Loading...
HomeMy WebLinkAboutC2019-672 - 12/19/2019 - NA CITY OF CORPUS CHRISTI AMENDMENT NO. 2 CONTRACT FOR PROFESSIONAL SERVICES The City of Corpus Christi,Texas,a Texas home-rule municipal corporation ("City")and LNV, Inc.("Consultant"), agree to the following amendments to the Contract for Professional Services for Airline Road from SPID to McArdle Road(Bond 2018, Prop B)(Project No. 18004A): Original Contract April 26, 2019 Administrative Approval $49,900.00 Amendment No. 1 June 11, 2019 Motion M2019-088 $349,220.00 In the Original Contract,Article I Scope of Services shall be amended as set forth in the attached Amendment No. 2, Exhibit"A". In the Original Contract, Article III Compensation shall be amended based on the modified scope of services in the attached Amendment No. 2, Exhibit "B" for a fee not to exceed $11,000, for a total restated fee not to exceed $410,120. All other terms and conditions of the April 26, 2019 Contract for Professional Services between the City and Consultant,and of any amendments to that contract,which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPUS HRI I NV, ; . /Pi& Mark Van Vleck ate a41 S. Leyendecker, P.E. Date Assistant City Manager President 801 Navigation, Suite 200 Corpus Christi, TX 78408 APPROVED AS TO LEGAL FORM (361) 883-1984 Aimee Alcorn-Reed danl@Invinc.corn 2019.12.12 12:15:35-06'00' Assistant City Attorney Date ¶ w4 (afrfimartl.„ /4 ST ecretary Date Fund Name Accounting Unit Account_ Activity Total Storm Water 2012A RVBD 3494-043 550950 18004-A-3494-EXP $11,000 Total $11,000 SCANNED LNV So utions Today with a engineers architects contractors Vision for Tomorrow November 11, 2019 J.H. Edmonds, P.E. Director of Engineering Services City of Corpus Christi P.O. Box 9277 Corpus Christi, TX 78469-9277 Re: CITY OF CORPUS CHRISTI Airline Road — SPID to McArdle Road (Bond 2018) City Project No. 18004A LNV Proj. No. 190059.000.2 Contract Amendment No. 2 Dear Mr. Edmonds: As requested by the City Project Manager, LNV has prepared this Small AE Contract Amendment No. 2 (CA#2) for the Airline Road — SPID to McArdle Road (Bond 2018) Project (No. 18004A). The purpose of CA#2 is to provide funds to re-design the proposed stormwater infrastructure in order to avoid conflict with the existing AT&T duct bank that runs beneath Airline Road on the west side of the street. The profile of the existing duct bank was just recently provided to the City and LNV by AT&T. Under CA#2, LNV will perform the services described below for a Lump Sum fee of $11,000 to be added to the current Design Phase fee. Project Description: The City of Corpus Christi, Texas, hereinafter called "City", and LNV, Inc., hereinafter called "Engineer", agree to the following contract for engineering and consulting services to perform tasks related to the Design Phase of the Project as listed below. Scope of Services: The Engineer's Scope of Services for CA#2 includes the following: 1. Re-Desian the Proposed Stormwater Infrastructure, LNV will revise the design of the proposed stormwater infrastructure in order to avoid conflict with the existing AT&T duct bank. Re-design efforts will include lowering of the proposed 36" RCP profile; revising the 24" RCP laterals to 18" RCP laterals; revising the stormwater lateral profiles; and, revising all associated construction plan sheets. 2. Re-auantification and Contract Document Revisions, Upon completion of the revised design of the proposed stormwater infrastructure, LNV will re-quantify the proposed stormwater infrastructure, revised the Opinion of Probable Construction Cost, and revise the Contract Bid Form and other associated Contract documents. Engineering services not listed above, or in the Scope of Services of the Original Contract, as amended, are excluded from the Scope of Work of this Contract Amendment. CONTRACT AMENDMENT NO.2 EXHIBIT"A" 801 NAVIGATION I SUITE 200 I CORPUS CHRISTI,TEXAS 78408 Page 1 of 2 OFFICE 361 883.1984 I FAX 361.883.1986 I WWW.LNVINC.COM Mr. Jeffrey Edmonds, P.E. Airline Road—SPID to McArdle Road (Bond 2018) November 11, 2019 Contract Amendment No. 2 (18004A) Deliverables & Schedule: The deliverables associated with CA#2 will be included in the 100% Submittal Package. No separate deliverables are included with CA#2. If CA#2 is executed and LNV is issued a Notice to Proceed early this week, LNV can perform the proposed revisions and submit the 100% Submittal Package by Friday, November 22, 2019. Fees: Engineering efforts associated with CA#2 as described herein will be performed for a Lump Sum fee of $11,000 to be added to the current Design Phase fee. If you have any questions, please call me at 361-883-1984. Sincerely, LNV, Inc. TBPE Firm No. F-366 r 1 D. Scott Jones, P.E Senior Project Manager DSL/dsj CONTRACT AMENDMENT NO.2 EXHIBIT"A" Page 2 of 2 Airline Road from SPID to McArdle Road (Bond 2018, Prop B) Project No. 18004A Summary of Fees LNV, Inc. Original Contract Amendment No. 1 Amendment No. 2 Total Street Street Storm Water Water Total Storm Water Basic Services 1 Preliminary Phase $41,900.00 $17,104.00 $5,798.00 $6,088.00 $28,990.00 $0.00 $70,890.00 2 Design Phase 0.00 120,413.00 40,818.00 42,859.00 204,090.00 11,000.00 215,090.00 3 Bid Phase 0.00 10,526.00 3,568.00 3,746.00 17,840.00 0.00 17,840.00 4 Construction Phase (T&M) 0.00 23,600.00 8,000.00 8,400.00 40,000.00 0.00 40,000.00 Subtotal Basic Services 41,900.00 171,643.00 58,184.00 61,093.00 290,920.00 11,000.00 343,820.00 Additional Services 1 Permit Preparation TXDOT Coordination 0.00 4,560.00 0.00 0.00 4,560.00 0.00 4,560.00 TDLR Review and Registration 0.00 2,010.00 0.00 0.00 2,010.00 0.00 2,010.00 2 Topographic and ROW Survey 8,000.00 10,242.00 3,472.00 3,646.00 17,360.00 0.00 25,360.00 ROW/Easement Acquisition Survey 3 and Parcel Descriptions (T&M) 0.00 5,900.00 2,000.00 2,100.00 10,000.00 0.00 10,000.00 4 Environmental Issues 0.00 2,466.00 836.00 878.00 4,180.00 0.00 4,180.00 5 Public Involvement 0.00 7,882.00 2,672.00 2,806.00 13,360.00 0.00 13,360.00 6 Subsurface Utility Investigation (Level 0.00 TBD TBD TBD TBD 0.00 0.00 A) (TBD) (oBnsstruction Observation Services 7 0.00 TBD TBD TBD TBD 0.00 0.00 8 Warranty Phase (TBD) 0.00 TBD TBD TBD TBD 0.00 0.00 9 Televising Utility Lines (TBD) 0.00 TBD 0.00 0.00 0.00 0.00 0.08 Electrical Evaluation and Design for 10 Pedestrian Push Button Improvements 0.00 6,830.00 0.00 0.00 6,830.00 0.00 6,830.00 at Airline/McArdle Intersection Subtotal Additional Services 8,000.00 39,890.00 8,980.00 9,430.00 58,300.00 0.00 66,300.00 Total Authorized Fee $49,900.00 $211,533.00 $67,164.00 $70,523.00 $349,220.00 $11,000.00 $410,120.00 04/26/19 06/11/19 D Admin. Approval M2019-088 Admin. Approval - X m co m = v - ED• o N