Loading...
HomeMy WebLinkAboutC2019-548 - 10/14/2019 - NA TASK ORDER NO. 2 This Task Order pertains to a Master Services Agreement for Geotechnical and Construction Materials Testing by and between City of Corpus Christi, Texas (City) and Rock Engineering & Testing Laboratory, Inc., (Lab) dated July 31, 2019 by Motion No. M2019-114 (Agreement). The Lab shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. MSA PROJECT NUMBER/NAME: 19056A Geotechnical and Construction Materials Testing TASK ORDER PROJECT NUMBER/NAME: 19056C Geotechnical and Construction Materials Testing Icx[ 1. PROJECT DESCRIPTION: 18094A Citywide Water Distribution System (IDIQ) 2. SCOPE OF SERVICES— GeoTech and/or Construction Material Services to observe, test and report for the 18094A Citywide Water Distribution System (IDIQ) project, and as more fully described in Exhibit A. 3. COMPENSATION —The total amount not to exceed for this Task Order No. 2 only is $7,800.00. This Task Order is approved, and Lab may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS ; I ROCK ENGINEERING &TESTING LABORATORY, INC. 161- to-08-19 � Jeff . Edmonds, P.E. Dat: Curtis . ock Date Director of Engineering Services Chief Operating Officer 6817 Leopard Street Corpus Christi, TX 78409 (361) 883-4555 Office curtis@rocktesting.com SCANNEDaskPge "of3 Accounting Unit: 4093-041 Account: 550920 Activity: 18094-A-4093-EXP Account Category: 50920 Fund Name: Water 2013 RVBD Amount: $7,800.00 Task Order No.2 Page 2 of 3 • TASK ORDER FUNDING REQUEST FORM CONTRACT MSA#AND TITLE: 19056A Geotechnical and Construction Materials Testing(ROCK) TASK ORDER PROJECT#/TITLE 19056C Geotechnical and Construction Materials Testing(ROCK) REQUESTING DEPARTMENT: Engineering Services FUND NAME/FUND#-ME: ACCOUNT: _ACTIVITY: 4093-041 550920 18094-A-4093-EXP CONSULTANT: Rock Engineering&Testing(ROCK) TASK ORDER#: 2 SCOPE OF WORK:SEE PROPOSAL TASK ORDER IS FOR PROJECT(S)LISTED BELOW: PROJECT# FEE PROJECT NAME 18094A $7,800 CW Water IDIQ Yr 2 (Flour Bluff Drive 24-Inch Waterline) $7,800 Grand Total SANDRA GOMEZ, PE PM 'RINT NAME: 44"GNATURE: / /O B DAT . Task Order No.2 Page 3 of 3 G ' rFs, • GEOTECHNICAL ENGINEERING �4 T� CONSTRUCTION MATERIALS • OC �o •• ENGINEERING&TESTING e P�` • SOILS•ASPHALT•CONCRETE O,Qgr�'4Y ��GpPQOP October 3,2019 City of Corpus Christi Department of Engineering Services 518 S. Enterprize Pkwy Suite C Corpus Christi,Texas 78405 Attention: Ms. Sandra L. Gomez, P.E. SUBJECT: PROPOSAL TO PERFORM A SUBSURFACE INVESTIGATION, LABORATORY TESTING PROGRAM,AND PROVIDE GEOTECHNICAL RECOMMENDATIONS FOR THE PROPOSED NEW WATER LINE ON FLOUR BLUFF CORPUS CHRISTI,TEXAS 18094A Citywide Water Distribution System Repair Replacement IDIQ(Year 2) Task Order#2 RETL Proposal Number: P100119A Dear Ms. Gomez, Rock Engineering and Testing Laboratory, Inc. (RETL) (TBPE Firm No. 2101) is pleased to submit the following proposal to provide a subsurface investigation, laboratory testing, and provide geotechnical recommendations the new water line along the east side of Flour Bluff Drive from the intersection of Yorktown Boulevard to the intersection of Division Street located in Corpus Christi,Texas. Based on information provided to RETL, the project will include the replacement of the city water transmission main.The proposed alignment of the water transmission main will be located within the right- of-way of Flour Bluff Drive 10 to 15 feet from the edge of pavement. The project includes approximately 12,000 linear feet of 24-inch water main installed by conventional trenching methods and approximately 6,203 feet of 24-inch water main installed by horizontal directional drilling (HDD). The water main installed by conventional trenching will have a minimum of 36-inches to 48-inch of cover. In the trenched segment, the pipe will be typically placed directly onto a sandy/granular bedding and encased in the same material. Trench backfill from at least 12-inch above the pipe to existing grade will be backfilled with in- situ native material. Based on the information provided by the City of Corpus Christi's Engineering Services Department and based on RETLs experience with soils in the area of the project, RETL will perform four borings to a termination depth of 25 feet, at each designated location provided by the City of Corpus Christi. (Total number of Borings: 4; Total linear feet of Drilling: 100 LF). The scope of work is outlined below. ROCK ENGINEERING&TESTING LABORATORY,INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office:512.284.8022 Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764 6817 Leopard St. 10856 Vandale 7 Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 78664 www.rocktesting.com Exhibit A Page 1 of 4 • Page 2 of 4 PROPOSED NEW WATER LINE ON FLOUR BLUFF October 3,2019 Flour Bluff Drive Attn:Ms.Sandra Gomez,P.E., City of Corpus Christi RETL Proposal No.:P 100119A Scope of the Proposed Subsurface Investigation • RETL will stake the boring locations in the field prior to the field investigation. • Coordination with Texas One Call will be performed by RETL to identify underground utilities in the proximity of the boring/core locations. The borings/cores will be relocated if necessary. • RETL will utilize signage and safety cones as necessary to provide a safe work site during our field investigation. • The borings will be sampled every 2.5-feet to the termination depth of the borings. • Groundwater readings will be obtained during drilling and immediately upon completion of the drilling operations. • After obtaining the delayed groundwater readings, the open boreholes will be backfilled with excess soils obtained during the drilling operations. Scope of Laboratory Testing Program • Supplementary Visual Classification (ASTM D2487) • Water Content Tests (ASTM D2216) • Atterberg Limits Tests (ASTM D4318) • Percent passing No. 200 (ASTM Dl 140) • Sieve Analysis(ASTM D6913) The preceding test methods may be performed on selected samples, depending on the actual subsurface conditions encountered. All phases of the laboratory testing program will be performed in general accordance with applicable ASTM Specifications. All laboratory test results will be provided in the report or included on the boring logs. Projected Schedule After authorization, it is estimated that the drilling operations can begin within 5 to 10 business days and the final report will be submitted within three weeks of the completed fieldwork. RETL will consult with the engineers as field and laboratory test results become available by providing preliminary recommendations as required to assist in design. If adjustments to the proposed timeline are required to meet the existing project schedule, please contact RETL so that we can accommodate your needs. Geotechnical Engineering Report In addition to the field and laboratory testing, a geotechnical engineering report will be prepared that includes a description of the field exploration and laboratory tests, boring logs, a discussion of the engineering properties of the subsurface materials encountered, trench excavation design parameters, OSHA soil type classification, and utility trench earthwork recommendations. ROCK ENGINEERING& TESTING LABORATORY,INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office:512.284.8022 Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764 6817 Leopard St. 10856 Vandale 7 Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 78zhibit A www.rocktesting.com Page 2 of 4 Page 3 of 4 PROPOSED NEW WATER LINE ON FLOUR BLUFF October 3,2019 Flour Bluff Drive Attn:Ms.Sandra Gomez,P.E., City of Corpus Christi RETL Proposal No.:P 100119A Fees and Limitations We understand that we have been chosen to provide these services for this publicly funded project. Therefore,by providing cost information,we are not in violation of the Texas Professional Services Procurement Act. The total fee to perform the scope of work outlined above is $7,800.00. The total project fee includes the field investigation, laboratory testing, geotechnical and pavement recommendations, and report preparation. The following items will be added to the final invoice as required: 1. Additional drilling required due to subsurface conditions: $95.00 per linear foot. 2. Additional HMAC cores: $300.00 per core. 3. Standby time: $275.00 per hour/per company. Please note that the total fee provided above will be honored for 90 days after the date of this proposal. After 90 days, RETL should be contacted to reevaluate the fees and revise the proposal as needed. Services provided for any revisions after the submittal of the final report,approved by the client in a change order, will be invoiced at a rate of$180.00 per hour. The total fee to perform the scope of work does not include site assistance in the event the boring/core locations are inaccessible. Mechanical assistance required to access the boring locations will be assessed based on the subcontractors' hourly fee plus the mobilization fee. The total fee does not include development and implementation of a traffic control plan or traffic control devices, should it be required. Services provided by RETL under this Agreement will be performed in a manner consistent with the degree of care and skill ordinarily exercised by members of the same profession currently practicing under similar circumstances. ROCK ENGINEERING& TESTING LABORATORY,INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office:512.284.8022 Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764 6817 Leopard St. 10856 Vandale 7 Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 7864.bit A www.rocktesting.com xhi Page 3 of 4 Page 4 of 4 PROPOSED NEW WATER LINE ON FLOUR BLUFF October 3,2019 Flour Bluff Drive Attn:Ms. Sandra Gomez,P.E., City of Corpus Christi RETL Proposal No.:P100119A Closing If you are in agreement with our proposed scope of work, please authorize us to proceed by signing in the space below and returning one copy to us. Thank you for your consideration of our firm to assist you with this project. If you have any questions, or comments, please call at(361) 883-4555. Sincerely, ACCEPTED AND APPROVED By Print Jam P. Bauer, P.E. Bra ch Manager Date For payment of services, invoice to: Firm: Attn: Address: Title: City: State: Zip Code: Phone: Fax: E-mail address: **Payment is due upon receipt of the invoice. Please remit to the above address and reference your invoice number on payment. ROCK ENGINEERING& TESTING LABORATORY,INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office:512.284.8022 Fax:361.883.4711 Fax:210.495.8015 Fax:512.284.7764 6817 Leopard St. 10856 Vandale 7 Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 78gzhibit A www.rocktesting.com Page 4 of 4