Loading...
HomeMy WebLinkAboutC2019-615 - 11/7/2019 - NA TASK ORDER NO. 5 This Task Order pertains to a Master Services Agreement for Professional Services by and between City of Corpus Christi,Texas(City)and LJA Engineering, (Consultant)dated June 19,2018(Agreement)by Motion No.M2018- 101. Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. PROJECT NAME/NUMBER: 18100A Citywide Storm Water Infrastructure Rehabilitation 1. PROJECT DESCRIPTION:The project scope includes the development and implementation of a City-wide Storm Water infrastructure rehabilitation and replacement program. 2. SCOPE OF SERVICES: The scope of services is more fully described in Exhibit A. 3. COMPENSATION: The total amount not to exceed $14,200.00. This Task Order is approved, and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LJA ENGINEERING Digitally vgned by Jett Edmonds Digitally signed by Jeff Coym DN.cn=Jen Edmonds.o. DN.cn=Jett Coym,o,au=LJA Engineenrg. Jeff Coym Engineering,Inc., / mail=jetheye�ccta:as com.c=us email=lcoym({i;lja.com.c=UB Date 2019.11071431.25-06'00' Date.2019.11.0708'.07'.29-08'00' Jeff H. Edmonds, P.E. Date Jeff Coym, P.E. Date Director of Engineering Services Vice President 5350 S. Staples Street, Suite 425 Corpus Christi, TX 78411 (361) 991-8550 jcoym@Ija.com SOANNED Accounting Unit: 3495-043 Account: 550950 Activity: 18100-A-3495-EXP Account Category: 50920 Fund Name: SW 2012B RVBD Amount: $14,200.00 Task Order No.5 Page 2 of 2 5350 South Staples Street.Suite 425,Corpus Christi,Texas 78411 LJA ENGINEERING t 361.991.8550 LJA corn TBPE F-1386 TBPLS 10016600 November 1, 2019 FEE PROPOSAL Jeff Edmonds, PE Director of Engineering Services City of Corpus Christi PO Box 9277 Corpus Christi, Texas 78469-9277 Re: Proposal for Task Order#5 — Leopard St. Drainage Outfall Preliminary Investigation and Preparation of Delivery Order#3: Leopard St. Drainage Outfall Improvements Citywide Storm Water Infrastructure Rehabilitation/Replacement Master Service Agreement (MSA) City Project No. 18100A LJA Project No. C007-21078-T05 Proposal No. 18-01195-T05 Dear Mr. Edmonds: LJA Engineering, Inc. (LJA) is pleased to provide this proposal for performing a preliminary investigation into the erosion issues occurring at a storm water outfall structure on Leopard St. between Callicoatte Road and Violet Road on the east bound shoulder lane. According to City Staff the existing outfall structure has been compromised and currently the associated concrete riprap and adjacent roadway are being undermined. LJA intends to perform a field investigation of the outfall and prepare a Technical Letter stating the deficiencies, recommended improvements options along with associated estimated opinions of probable construction costs. Once the recommendations have been approved by the City, LJA will prepare Delivery Order#3 (DO#3) so that the repairs may be constructed. The following is the scope of services we anticipate will be required. SCOPE OF SERVICES: 100 Field investigation and data review of subject outfall area. 200 Prepare a Technical Letter to include the following and submit to City Staff • Observed deficiencies and statement of the issues • Recommended improvement options • Opinions of probable construction costs for recommended improvements 300 Receive and address City Staff comments and finalize the Technical Letter 400 Prepare Draft DO#3 package for City Staff review and comment 500 Receive and address City Staff comments and finalize DO#3 600 Conduct Site Walk Through with Contractor for DO#3 700 Review Submittals from Contractor as Required 800 Perform Construction Administration Exhibit A R:\BP'S-OPPORTUNITIES(ENGINEERING)\2019\18-01195-T05-Leopard St.Drainage Outfall Improvements\18-01195-T05-Proposal Letter.docx Page 1 of 2 Mr. Jeff Edmonds, PE November 1, 2019 Page 2 of 2 ITEMS TO BE PROVIDED BY THE CITY: • Existing Record Drawings of subject storm water outfall as originally constructed and subsequent improvements or modifications if available SCHEDULE: Notice to Proceed TBD Field investigation and data review 1 Week After NTP Prepare and submit Technical Letter to City Staff for review 2 Weeks After NTP Prepare and submit Draft DO#3 for City Staff review 5 Weeks After NTP Address City comments and finalize DO#3 1 Week After Draft Submittal FEE ANALYSIS: We propose to provide these services for a fixed fee of $14,200.00 and as summarized in the Table below. DESCRIPTION NOT TO EXCEED AMOUNT Maximum Contract Per Initial MSA Contract $500,000.00 Task Order No. 1 $46,645.00 Task Order No. 2 $33,375.00 Task Order No. 3 $28,190.00 Task Order No. 4 $46,090.00 Task Order No.5 $14200.00 Remaining MSA Contract Amount $331.500.00 If this proposal meets with your approval, your signature below will be sufficient authorization to commence the work. We appreciate the opportunity to submit this proposal and look forward to working with you on completion of this project. If you have any questions, please feel free to contact me at any time at 361.991.8550 or by email at jcoymlia.com. Sincerely, Accepted By: CITY OF CORPUS CHRISTI ;hi Jeff oym, PE By: Vice President, Corpus Christi Name: Title: Date: Exhibit A Page 2 of 2