Loading...
HomeMy WebLinkAboutC2019-647 - 12/11/2019 - NA TASK ORDER NO. 7 This Task Order pertains to a Master Services Agreement for Professional Services by and between the City of Corpus Christi,Texas(City)and LJA Engineering, (Consultant)dated June 19,2018(Agreement)by Motion No. M2018-101. Consultant shall perform services on the project described below as provided in this Task Order and in the Agreement. This Task Order shall not be binding until it has been properly signed by both parties. Upon execution, this Task Order shall supplement the Agreement as it pertains to the project described below. PROJECT NAME/NUMBER: 18100A Citywide Storm Water Infrastructure Rehabilitation (Williams Ditch Phase 1 Studyl 1. PROJECT DESCRIPTION:The project scope includes the development and implementation of a City-wide Storm Water infrastructure rehabilitation and replacement program. 2. SCOPE OF SERVICES: The scope of services is more fully described in Exhibit A. 3. COMPENSATION: The total amount not to exceed $41,620.00. This Task Order is approved, and Consultant may proceed. All other terms and conditions of the Agreement remain in full force and effect. CITY OF CORPUS CHRISTI LJA ENGINEERING /Digb IIy sgro1 by Jeff Edmonds DevaJy signed by JO Coy. DN:cr=Jeff Edrnorrds,o, DN orr Jell Coym 0.Ou=LJA =Eg,eaN�. Jeff Coym E � ByeffrOYe(�aT:;cam.crus emsblmrofkba mm,c=US Date:2019.12.11 12Sa:19.000o• Date:2019 12 a 15 33 56.0600 Jeff H. Edmonds, P.E. Date Jeff Coym, P.E. Date Director of Engineering Services Vice President 5350 S. Staples Street, Suite 425 Corpus Christi, TX 78411 (361) 991-8550 jcoym@lja.com Task Order No 7 CANED I Accounting Unit: 3495-043 Account: 550950 Activity: 18100-A-3495-EXP Account Category: 50950 Fund Name: SW 2012B RVBD Amount: $41,620.00 Task Order No.7 Page 2 of 2 114 5350 South Staples Street,Suite 425,Corpus Christi,Texas 784U LJA ENGINEERING t 361.991.8550 LJA.com TBPE F-1386 TBPLS 10016600 November 21, 2019 FEE PROPOSAL Jeff Edmonds, PE Director of Engineering Services City of Corpus Christi PO Box 9277 Corpus Christi, Texas 78469-9277 Re: Proposal for Task Order#7 —Williams Ditch Phase 1 Study Citywide Storm Water Infrastructure Rehabilitation/Replacement Master Service Agreement (MSA) City Project No. 18100A LJA Proposal No. 18-01195-TO7 LJA Project No. C007-21078 Dear Mr. Edmonds: LJA Engineering, Inc. (LJA) is pleased to provide this proposal for investigation and preparation of a drainage study for the referenced project. The following is the scope of services we anticipate will be required. SCOPE OF SERVICES: For Task Order #7 LJA will conduct an investigation and prepare a drainage study analysis to evaluate the cost, feasibility and environmental impact associated with two options for improving tailwater conditions of the Williams Ditch. The first option will evaluate hand clearing, grubbing and brush removal of the densely vegetated outfall area. The second option will evaluate mechanically clearing an area to facilitate a channelized continuation of the ditch to the TxDOT culverts crossing under S.P.I.D. Pre and post improvement flow analysis along with construction costs for each option will be presented in a Technical Memorandum. We intend to perform the following tasks to achieve the scope mentioned above: 100 Meetings with City Staff and internal project coordination 200 Review existing data and record drawings 300 Environmental permitting analysis and identification of plant species 400 Wetland determination 500 Aerial drone lidar compilation and on the ground control surveying 600 Preparation of Draft Technical Memorandum to include two options for improving tailwater conditions at the outfall of the Williams Ditch and the following associated information for each option: • Pre and post flow analysis • Recommendation of improvements and associated cost estimates • Easement acquisition discussion • Environmental impact discussion 700 Address City Comments and Prepare Final Technical Memorandum R:\BP'S-OPPORTUNITIES(ENGINEERING)\2019\18-01195-707-Task Order No.7(Williams Ditch Phase 1 Study)\18-01195-107-Proposal Letler.docx Exhibit A Page 1 of 2 Mr. Jeff Edmonds, PE November 21, 2019 Page 2 of 2 ITEMS TO BE PROVIDED BY THE CITY: • Existing Record Drawings of Drainage Facilities, Subdivisions, Street Projects and Private Developments in the Subject Area as available SCHEDULE: Notice to Proceed TBD Project Kick Off Meeting 1 Week After NTP Field Investigation and Data Gathering 3 Weeks After NTP Deliver Draft Drainage Study Report and Recommendations 5 Weeks After NTP City Staff Review and Comments 1 Weeks After Draft Submittal Deliver Final Drainage Study Report and Recommendations 1 Week After Receiving City Comments FEE ANALYSIS: We propose to provide these services for a fixed fee of $41,620.00 and as summarized in the Table below. DESCRIPTION NOT TO EXCEED AMOUNT Maximum Contract Per Initial MSA Contract $500,000.00 Task Order No. 1 $46,645.00 Task Order No. 2 $33,375.00 Task Order No. 3 $28,190.00 Task Order No. 4 $46,090.00 Task Order No. 5 $14,200.00 Task Order No. 6 $5,895.00 Task Order No. 7 $41,620.00 Remaining MSA Contract Amount $283,985.00 If this proposal meets with your approval, your signature below will be sufficient authorization to commence the work. We appreciate the opportunity to submit this proposal and look forward to working with you on completion of this project. If you have any questions, please feel free to contact me at any time at 361.991.8550 or by email at jcoym(c�lja.com. Sincerely, Accepted By: CITY OF CORPUS CHRISTI `Je roym, PE By: Vice President, Corpus Christi Name: Title: Date: Exhibit A R:1BP'S-OPPORTUNITIES(ENGINEERING)12019118-01195-T07-Task Order No.7(Williams Ditch Phase 1 Study)118-01195-T07-Proposal Letter.docx Page 2 of 2