Loading...
HomeMy WebLinkAboutC2019-568 - 10/16/2019 - NA TASK ORDER NO. 2 This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi, Texas (City) and Lockwood, Andrews & Newnam, Inc., (Consultant) dated September 26, 2017 (Agreement). Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. PROJECT: E12191 IDIQ Major Ditch Improvements 1. PROJECT DESCRIPTION: See proposal; Exhibit A. 2. SCOPE OF SERVICES: The scope of services is more fully described in Exhibit A. 3. COMPENSATION —The total amount not to exceed for Task Order No. 2 only is $147,842.93. 4. PROJECT DELIVERABLE(S) TIMELINE: Deliverables will be received in 11 weeks upon issuance of Notice to Proceed. This Task Order is approved, and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and e -.t. CIT' " S ' I L•CKWOOD, AND 'EWS & NEWNAM, INC. ,0A Ili ' / for 10/14/19 Je H. Edmonds, P.E. Da e Sc.' Harris, P.E., Date Director of Engineering Services Regional Manager 500 N. Shoreline Blvd, Suite 905 Corpus Christi, TX 78401 (361) 792-7225 Office SMHarris@Ian-inc.com Fund Name Accounting Account No. Activity No. Amount Unit SW Capital Resv 4540-043 550910 E12191-01-4540-EXP $147,842.93 Beginning Balance: $300,000.00 Task Order No. 1: $151,640.00 Task Order No. 2: $147,842.93 Remaining Balance: $517.07 Task Order No.2 SCANNED TASK ORDER FUNDING REQUEST FORM CONTRACT MSA#AND TITLE:E12191 IDIQ Major Ditch Improvements REQUESTING DEPARTMENT:Engineering Services FUND NAME/FUND#-ME:ACCOUNT: ACTIVITY: 4540-043 550910 E12191-01-4540-EXP CONSULTANT:LOCKWOOD,ANDREWS&NEWNAM,INC.(LAN) TASK ORDER#: 2 SCOPE OF WORK:SEE PROPOSAL TASK ORDER IS FOR PROJECT(S)LISTED BELOW: PROJECT#FEE PROJECT NAME E12191 $147,843 IDIQ Major Ditch Improvements $147,843 Grand Total SARAH WEST, P.E. PM PRINT NAME: 6c6(42\ SIGNATURE: _2 /11_ DATE: Task Order No.2 Page 2 of 2 L&Newockwoodnam,Andrews In . A LEO A DALY COMPANY June 19,2019(Revised September 27,2019) Jeff Edmonds,P.E. Director of Engineering Services City of Corpus Christi 1201 Leopard Street Corpus Christi,TX 78401 • RE: Major Ditches Contract E12191 Task Order No.2 Dear Mr. Edmonds, Lockwood,Andrews&Newnam,Inc.(LAN)has completed the work associated with task order number 1 on the Major Ditches contract E12191(TOO. The recommendations made in the draft report include follow-on work to realize the vision of the Coastal Bend Hazard Mitigation Plan(HMP)dating back to 2002 and the most recent capital improvement project following similar scope. Since its inception the Major Ditches project has been about flood mitigation and due to the modeling LAN has completed it is has been made apparent that much of the goals for Major Ditches can be met with detailed modeling. Those areas identify as"Damage Centers" in the LAN TO#1 draft report will benefit from the completion of the detailed modeling and the completion of the alternatives identification and due diligence necessary to determine the costs for these alternatives. Since our meeting LAN obtained a copy of the Major Ditches Hazard Mitigation Grant Program(HMGP)application and has reviewed its contents. The current application does not reflect the costs associated with the high level mitigation alternatives presented nor,in our opinion,does the depth damage assessment. Attached to this letter is Attachment'A'which is a scope of services for completion of detailed modeling and the completion of depth- damage assessments using the latest data. Attachment'B'is a consultant fee estimate for completion of the scope of work presented in Attachment'A'. Please contact me or Scott Harris our Corpus Christi area Regional Manager if you have any questions or concerns regarding the information presented. Respectfully submitted, Just M.Murra PE,EN Project Manager ec:Sarah West(CoCC), Daniel Ding(CoCC) 500 N.Shoreline,Ste 905 • Corpus Christi,Texas 78401 - 361 882.2257 • www.lan-inc.com Exhibit A Page 1 of 7 Attachment A Scope of Services Task Order#2 IDIQ Major Ditch Improvements (E12191) I. Description CONSULTANT entered into an agreement for Task Order No. 1 (TO#1) under the Master Services Agreement(MSA)for Project E12191"Major Ditch Improvements"with the CITY on September 26, 2017. The scope of services for TO#1 assumed that the modeling for the La Volla Creek basin would be based on Federal Emergency Management Agency (FEMA) modeling completed in 2009 by CH2MHill. However, the models were not readily available from the CITY or Nueces County. Therefore,CONSULTANT prepared completely new hydraulic models for the study reaches. Additionally,the hydrologic modeling completed by HDR for the Oso Creek Basin provided by CITY was not conducive for use with the modeled hydraulics due to the coarseness of the hydrology and the relatively small basins contributing to the studied reaches. Further,the study scope stated that the study reaches were to be utilized to update reach routing within the hydrologic modeling using the Modified-Puls method. This could only be accomplished if the basin delineations allowed for routing of the upstream basins further necessitating the need to complete new basin delineations, reach routing, and junction identification in a new hydrologic model. A project status update and report of preliminary results was provided on February 25,2019. Immediately following the presentation,the CITY requested that CONSULTANT provide a scope of work(SOW)for the recommendations made regarding the preliminary results. These recommendations included work which was not included in the SOW for Task Order No. 1. Below is the SOW required for the completion II. Phase 1—Scope of Work Task 1. Administrative 1. Meetings with staff—CONSULTANT will prepare presentations and exhibits for meetings with CITY staff and meeting minutes following each of the meetings for a total of 5 meetings. Two of the meetings will be used for kick-off and close-out of the task order,three of the meetings will be used for progress meetings; 2. Field visits—CONSULTANT will complete site visits to determine any changed conditions which affect the modeling which will be used for the update of the modeling for La Volla Creek and its tributaries. CONSULTANT will provide a letter to CITY summarizing the results of the site visit and noting any changed conditions and providing recommendations as they relate to completing the work; Deliverables: • Meeting minutes; • Meeting presentations of assumptions, results, and recommendations; ■ Electronic copies only Task 2. Existing Conditions Hydrologic Modeling 1. Updates to Task Order No. 1 Modeling—CONSULTANT will update the hydrologic modeling,shapefiles,and routing data to accommodate the existing conditions hydraulic modeling. The rainfall depths used for the 2-, 5-, 10-, 25-, 50-, 100-, and Exhibit A Page 2 of 7 Attachment A Scope of Services Task Order#2 IDIQ Major Ditch Improvements(E12191) 500-year events will be based on the City of Corpus Christi DRAFT Drainage Design Manual (DDM); 2. Updates to Task Order No. 1 Modeling(Atlas 14)—CONSULTANT will re-run the hydrology for the La Volla Creek basin using Atlas 14,Volume 11 rainfall. It is expected that the CITY will adopt the revised rainfall as its current effective design rainfall. Therefore,the results of the Atlas 14 model run will be used in the hydraulic models sent to FEMA. Results will be reported and contrasted with DDM rainfall for the 2-,5-, 10-,25-, 50-, 100-, and 500-year events; 3. Drainage Area Maps—CONSULTANT will prepare drainage area maps at a 1"=1000' scale on 22"x34"titleblock showing the subbasin delineation,flow paths,storm drainage, inlet, hydrologic reaches,junctions,and contour data used for completing the hydrology; 4. Soils Maps—CONSULTANT will prepare soils maps at a 1"=1000' scale on 22"x34" titleblock showing the subbasin delineation, and hydrologic soil group data; 5. Land-use Maps—CONSULTANT will prepare land-use maps at a 1"=1000' scale on 22"x34"titleblock showing the subbasin delineation and land-use data used in performance of the hydrologic calculations; 6. Technical memorandum—CONSULTANT will summarize model assumptions and results,compile mapping in a technical memorandum in letter format. A draft and final have been included in the scope of the tasks throughout this task order. Deliverables: • Draft technical memorandum (separate report from Technical Memo#1); • One(1) electronic PDF copy; • Two(2)full color hard copies; • Final technical memorandum • One(1)electronic PDF copy; • Two(2)full color hard copies; • Draft HEC-HMS models in electronic format; Task 3. 1D Riverine Hydraulic Modeling 1. Create New Reaches—CONSULTANT will modify modeling from Task Order No. 1 to include additional cross sections for seven new reaches shown in Figure 1. The new reaches have a drainage area of 1 sq. mi.or greater and were not included in the scope of the previous task order. FEMA mapping and modeling standards define a floodplain as a flooding source having a drainage area 1 square mile or larger; 2. Create New Hydraulic Model—Create a new 1D stead-state HEC-RAS hydraulic model for Airport Ditch No. 2, Horne Road Ditch,and Airport Tributary No. 1 Reach 2 with boundary condition from XPSWMM 1D/2D hydraulic model for Horne Road ditch; Exhibit A Page 3 of 7 Attachment A Scope of Services Task Order#2 IDIQ Major Ditch Improvements(E12191) 3. Mapping—CONSULTANT will prepare hydraulic maps at a 1"=1000'scale on 22"x34" titleblock showing the limits of the 100-year floodplain (Zone AE), 100-year BFEs, floodway(corporate limits only),and 500-year floodplain (Zone X); Deliverables: • Draft HEC-RAS models in electronic format; Task 4. Hazard Mitigation Grant Program (HMGP) and General Land Office (GLO) Grant Support 1. Attend two(2) meetings with City staff regarding the modification of the application and supporting documentation for the City's application of GLO and HMGP funds; 2. Prepare project descriptions,exhibits,and estimates which will be used by the city's grant manager when applying for funds. CONSULTANT assumes that city will provide direction to utilize the preliminary recommendations made during the February 2019 status update meeting as the basis of forming project scopes and estimates. CONSULTANT further assumes that due to the limited time available to respond and finalize the grant applications that the city acknowledges the potential for significant changes in project scope and estimates during phase 1 of the grant process. 3. Estimated project benefit will be based on February 2019 modeling and application of"Depth-Damage Relationships for Structures,Contents, and Vehicles and Content-to-Structure Value Ratios(CSVR) in Support of the Donaldsonville to the Gulf, Louisiana, Feasibility Study" by the United States Army Corps of Engineers New Orleans District dated March 2006. CONSULTANT further assumes that Phase 1 of the HMGP grant will be used to confirm the depth-damage using the required FEMA depth-damage calculator; 4. Attend six(6) monthly grant status conference calls and prepare minutes from the call. Deliverables: • Meeting Minutes; • Project Description, Estimate, and Mapping to support application; • Depth-Damage Assessment: • ESRI Shapefile of structures,floodplain used in analysis; • Microsoft Excel worksheet of depth damage relationships,structure depths,and addresses; o Electronic copy only; Exhibit A Page 4 of 7 Attachment A Scope of Services Task Order#2 IDIQ Major Ditch Improvements (E12191) NEW REACHES •„r_x.- 47 , . --• _, empume NEW REACHES I 4.1 166,, .-..„. . . ,., . , .... , . . . ._._. .. NEW REACHE - 1 /2.....„,.......- 01-LA VOLLA CREEK T —02-KELLY REACH f 03-DONIGAN CHANNEL .1.m...04-BATES CHANNEL 05-ENTERPRISE CHANNEL —06-AIRPORT DITCH#1 asp —07-SARATOGA DOWNS CRce4- ,08-AIRPORT DITCH#2 X09-HORNE ROAD DITCH Figure 1--La Voila Creek New Reaches Exhibit A Page 5 of 7 Summary of Fees&Schedule Task Order#2 IDIQ Major Ditch Improvements (E12191) SUMMARY OF FEES A. Fees for basic services—the City will pay the a/e a fixed fee, lump sum, for providing basic services associated with tasks 1 and 2, per the table below: Basic service fees Task 1. Administrative(includes expenses) $9,436.93 Task 2. Existing Conditions Hydrologic Modeling $35,550.00 Task 3. 1D Riverine Hydraulic Modeling $89,816.00 Task 4. HMGP and GLO Grant Support $13,040.00 Total for Task Order#2 $147,842.93 SCHEDULE Milestone Action NTP Begin Tasks 1-4 NTP +4 weeks Complete draft Technical Memorandum (Tasks 1, 2, and 3) NTP +6 weeks City review complete NTP + 8 weeks Revise Technical Memo and Analysis NTP +9 weeks Complete DDA (Task 4) NTP + 11 weeks Complete final Technical Memorandum Exhibit A Page 6 of 7 MANHOUR ESTIMATE moo, mm rnm c > t 3 w ¢ w w m n c _ = o m a C7 �' _ — E o U ._ o m o v 1— F a U in 0 w w < Task LAN Project No.130-10826-002 `o 8 w 0. 0 0 d 0 a No. Project Name:T02-La Voila Creek Flood Mitigation m PHASE 1 Task 1 Administrative 1. Meetings(2 meetings) 12 _ $ 3,288.00 4 8 8, 2 Field Visits 16 $ 3,280.00_ 16 Task 2 Existing Conditions Hydrologic Modeling 1. Update existing conditions hydrology 32 $ 10,600.00 8 24 40 2. Update Atlas 14 hydrology 16 $ 5,300.00 4 12 20 3. Drainage area maps 38 $ 6,550.00 2 6 - 30 4. Soils maps 38 $ 6,550.00 2 6 30 5. Land-use maps 38 $ 6,550.00 2 6 30 Task 3 1D Riverine Hydraulic Modeling 1. Create new reaches for streams w/areas<1 sq.mi. 264 $ 42,800.00 24 120 40 80 2. Create new hydraulic model 192 $ 31,300.00 4 16 80 32 60 3. Map floodplains 94 $ 15,716.00 6 12 60 16 Task 4 HMGP and GLO Grant Support 1. Attend two(2)meetings 16 $ 2,980.00 6 10 2. Prepare descriptions,exhibits,and estimates 42 $ 7,020.00 2 14 26 3. Attend six(6)conference calls 16 $ 3,040.00_ 8 8 TOTALS! 814 _I $144,974.001 0 I 20 ! 122 I 0 I 268 I 248 I 156 I_ 60 I 0 I 8 I$ - 0% 4% 17% 0% 32% 27% 14% 5% 0% 0% Expenses 8.5"x11"B&W Copy $ 0.08 /page 2000 $ 160.00 8.5'x11"Color Copy $ 0.12 /page 1100 $ 132.00 11"x17"B&W Copy $ 0.35 /page 0 $ - 11"x17"Color Copy $ 1.00 /page 550 $ 550.00 Large Format B&W Printing $ 0.50 /sq.ft. 0 $ - Large Format Color Printing $ 1.00 /sq.ft. 672 $ 672.00 Mileage $ 0.585 /mile 2205 $ 1,289.93 Postage $ 32.50 /each 2 $ 65.00 EXPENSE TOTAL I j $ 2,868.93 I Total Phase 1 Fee: $147,842.93 m m (n m m x V O Q V > T02-Fee Estimate(Rev 2019-08-22).xlsx Page 1 of 1