HomeMy WebLinkAboutC2019-548 - 10/14/2019 - NA TASK ORDER NO. 2
This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing
by and between City of Corpus Christi, Texas (City) and Rock Engineering & Testing Laboratory, Inc., (Lab)
dated July 31, 2019 by Motion No. M2019-114 (Agreement). The Lab shall perform services on the project
described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until
it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement
as it pertains to the project described below.
MSA PROJECT NUMBER/NAME: 19056A Geotechnical and Construction Materials Testing
TASK ORDER PROJECT NUMBER/NAME: 19056C Geotechnical and Construction Materials Testing
Icx[
1. PROJECT DESCRIPTION: 18094A Citywide Water Distribution System (IDIQ)
2. SCOPE OF SERVICES— GeoTech and/or Construction Material Services to observe, test and report for
the 18094A Citywide Water Distribution System (IDIQ) project, and as more fully described in Exhibit A.
3. COMPENSATION —The total amount not to exceed for this Task Order No. 2 only is $7,800.00.
This Task Order is approved, and Lab may proceed. All other terms and conditions of the Agreement remain
in full force and effect.
CITY OF CORPUS ; I ROCK ENGINEERING &TESTING
LABORATORY, INC.
161- to-08-19
�
Jeff . Edmonds, P.E. Dat: Curtis . ock Date
Director of Engineering Services Chief Operating Officer
6817 Leopard Street
Corpus Christi, TX 78409
(361) 883-4555 Office
curtis@rocktesting.com
SCANNEDaskPge "of3
Accounting Unit: 4093-041
Account: 550920
Activity: 18094-A-4093-EXP
Account Category: 50920
Fund Name: Water 2013 RVBD
Amount: $7,800.00
Task Order No.2
Page 2 of 3
•
TASK ORDER FUNDING REQUEST FORM
CONTRACT MSA#AND TITLE: 19056A Geotechnical and Construction Materials Testing(ROCK)
TASK ORDER PROJECT#/TITLE 19056C Geotechnical and Construction Materials Testing(ROCK)
REQUESTING DEPARTMENT: Engineering Services
FUND NAME/FUND#-ME: ACCOUNT: _ACTIVITY:
4093-041 550920 18094-A-4093-EXP
CONSULTANT: Rock Engineering&Testing(ROCK)
TASK ORDER#: 2
SCOPE OF WORK:SEE PROPOSAL
TASK ORDER IS FOR PROJECT(S)LISTED BELOW:
PROJECT# FEE PROJECT NAME
18094A $7,800 CW Water IDIQ Yr 2 (Flour Bluff Drive 24-Inch Waterline)
$7,800 Grand Total
SANDRA GOMEZ, PE
PM 'RINT NAME:
44"GNATURE: /
/O B
DAT .
Task Order No.2
Page 3 of 3
G ' rFs, • GEOTECHNICAL ENGINEERING
�4 T� CONSTRUCTION MATERIALS
• OC �o •• ENGINEERING&TESTING
e P�` • SOILS•ASPHALT•CONCRETE
O,Qgr�'4Y ��GpPQOP
October 3,2019
City of Corpus Christi
Department of Engineering Services
518 S. Enterprize Pkwy Suite C
Corpus Christi,Texas 78405
Attention: Ms. Sandra L. Gomez, P.E.
SUBJECT: PROPOSAL TO PERFORM A SUBSURFACE INVESTIGATION, LABORATORY
TESTING PROGRAM,AND PROVIDE GEOTECHNICAL RECOMMENDATIONS
FOR THE PROPOSED
NEW WATER LINE ON FLOUR BLUFF
CORPUS CHRISTI,TEXAS
18094A Citywide Water Distribution System Repair Replacement IDIQ(Year 2)
Task Order#2
RETL Proposal Number: P100119A
Dear Ms. Gomez,
Rock Engineering and Testing Laboratory, Inc. (RETL) (TBPE Firm No. 2101) is pleased to submit the
following proposal to provide a subsurface investigation, laboratory testing, and provide geotechnical
recommendations the new water line along the east side of Flour Bluff Drive from the intersection of
Yorktown Boulevard to the intersection of Division Street located in Corpus Christi,Texas.
Based on information provided to RETL, the project will include the replacement of the city water
transmission main.The proposed alignment of the water transmission main will be located within the right-
of-way of Flour Bluff Drive 10 to 15 feet from the edge of pavement. The project includes approximately
12,000 linear feet of 24-inch water main installed by conventional trenching methods and approximately
6,203 feet of 24-inch water main installed by horizontal directional drilling (HDD). The water main
installed by conventional trenching will have a minimum of 36-inches to 48-inch of cover. In the trenched
segment, the pipe will be typically placed directly onto a sandy/granular bedding and encased in the same
material. Trench backfill from at least 12-inch above the pipe to existing grade will be backfilled with in-
situ native material.
Based on the information provided by the City of Corpus Christi's Engineering Services Department and
based on RETLs experience with soils in the area of the project, RETL will perform four borings to a
termination depth of 25 feet, at each designated location provided by the City of Corpus Christi. (Total
number of Borings: 4; Total linear feet of Drilling: 100 LF).
The scope of work is outlined below.
ROCK ENGINEERING&TESTING LABORATORY,INC.
Corpus Christi San Antonio Round Rock
Office:361.883.4555 Office:210.495.8000 Office:512.284.8022
Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764
6817 Leopard St. 10856 Vandale 7 Roundville Ln.
Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 78664
www.rocktesting.com Exhibit A
Page 1 of 4
•
Page 2 of 4 PROPOSED NEW WATER LINE ON FLOUR BLUFF
October 3,2019 Flour Bluff Drive
Attn:Ms.Sandra Gomez,P.E., City of Corpus Christi
RETL Proposal No.:P 100119A
Scope of the Proposed Subsurface Investigation
• RETL will stake the boring locations in the field prior to the field investigation.
• Coordination with Texas One Call will be performed by RETL to identify underground utilities in the
proximity of the boring/core locations. The borings/cores will be relocated if necessary.
• RETL will utilize signage and safety cones as necessary to provide a safe work site during our field
investigation.
• The borings will be sampled every 2.5-feet to the termination depth of the borings.
• Groundwater readings will be obtained during drilling and immediately upon completion of the drilling
operations.
• After obtaining the delayed groundwater readings, the open boreholes will be backfilled with excess
soils obtained during the drilling operations.
Scope of Laboratory Testing Program
• Supplementary Visual Classification (ASTM D2487)
• Water Content Tests (ASTM D2216)
• Atterberg Limits Tests (ASTM D4318)
• Percent passing No. 200 (ASTM Dl 140)
• Sieve Analysis(ASTM D6913)
The preceding test methods may be performed on selected samples, depending on the actual subsurface
conditions encountered. All phases of the laboratory testing program will be performed in general
accordance with applicable ASTM Specifications. All laboratory test results will be provided in the report
or included on the boring logs.
Projected Schedule
After authorization, it is estimated that the drilling operations can begin within 5 to 10 business days and
the final report will be submitted within three weeks of the completed fieldwork. RETL will consult with
the engineers as field and laboratory test results become available by providing preliminary
recommendations as required to assist in design. If adjustments to the proposed timeline are required to
meet the existing project schedule, please contact RETL so that we can accommodate your needs.
Geotechnical Engineering Report
In addition to the field and laboratory testing, a geotechnical engineering report will be prepared that
includes a description of the field exploration and laboratory tests, boring logs, a discussion of the
engineering properties of the subsurface materials encountered, trench excavation design parameters,
OSHA soil type classification, and utility trench earthwork recommendations.
ROCK ENGINEERING& TESTING LABORATORY,INC.
Corpus Christi San Antonio Round Rock
Office:361.883.4555 Office:210.495.8000 Office:512.284.8022
Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764
6817 Leopard St. 10856 Vandale 7 Roundville Ln.
Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 78zhibit A
www.rocktesting.com Page 2 of 4
Page 3 of 4 PROPOSED NEW WATER LINE ON FLOUR BLUFF
October 3,2019 Flour Bluff Drive
Attn:Ms.Sandra Gomez,P.E., City of Corpus Christi
RETL Proposal No.:P 100119A
Fees and Limitations
We understand that we have been chosen to provide these services for this publicly funded
project. Therefore,by providing cost information,we are not in violation of the Texas Professional Services
Procurement Act.
The total fee to perform the scope of work outlined above is $7,800.00.
The total project fee includes the field investigation, laboratory testing, geotechnical and pavement
recommendations, and report preparation. The following items will be added to the final invoice as
required:
1. Additional drilling required due to subsurface conditions: $95.00 per linear foot.
2. Additional HMAC cores: $300.00 per core.
3. Standby time: $275.00 per hour/per company.
Please note that the total fee provided above will be honored for 90 days after the date of this proposal.
After 90 days, RETL should be contacted to reevaluate the fees and revise the proposal as needed.
Services provided for any revisions after the submittal of the final report,approved by the client in a change
order, will be invoiced at a rate of$180.00 per hour.
The total fee to perform the scope of work does not include site assistance in the event the boring/core
locations are inaccessible. Mechanical assistance required to access the boring locations will be assessed
based on the subcontractors' hourly fee plus the mobilization fee. The total fee does not include
development and implementation of a traffic control plan or traffic control devices, should it be required.
Services provided by RETL under this Agreement will be performed in a manner consistent with the degree
of care and skill ordinarily exercised by members of the same profession currently practicing under similar
circumstances.
ROCK ENGINEERING& TESTING LABORATORY,INC.
Corpus Christi San Antonio Round Rock
Office:361.883.4555 Office:210.495.8000 Office:512.284.8022
Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764
6817 Leopard St. 10856 Vandale 7 Roundville Ln.
Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 7864.bit A
www.rocktesting.com xhi
Page 3 of 4
Page 4 of 4 PROPOSED NEW WATER LINE ON FLOUR BLUFF
October 3,2019 Flour Bluff Drive
Attn:Ms. Sandra Gomez,P.E., City of Corpus Christi
RETL Proposal No.:P100119A
Closing
If you are in agreement with our proposed scope of work, please authorize us to proceed by signing in the
space below and returning one copy to us.
Thank you for your consideration of our firm to assist you with this project. If you have any questions, or
comments, please call at(361) 883-4555.
Sincerely, ACCEPTED AND APPROVED
By
Print
Jam P. Bauer, P.E.
Bra ch Manager Date
For payment of services, invoice to:
Firm: Attn:
Address: Title:
City: State: Zip Code: Phone: Fax:
E-mail address:
**Payment is due upon receipt of the invoice. Please remit to the above address and reference your
invoice number on payment.
ROCK ENGINEERING& TESTING LABORATORY,INC.
Corpus Christi San Antonio Round Rock
Office:361.883.4555 Office:210.495.8000 Office:512.284.8022
Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764
6817 Leopard St. 10856 Vandale 7 Roundville Ln.
Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 78gzhibit A
www.rocktesting.com Page 4 of 4