This Task Order pertains to a Master Services Agreement for Professional Services by and between the City of
Corpus Christi,Texas(City)and LJA Engineering, (Consultant)dated June 19,2018(Agreement)by Motion No.
M2018-101. Consultant shall perform services on the project described below as provided in this Task Order and in
the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon
execution, this Task Order shall supplement the Agreement as it pertains to the project described below.
PROJECT NAME/NUMBER: 18100A Citywide Storm Water Infrastructure Rehabilitation
(Williams Ditch Phase 1 Studyl
1. PROJECT DESCRIPTION:The project scope includes the development and implementation of a City-wide
Storm Water infrastructure rehabilitation and replacement program.
2. SCOPE OF SERVICES: The scope of services is more fully described in Exhibit A.
3. COMPENSATION: The total amount not to exceed $41,620.00.
This Task Order is approved, and Consultant may proceed. All other terms and conditions of the Agreement
remain in full force and effect.
CITY OF CORPUS CHRISTI LJA ENGINEERING
/Digb IIy sgro1 by Jeff Edmonds DevaJy signed by JO Coy.
DN:cr=Jeff Edrnorrds,o, DN orr Jell Coym 0.Ou=LJA
=Eg,eaN�. Jeff Coym E �
ByeffrOYe(�aT:;cam.crus emsblmrofkba mm,c=US
Date:2019.12.11 12Sa:19.000o• Date:2019 12 a 15 33 56.0600
Jeff H. Edmonds, P.E. Date Jeff Coym, P.E. Date
Director of Engineering Services Vice President
5350 S. Staples Street, Suite 425
Corpus Christi, TX 78411
(361) 991-8550
jcoym@lja.com
Task Order No 7
CANED
I Accounting Unit: 3495-043
Account: 550950
Activity: 18100-A-3495-EXP
Account Category: 50950
Fund Name: SW 2012B RVBD
Amount: $41,620.00
Task Order No.7
Page 2 of 2
114
5350 South Staples Street,Suite 425,Corpus Christi,Texas 784U
LJA ENGINEERING t 361.991.8550 LJA.com TBPE F-1386 TBPLS 10016600
November 21, 2019 FEE PROPOSAL
Jeff Edmonds, PE
Director of Engineering Services
City of Corpus Christi
PO Box 9277
Corpus Christi, Texas 78469-9277
Re: Proposal for Task Order#7 —Williams Ditch Phase 1 Study
Citywide Storm Water Infrastructure Rehabilitation/Replacement
Master Service Agreement (MSA)
City Project No. 18100A
LJA Proposal No. 18-01195-TO7
LJA Project No. C007-21078
Dear Mr. Edmonds:
LJA Engineering, Inc. (LJA) is pleased to provide this proposal for investigation and preparation
of a drainage study for the referenced project. The following is the scope of services we
anticipate will be required.
SCOPE OF SERVICES:
For Task Order #7 LJA will conduct an investigation and prepare a drainage study analysis to
evaluate the cost, feasibility and environmental impact associated with two options for improving
tailwater conditions of the Williams Ditch. The first option will evaluate hand clearing, grubbing
and brush removal of the densely vegetated outfall area. The second option will evaluate
mechanically clearing an area to facilitate a channelized continuation of the ditch to the TxDOT
culverts crossing under S.P.I.D. Pre and post improvement flow analysis along with
construction costs for each option will be presented in a Technical Memorandum. We intend to
perform the following tasks to achieve the scope mentioned above:
100 Meetings with City Staff and internal project coordination
200 Review existing data and record drawings
300 Environmental permitting analysis and identification of plant species
400 Wetland determination
500 Aerial drone lidar compilation and on the ground control surveying
600 Preparation of Draft Technical Memorandum to include two options for improving
tailwater conditions at the outfall of the Williams Ditch and the following associated
information for each option:
• Pre and post flow analysis
• Recommendation of improvements and associated cost estimates
• Easement acquisition discussion
• Environmental impact discussion
700 Address City Comments and Prepare Final Technical Memorandum
R:\BP'S-OPPORTUNITIES(ENGINEERING)\2019\18-01195-707-Task Order No.7(Williams Ditch Phase 1 Study)\18-01195-107-Proposal Letler.docx Exhibit A
Page 1 of 2
Mr. Jeff Edmonds, PE
November 21, 2019
Page 2 of 2
ITEMS TO BE PROVIDED BY THE CITY:
• Existing Record Drawings of Drainage Facilities, Subdivisions, Street Projects and
Private Developments in the Subject Area as available
SCHEDULE:
Notice to Proceed TBD
Project Kick Off Meeting 1 Week After NTP
Field Investigation and Data Gathering 3 Weeks After NTP
Deliver Draft Drainage Study Report and Recommendations 5 Weeks After NTP
City Staff Review and Comments 1 Weeks After Draft Submittal
Deliver Final Drainage Study Report and Recommendations 1 Week After Receiving City Comments
FEE ANALYSIS:
We propose to provide these services for a fixed fee of $41,620.00 and as summarized in the
Table below.
DESCRIPTION NOT TO EXCEED AMOUNT
Maximum Contract Per Initial MSA Contract $500,000.00
Task Order No. 1 $46,645.00
Task Order No. 2 $33,375.00
Task Order No. 3 $28,190.00
Task Order No. 4 $46,090.00
Task Order No. 5 $14,200.00
Task Order No. 6 $5,895.00
Task Order No. 7 $41,620.00
Remaining MSA Contract Amount $283,985.00
If this proposal meets with your approval, your signature below will be sufficient authorization to
commence the work. We appreciate the opportunity to submit this proposal and look forward to
working with you on completion of this project. If you have any questions, please feel free to
contact me at any time at 361.991.8550 or by email at jcoym(c�lja.com.
Sincerely, Accepted By:
CITY OF CORPUS CHRISTI
`Je roym, PE By:
Vice President, Corpus Christi
Name:
Title:
Date:
Exhibit A
R:1BP'S-OPPORTUNITIES(ENGINEERING)12019118-01195-T07-Task Order No.7(Williams Ditch Phase 1 Study)118-01195-T07-Proposal Letter.docx Page 2 of 2