Loading...
HomeMy WebLinkAboutC2021-179 - 7/20/2021 - ApprovedREVIEWED CITY OF CORPUS CIIRIS'1'I ENGINEERING SERVICES CnANGEORDER PROJECT: Scrwall Capital Rapmrs (Type A pond) CHANGEORDER NO: I CONT'ItAcTOR: Western Specialty ConOuctos CHANGE ORDER DATE: 6/11/2021 ENGINEER: Munoz Engineering, LLC PROJISCFNUMBER: E17041 PROJECTMANAGER: Ryan llulrick ORIGINAL CONTRACT I INIE: 160 CD's %take the rollnwing: ddilinns, modifications ordeletions to the work described in the Contract Dncnmenh: ADDITIONS Quantity Unit Unit Price Total RF12: Pressure Washing n15.01 Possnan walking Sunwnll (Panne l-222) I PPP S 110,000.00 S 110,000.00 DI5.02 I'ressure WasM1ing Sidewalk (Panels I-222) I FVP S 40,000,00 S 40,000.00 D15.03 Pressure W.A.(9) klimJars(Pasels 1-222) 1 Flip S 12,500.00 S 12,500,00 AdditionalCalndmlhysducto:adddSrnp:af Wark 14 DAY S . S - Additions 'Front: S 162,500.00 DELETIONS none n'a Additional Calendar Days rapmsled I4 IS Deletions Total: NEI" FOrALOFTIIISCDANGEORDER: S 162,500.01) 'lire Seawall, khradoes (to include the Selena Memorial) and the adjoining sidewalk are in need of cloning to remove dirt and debris dot have eollacd over We years This change order covers the addition of press, washing for die aforementioned areas the work will raryire a 14 day contract day extension. Me emryavarian greed upon in this Change Order lr frog rompla - and(aalpaymetrrfor all cash the C•ontracmrmay Incur "a result oforrelaling to this change whethersaid costr are known, unhnown, foreseen or unf'tsem attlois dme, lactadiog witluua Ilnthntlun, any cost far delay. extouled averheuQ ripplear imp retcusl, or arty othaeffect on c/mngedor unchanged mark as a result olOdr Cluster Order. Original Contract Ano,ml Maximum Change Order Contingency Amount (25 0) Remaining Available Contingency Amount (including this CO) Previously Approved Change Drier Amotm Proposed Change Order Ammml Revised Contract Amount Percad of'1'akal Change Orders (including rids CO) Original Camera Time has Substantial Completion Notice to Proceed Dulc Original Substaoi:d( pleiian Date Prianouly Approved Change Order Time Additional'1'ind as This Change Order Revised Causer Time Ibr Substantial Complaint Revised Substantial Cnnmlei0n Data REVIEWED BY: Fng. 1'mj. Spccialia Slcplon.Garcia Constr. Supervisor Annie Wnjlasczyk Crasu, Inspector Thomas Steiner Conslr. Sr. I'mjccl Mgr. lid Sanchez Initial Date SU 6/27/2021 ADW 6/22/2021 T S. 6/22/2021 E. S. 6/22/2021 S 1098,5141.60 S 274,626.15 S 112,126.15 3 S 162,500.00 $ 1,261,004.60 14.791/ 160 CD's 4,292021 10M021 0 cut 14 CDS 174 CD's 1020R021 REQUESIED BY: Western Specialty Contractor Travis Grcbc Date Asdslam Manager Digitally signal N})§&Wtpus CI utlS'fI Brett Van SEAWALL CIP FUND Van Hazel FUND: 07 n/a Hazel Date: 2021.06.23 55091 RECOMMENDED In': 13:34:55-05'00' ACTIVITY: E17041-01-3271-EXP 1 11/11 Drelt Van 113'el note AMOUNT: $162 500.00 n/a ('onslnmlinn linginccr Digitally signed by Jeff Edmonds Date: 2021.06.24 REC031MENDED In: 14:0152-05'00' AI'I'ItOVk:U It1': Ii•...�s / s^/"�.� Y'�r�� �t Jeff IL Edmonds Date klirhad Itndriguez Inatc Direaor 0 lnein"nag Sen ice. Chief (d Sind ( 1, / ., DN:crlysgnecll Kent Mcityar DNeta=%enredbyKn, oa, RECOMMENDED RV: Electronic Approval 6/24/2021 !t%l)/j-=/aL`V/l]__ APPROVED AS pO— en,41=1entmrdrrexaa.ram, c=DS 3:4s35 F'ddir lloulihan Dircchtr Uuh pOR3I: Kent Mcllyar Date Management card Du Ig � ,(,Q� I AU I M/15.)VTWnut City Mhmn y. ATTEST, `r " �. tY C�111NCIL ' a0" �Vna1L RE ECCA HUERTA . CITY SECRETARY /5L