Loading...
HomeMy WebLinkAboutC2019-569 - 10/16/2019 - NA TASK ORDER NO. 4 This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi,Texas(City)and Cobb, Fend ley&Associates,Inc., (Consultant)dated October 30,2018(Agreement)by Motion No. M2018-207. Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. PROJECT: 6470 Holly Road - SH 286 to Greenwood Ave 1. PROJECT DESCRIPTION: 18127A118127E Subsurface Utility Engineering (SUE) Services. 2. SCOPE OF SERVICES: The scope of services is more fully described in Exhibit A. 3. COMPENSATION: The total amount not to exceed for Task Order No. 4 only is $37.990.00. 4. PROJECT DELIVERABLE(S) TIMELINE: Deliverables will be received 6 weeks upon issuance of Notice to Proceed. This Task Order is approved, and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF C R� -- • RISTI COBB, FENDLEY & ASSOCIATES, INC. 4.2 ? /_{ 10/16/2019 J H. Edmonds, P.E Date D e Dan Warth, P. E. Date Director of Engineering Services Regional Manager 505 E. Huntland Drive, Suite 100 Austin, TX 78752 (512) 834-9798 Office dwarth@cobbfendley.com Fund Name Accounting Account No. Activity No. Amount Unit SW 2012B RVBD 3549-051 550920 E12191-01-4540-EXP $37,990.00 Beginning Balance: $300,000.00 Task Order No. 1: $24,997.35 Task Order No. 2: $39,395.20 Task Order No. 3: $126,383.14 Task Order No. 4: $37,990.00 Remaining Balance: $71,234.31 Task Ord r N .4 IN N E D e TASK ORDER FUNDING REQUEST FORM CONTRACT MSA#AND TITLE: 18127A SUE Sences REQUESTING DEPARTMENT:Engineering Services FUND#/ORG/ME ACCOUNT: ACTIVITY: 3549-051 550920 170371-01-3549-EXP CONSULTANT:Cobb Fendley TASK ORDER#:4 (18127E SUE Services) SCOPE OF WORK:SEE PROPOSAL TASK ORDER IS FOR PROJECT(S)LISTED BELOW: PROJECT# FEE PROJECT NAME 6470 $37,990 HOLLY ROAD-SH 286 to Greenwood $37,990 Total SARAH WEST, P.E. PM PRINT NAME: SIGNATUR : 1)1 1/496 - DAv I lg : Task Order No.4 Page 2 of 2 CobbFendley September 25,2019 Marisa Alaniz,EIT City of Corpus Christi 1201 Leopard St. Corpus Christi,TX 78401 VIA E-MAIL Re: 18127A SUE Services MSA—Task Order#4(18127E)Holly Road SUE Corpus Christi,TX Dear Ms.Alaniz, CobbFendley is pleased to provide this scope and fee estimate for the Subsurface Utility Engineering(SUE)investigation services associated with the project referenced above,under the terms of the referenced master services agreement. The proposed Scope of Services and Basis of Compensation are outlined below. This proposal is based on an email from Marisa Alaniz (City of Corpus Christi)on September 17,2019. Scope of Services The purpose of this SUE investigation is to assist in determining the presence and location of subsurface utilities. For scope limits: Quality Level B only for target utilities at the test hole locations shown in the attached plan exhibit. Quality Level A locations are shown on the attached plan exhibit,for a total of 11 test holes. SERVICES TO BE PROVIDED BY COBB FENDLEY When performing this type of work CobbFendley typically follows ASCE 38-02"The Standard Guidelines for the Collection and Depiction of Existing Subsurface Utility Data"-see below. Utility Quality Levels are defined in cumulative order(least to greatest): Quality Level D-Existing Records: Utilities are plotted from review of available existing records Quality Level C - Surface Visible Feature Survey: Quality Level "D" information from existing records is correlated with surveyed surface-visible features. Quality Level B-Designate: Two-dimensional horizontal mapping. This information is obtained through the application and interpretation of appropriate non-destructive surface geophysical methods.Utility indications may be referenced to established survey control.Additional description of services,methodology and equipment is below. Quality Level A-Locate(Test Hole):Three-dimensional mapping and other characterization data. This information is obtained through exposing utility facilities through test holes and measuring and recording (to appropriate survey control) utility/environment data It is anticipated that for this project, CobbFendley will provide Quality Level A and Quality Level B SUE information. SUE investigations are conducted for engineering design purposes and are not to be used for construction clearing purposes. Exhibit A Page 1 of 11 18127A SUE Services MSA—Task Order#4(18127E)Holley Road SUE Page 2 of 3 :E!: CobbFendley Utility Designating(Quality Level B) 1. Coordinate with the City of Corpus Christi to schedule work. The City of Corpus Christi will provide permission or permits to perform work on site,or right of entry to property and any utility easements. CobbFendley will submit the required right-of-way permit applications and pay any required permitting fees, for subsequent reimbursement by the City of Corpus Christi. 2. CobbFendley will perform Record Research to obtain utility information for site and adjacent streets that may contain utilities leading onto the site.This will assist CobbFendley in identifying utilities and marking them in the field. 3. CobbFendley will designate(means to record and mark)the horizontal location of the existing tone-able test hole target utility using non-destructive surface geophysical techniques, at the test hole locations shown in the attached exhibit. Tone-able utilities are typically utilities that are conductive or internally accessible with a traceable fish tape or sonde. Water and communication vaults can be investigated from above ground.Cobb Fendley does not typically enter buried power vaults or manholes. 4. If internally accessible(e.g.via a cleanout)nonconductive lines can often be traced out with a fish tape or sonde.Under ideal circumstances nonconductive buried lines can be investigated successfully with Ground Penetrating Radar(GPR). Soil conditions in Texas are however generally not suitable for GPR.CobbFendley has had success using GPR for SUE work but non-conductive features can remain undetected. 5. A non-water base paint, utilizing the APWA color code scheme and pin flags will be used on all surface markings of underground features. CobbFendley will provide a field sketch of designated utilities. 6. CobbFendley will survey utility field markings and above ground utility features. CADD to draft the surveyed information onto a project base map will be provided by CobbFendley. The City of Corpus Christi will provide the base map in AutoCAD or Microstation format,as well as the applicable project survey control information. Vacuum Excavation(Quality Level A) In locations where the depth of identified buried utilities is requested,CobbFendley can perform Quality Level A vacuum test holes. Test holes are excavated using a nondestructive compressed air vacuum excavation truck. The Quality Level A Test Holes,up to eleven(11),will be performed at the locations shown on the attached plan exhibit. Vacuum excavation is performed as follows: 1) Comply with policies for the prevention of underground utility damage(i.e.,one-call system). CobbFendley will obtain permission and permits to perform work and determine location of test holes. 2) Vacuum excavate to measure and record the depth and location of found items. CobbFendley accepts no responsibility for contaminated soils should they be encountered during excavation. CobbFendley does not take ownership of any excavated material. 3) Record depth of the utility,line size,line material,condition of the line,type of soil around the line.Provide markers at each utility location. 4) Backfill the hole. Compact in lifts. Restore pavement. 5) Survey of utility test hole locations. 6) CobbFendley will provide copies of field test holes data sheets showing utility depth,size and line material,condition of the line,type of soil for each location. Exhibit A Page 2 of 11 18127A SUE Services MSA—Task Order#4(18127E)Holley Road SUE Page 3 of 3 °� CobbFendley It is anticipated that traffic control will be required for SUE on this site. Standard traffic control is performed by CobbFendley and is included in our standard rates. Standard traffic control can be described as short-term lane closure necessary to access utility features located in the roadway. It is anticipated that non-standard traffic control (lane closures,police officer present, arrow board,etc...)will be required to perform these services. The costs for non-standard traffic control have been estimated and included in this fee estimate and will be passed through to the City of Corpus Christi on our invoice,at cost plus 5%. It is anticipated that test holes will be backfilled with native soil excavated at each site, however,if select backfill is needed due to wet soil conditions or right-of-way inspector requirement,cost for select backfill will be invoiced to the City of Corpus Christi on our invoice,at cost plus 5%. Basis of Compensation SUE Services-QLB and QLA 2019 Rate Unit Quantity Sub-Total Project Manager $194.25 Hour 8 $1,554.00 Utility Specialist/Coordinator $141.75 Hour 4 $567.00 CADD $89.25 Hour 12 $1,071.00 SUE Tech I $89.25 Hour 10 $892.50 SUE Tech II $110.25 Hour 10 $1,102.50 Vac Truck Crew $309.75 Hour 78 $24,160.50 Survey Crew $162.75 Hour 8 $1,302.00 RPLS $162.75 Hour 3 $488.25 Traffic Control Plans(assume none needed) Traffic Control(Estimate) $700.00 Day 5 $3,500.00 Permitting Time $141.75 Hour 8 $1,134.00 Permitting Fees(assume none will be required) $0.00 per diem and hotel $136.50 Day/person 7 $955.50 Support Truck SUE $89.25 Day 7 $624.75 Mobilization $638.40 Each 1 $638.40 Total $37,990.40 If you have any questions or comments,please do not hesitate to contact us. Sincerely, J. Herbert,PE Sr.Project Manager Cobb,Fendley&Associates,Inc. Exhibit A Page 3 of 11 o a o 8 Y 0 0 0 e.0 L -,S —ms Imy ., ms ms t eos ilk f sss- -, 4REENRODD DRIVE YIN I}i--_— o f D o ---/a a-------, .L.. 4i 1 ,2 III '''''')0, :. i ' o i fl .' _ c R 4` ( _. , Ila § g O y N L $ R rjlM ,D IA I $-. a I R I D N Z 0 A -n m e • I O -, IF< O o a o H. \ toDN 4 8 „:1 7, a . i / I I m a r • I Z o "s g R 9�A 1 8, ;F. I jl — II 1Y N I 8 MATCHLINE STA 5+00 MATCHLINE STA 5+00 SEE SHEET 23 SEE SHEET 23 Y WWI SO OM ., OMPaP1/0. M10011.11. MI II Mr.11101 HOLLY ROAD to ' '" SH286(CROSSTOWN EXPRESSWAY) CITY OF LN� -� A E N TO GREENWOOD DRIVE CORPUS CHRISTI o msm ��w='s •W�_•- 5 ro _ _ TEXAS DEMIISL.MILLER 0.� P STREET AND DRAINAGE PLAN AND PROFILE E. o,9:�aa:.ineers architects surveyors ,.,,. 51. .,.07�,a o o x STA 0+00 TO STA 5+00 Department of " XEngineering Services ...,...00,, 0 0 o 0 MATCHUNE STA 5+00 MATCHUNE STA 5+00 SHEET T 22 SEE SHEET 22 8 I 18 1 I � n — F a „. , y. • ” $ I F ‘ „ /!�$ I F a 1i a I , w F r. F iI O s 11 8 — a a R : il(''rl iii : 1 . IZ -I o ea t£ " $ m I " F $ Z 51 a $ '0 i • N > lii `yI� $ N ot F R 51 " o f� . 4, 8 — . . 1 \ .t. -8- . f t A A $ 11 1 \J 5 1 ':, " t. 1 i L IT#i il . , 1 o' _,, , 1J ,, ya , , ]Qa 4 Ii • 1 I1 10 8 MATCHUNE STA 10+00 MATCHU NE STA 10+00 SEE SHEET 24 SEE SHEET 24 Z It II k S k . 0 0 0 0 0 0 0 0 R.rwon me n MEM. 011.1.11 N. NM n Ka•+. 1 1 HOLLY ROAD CITY OF ,:.'",.',.-:-"::::°.!•:7.7. E y II M SH266)CROSSTOWN EXPRESSWAY) hiv -a A $Iw TO GREENWOOD DRIVE CORPUS CHRISTI ` ��"�� ,7 arw N 0, 1 _ _ TEXAS e,�DERNISSL MILLER .. S $ a I STREET AND DRAINAGE PLAN AND PROFILE P engineers I architects surveyors ,•^E a° =°°"m $ STA 5+00 TO STA 10+00 Deportment ri g S o� R Engineering Services it re a o 0 0 0 0 MATCHUNE STA 10+00 MATCHUNE STA 10+00 $SEE SHEET 23 SEE SHEET 23 8 $ i — „ I I8 §: I i 1 1111 { CD aI o gN a — n ^ CD N . I F = • O N A) gill'io 4s.-. i 1 'II 1 I A11 mt i a k W 11 - 2 g [ii ! 1 Z '4-11' .... 4 I D I I Ccs-^. Z O 13 f g I OT $I m \ 1 T''' I a II' I i' 8 n � m cn 0 ` j o I : i' Ii i1!:0, d B 1w i -= r I g 1 I f� m` T„- rt- - I ! I �� o PL � � „, ' ! A A' m 3I 4 I :. . II '1 1 8 MATCHLINE STA 15+00 MATCHUNE STA 15+00 SEE SHEET 25 SEE SHEET 25 € N 8 5 5 u o 0 0 0 0 0 0 0 RRYR Y. YR Y Y..1eY MIMI Y Y! n mono 1 HOLLY ROAD13 ') B SHOPS(CROSSTOWN EXPRESSWAY) CITY HR .s^��a�� I lr TO GREENWOOD DRIVE d-4CORPUS CHRISTILINA/ �Y�F o • iA en ineers architects Isurveyors oeNNis.rniueR 8 g a t N ' STREET AND DRAINAGE PLAN AND PROFILE TEXAS a I r o a6 IX Department of co.w:0„�.. iv ,...wvo..co0. o,,,b,,.m,a. 5 STA 10+00 TO STA 15+00 Engineering Services 0 0 0 9 2 2 0 MATCHUNE STA 15+00 MATCHUNE STA 15+00 SEE SHEET 24 SEE SHEET 24 \ r j II) 11/Mme_ I =.a L- III/j :.` 1 °': % : • � :: S /' ,.1CfOR LAM ONIEGOR ST v i 111 i III „,-, \ . ,2::::,....::::-.....--... li h a'• 'm r. � •/1 d I / [It Ogr#1L. __i id / nI18 ' ; ” 4 mr. 1 z y y D o 33 8 m0 § f m • N , n La D 1+ I cn 1‘ MEM 8 -f4,I, r ,11 ' : %�Api , i + • I r —til — n_ Ik 1. rj , I /pc, v % iG Ri j 8 MATCHUNE STA 20+00 MATCHUNE STA 20+00 SEE SHEET 26 SEE SHEET 26 rt 6 2 2 2 .Pete e. ..n a i efIe a es a Meer• 1 HOLLY ROAD Iy S 7 SH286(CROSSTOWN EXPRESSWAY) CITY OF - s Ing TO GREENWOOD DRIVE CORPUS CHRISTI � ��� m N _ TEXAS F.�EMIIS L.MILLER 2 i { Z a 3 AND DRAINAGE PLAN AND PROFILE wE a gtneers IIm chitects I surveyors „ „ s, , uwa o s STREET a! S I5 STA 15+00 TO STA 20+00 Deportment of ro,P.o�.. c .M b,,m,� „ Engineerfng Services o 0 0 5 0 8 8 MATCHUNE STA 20+00 MATCHUNE STA 20 +00 SEE SHEET 25 SEESj,HEET25 8 n ~ % I� m -� 3 x G r, - I 8 r J .1i ii � r• i I { 8 ] :: R � 0 R )1 , !� R . I If/si' 8 voIt � g a pp 14 CD ` iso a ;['' A 81 !---.....ThIrLLm 14 '' _,T, o al I: le a O c 7 II I; IIIN r 1 '' CD 8 n . ~ I 1CD 1 Ch • a iI Fi - / - t 8 MATCHUNE STA 25+00 MATCHUNE STA 25+00 SEE SHEET 27 SEE SHEET 27 ii 'XI 11 8 8 k 8 6001.01. Ye n 3e301r03 MIME N. MI h MIMRb HOLLY ROAD y 9 O SH286(CROSSTOWN EXPRESSWAY) CITY OF CNV 03; 03 f IN TO GREENWOOD DRIVE CORPUS CHRISTI f 2 € 3 STREET AND DRAINAGE PLAN AND PROFILE TEXAS engineers Iarchitects surveyors eyyors oE'""'s` "" a STA 20+00 TO STA 25+00 Deportment of ro.��.�.,., 4. F..3%elm 15 Engineering Services00, a ., o 0 0 0 0 0 0 MATCHLINE STA 25+00 MATCHLINE STA 25+00 SEE SHEET 26 SEE SHEET 26 8 sl N71 L rj it _ N sii cii .1 III I i II � nI rG �� 2 n �N t � �� Xlortit r'' 9G '%% i'.' I) c / :. MII� I \::::= LIARTOI STREET I ® a a tt, ) 44/ =:w ..it•.. .3"t 33'J .1- I g e O_—_ ` / Alj 111 Z £ cr. 0 ,...- I ill 1 V e m p° I py, \ 1 ° 1 p D'O Ir 1• 3 r p 9p \ I, ! S 0 I', I`' 1 III Iltlb R I ,m a ° Xi 8 � I i .4 III � 'z 8° i6 D 8 m f \ I1 1 g T .w ;® }Si F^ iF 1 51 II\� I es I p V4 , \ Ii +I I -I X 'Ia N I P I D :f - X .. I I R I L i I O X I F 1 kq E 1 1 I 444 ' ' I F r TI or I ar I 1� 8 MATCHLINE STA 30+00 � ��1 \i_ i l' I A MATSEEISH STA 30+00 SEE SHEET 28 SEE SHEET 28 o 0 0 0 0 0 0 0 Ni11..04110. OM IT OtteRIP/MI AMIN M. UM II MAI= HOLLY ROAD /-� CITY OF 3 e '" SH286(CROSSTOWN EXPRESSWAY) ,,s°A:;'o'�,my " - • x .. N TO GREENWOOD DRIVE CORPUS y CHRISTI Li wIv • cc i J — — TEXAS ..DENNIS L.MILLER 8 i„, g L = = STREET AND DRAINAGE PLAN AND PROFILE �� engineers architects surveyors .,,,,, 5,505 .,wrr,,a o og o X Deportment of �o.w:o�.�,F,.w .u„n.o.�m STA 25+00 TO STA 30+00 Engtnearing Services a0 0 o 0 MATCHLINE STA 30+00 MATCHUNE STA 30+00 .. SEE SHEET 27 SEE SHEET 27 3 ' : a , J I I g o t I I 9 . •i 8 [ I\ 1 i :''' li rn r. 31 1 A I 16 I RI apo [ • I I I R 1, - o Rig "I I I LD') V m y .v $ .Z ; a o v m � I s o I � m R 8 i tD �c1 v �8 ' I I a \ ii 9 a I I P 18 � t ➢ T \ I I • I g a a , I 1 — Fl \ IIA 1 1 'i p iI \ LL gi m G 6 I a g v o 6b ° a .\_,L,JJ I P Y 00 [ I bi S MATCHLINE STA 35+00 SEE SHEET29 SEE MATSTA 35+00 SEE SHEET 29 5 ' « HOLLY ROAD CITY OF g m . -- ' SH286(CROSSTOWN EXPRESSWAY) �«b b ., C ro TO GREENWOOD DRIVE CORPUS CHRISTI `� -^=_ `. TEXAS Y cc 1 M TEXAS DENNISLMILLER engineers I architects I surveyors s+ o= i g STREET AND DRAINAGE PLAN AND PROFILE Deportment of engineers,I m s .s S `t � .«� >, STA 30+00 TO STA 35+00 Enginering Services 0 > Pj o 0 0 0 o a 0 tri MATCHUNE STA 35+00 MATCHUNE STA 35+00 SEE SHEET 28 SEE SHEET 28 8 � pI 8 A R a ) '...1 i ' ,,..i'I IR I If 8 i�I11I B . Ao. II r • 31 R O4 . } II • ii 91 : R a$ II ‘.1 1. , e ii • . . -- , .„ ,, . . . . „.. il, . • h_ .. IR 1J o R 0. d _O 6 • 6 S •' I i f a� p • M • 2 I o • 3 o it I 3 . \ V) i 'a s • I 1 g a o 41 o a m n i i -x Z N \\\,2\\\\\, ,\\ II 11 1; . 0 • SR 2R6/CROSSTOIN1 ACCESS RD RD 8 ;11 ,,..., 8 8 8 8 rmeR 0 DM R rRRIN MINIM RR R NLIN T HOLLY ROAD CITY OF s R y s r SN286(CROSSTOWN EXPRESSWAY) — — L�y * �:°:�-"�,- � . �,a Ev.,,,, 8 � � E n) TO GREENWOOD DRIVE CORPUS CHRISTI "' tNp' co tD _ _ TEXAS ..�DENNIS.MMILLER :. (O I t t" 3 3X STREET AND DRAINAGE PLAN AND PROFILE engineers I architects I surveyors %,, S a IX Department of vt c $ STA 35+00 TO END Deportment Services a