 4 EA $34.00 $136.00
CI61 PATCHING CORES 1 PER CORE 4 4 EA $26.00 $104.00
S191 SAMPLE PREPARATION CHARGE 1 PER SAMPLE 4 4 EA $75.00 $300.00
V486 VEHICLE 1 PER TRIP 8 8 TR $53.00 $424.00
SUBTOTAL ASPHALT $4,840.00
03.ASPHALT SUBTOTAL $4,840.00
Exhibit A
Page 2 pf 4
Thursday,August 08,2019 Page 1 of 3
P080819A
44).. 19061A,19062A, 19063A IDIQ MINOR STREET IMPROVEMENTS FY 2019
OCa
o CITY OF CORPUS CHRISTI
' CORPUS CHRISTI,TX
JEFFREY EDMONDS, PE
04.CONCRETE
CONCRETE
CURB GUTTER;SIDEWALKS;DRIVEWAYS
LANES/LIFTS QTY per
MIN PER SET TESTING FREQ FREQ TOTAL RATE AMOUNT
C301-1 CONCRETE CYLINDERS 5 SEE PLANS 13 65 EA $53.00 $3,445.00
S399 CUBES/CYLINDERS PICK UP FEE 1 PER POUR 13 13 POUR $50.00 $650.00
V486 VEHICLE 1 PER TRIP 26 26 TR $53.00 $1,378.00
SUBTOTAL CONCRETE $5,473.00
04.CONCRETE SUBTOTAL $5,473.00
MISCELLANOUS
MISCELLANEOUS
PROJECT SETUP FEE
LANES/LIFTS QTY per
MIN PER SET TESTING FREQ FREQ TOTAL RATE AMOUNT
P119 PROJECT SETUP 1 PER PROJECT 1 1 LS $87.00 $87.00
S392 ADMINISTRATIVE/DATA ENTRY 1 PER HOUR 12 12 HR $60.00 $720.00
SUBTOTAL MISCELLANEOUS $807.00
MISCELLANOUS SUBTOTAL $807.00
GRAND TOTAL $31,357.00
All Laboratory Testing Rates include Technician Time and Reporting
Soil densities will be billed 3 minimum per call out(1 hour per 3 densities).
The vehicle fee includes the technician travel time and all vehicle charges.
The fee for one set of concrete test cylinders includes the technician time(1 hr),equipment,making,curing,testing and reporting.
Certified Weld Inspections(CWI)will be billed at 4 hours minimum.
TESTING NOT INCLUDED:TEX DOT 117E TRIAXIAL
Exhibit A
Page 3 of 4
Thursday,August 08,2019 Page 2 of 3
P080819A
.' ��� 19061A,19062A, 19063A IDIQ MINOR STREET IMPROVEMENTS FY 2019
iO C
'. ° CITY OF CORPUS CHRISTI
.A 4' CORPUS CHRISTI, TX
JEFFREY EDMONDS, PE
Exhibit A
Page 4 of 4
Thursday,August 08,2019 Page 3 of 3