HomeMy WebLinkAboutC2021-256 - 10/12/2021 - ApprovedPROJECT:Holly Road (SH 286 to Greenwood Drive) (Bond 2012)CHANGE ORDER NO: CONTRACTOR:Jhabores Construction Company Inc.CHANGE ORDER DATE: ENGINEER:LNV (Ardurra)PROJECT NUMBER: PROJECT MANAGER:Mai Bernal ORIGINAL CONTRACT TIME:300 CD's ADDITIONS HOLLY 24" CASING INVESTIGATION Quantity Unit Unit Price PART F - WASTEWATER IMPROVEMENTS F1 Mobilization (5% Max. Part F)0.07710 LS $ 75,000.00 F14.12 Post TVI of Sewer Main 460 LF $ 3.54 F14.13 Install 15" SDR 26 with Casing Spacers 410 LF $ 170.69 F14.14 Install New MH 4" Dia. East Side 0-6" Depth 1 EA $ 14,836.90 F14.15 Extra Depth MH 5 VF $ 999.90 F14.16 Connect to Existing MH 2 EA $ 6,756.90 F14.17 16" DR 26 by Open Cut 60 LF $ 496.92 F14.18 Sidewalk Removal and Replacement 1 LS $ 2,525.00 F14.19 Barricades/Traffic Control East Side 1 LS $ 6,810.43 F14.20 Cut, Cap & install 2" Bypass on Waterline 2 EA $ 3,619.84 -Fiber to be Adjusted for Open Cut (by others, if required)1 LS $ - F14.21 Reinstall Waterline 100 LF $ 96.96 -West Side Conflicts 1 LS $ - F14.22 Remove and Replace 24' RCP 16 LF $ 205.03 Additional Calendar Days due to: Added Scope of Work 42 DAY $ - Additions Total: DELETIONS none 1 n/a 0 LS $ - Deletions Total: Additional Calendar Days requested 42 NET TOTAL OF THIS CHANGE ORDER: This Change Order authorizes the installation of a 15-inch wastewater main in an existing 24-inch casing running from the Westside to Eastside under Crosstown Expressway at Holly Road. Original Contract Amount Maximum Change Order Contingency Amount (25%) Remaining Available Contingency Amount (including this CO) Previously Approved Change Order Amount Proposed Change Order Amount Revised Contract Amount Percent of Total Change Orders (including this CO) Original Contract Time for Substantial Completion CD's Notice to Proceed Date Original Substantial Completion Date Previously Approved Change Order Time CD's Additional Time on This Change Order CD's Revised Contract Time for Substantial Completion CD's Revised Substantial Completion Date CITY OF CORPUS CHRISTI ENGINEERING SERVICES CHANGE ORDER 11/25/2021 $ 492,355.17 $ - $ 170,108.24 Why was this Change necessary: This Contract Modification represents Final Adjustment for any and all amounts due or to become due to Contractor for changes referred to herein. Contractor further releases all other claims, if any (except those claims previously submitted in writing in strict accordance with the Contract), for additional compensation under this Contract, including without limitation any rights Contractor may have for additional compensation arising out of delays or disruption of Contractor's schedule as may have arisen prior to the date of this Contract Modification. Unless otherwise expressly provided herein, the time of completion and all other terms and conditions of the Contract remain unchanged. $ 3,349,518.32 $ 837,379.58 9/28/2020 7/25/2021 $ 13,513.80 $ 29,815.20 $ 7,239.68 $ 9,696.00 $ 2,525.00 $ 6,810.43 $ - $ 3,280.48 $ - $ - $ 4,999.50 9/23/2021 Make the following additions, modifications or deletions to the work described in the Contract Documents: $ 5,782.25 $ 1,626.10 $ 69,982.90 $ 14,836.90 Total 4 6470 $ 170,108.24 $ - 81 42 423 $ 174,916.17 $ 170,108.24 $ 3,694,542.73 10.30% 300 Page 1 of 2 DocuSign Envelope ID: A7F49E5B-6F2E-47F6-8D6E-231973CF9C31 Brett Van Hazel Digitally signed by Brett Van Hazel Date: 2021.10.04 16:27:30 -05'00' n/a n/a DocuSign Envelope ID: A7F49E5B-6F2E-47F6-8D6E-231973CF9C31 10/6/202110/6/2021 10-12-2021 M2021-189 10/13/2021 10/14/2021 Jhabores Construction Company, Inc. P.O. Box 60089 Corpus Christi, Texas 78466 361-852-8858 Fax 361-852-7979 PROJECT#: 6470 Construction Proposal HOLLY 24" CASING INVESTIGATION CITY OF CORPUS CHRISTI CONSTRUCTION SERVICES CORPUS CHRISTI, TEXAS Attn: MR. DAVID THORNBURG DavidTH@cctexas.com HOLLY 24" CASING INVESTIGATION HOLLY ROAD AND 286 ID# Description Quantity Fl 4-MOBILIZATION EAST SIDE OF 286@HOLL Y 0.07710 LS F14.12 2 POST TVI OF SEWER MAIN 460.00 LF F14.13 J INSTALL 15" SDR 26 WITH CASING SPACERS 410.00 LF F14.14 4 INSTALL NEW MH 4' DIA. EAST SIDE 0-6' DEPTH 1.00 EA F14.15 � EXTRA DEPTH MH 5.00 VF F14.16 e CONNECT TO EXISTING MH 2.00 EA F14.17 'l 16" DR 26 BY OPEN CUT 60.00 LF F14.18i SIDEWALK REMOVAL AND REPLACEMENT 1.00 LS Fl4.19 Q BARRICADES /TRAFFIC CONTROL EAST SIDE 1.00 LS F14.20 40 CUT ,CAP & INSTALL 2" BYPASS ON WATERLINI 2.00 EA 11 FIBER TO BE ADJUSTED FOR OPEN CUT 1.00 LS F14.21 � REINSTALL WATERLINE 100.00 LF 12 WEST SIDE CONFLICTS 0 F14.22 � REMOVE AND REPLACE 16' OF 24" RCP 16.00 LF Unit Price $75,000.00 $3.54 $170.69 $14,836.90 $999.90 $6,756.90 $496.92 $2,525.00 $6,810.43 $3,619.84 BY OTHERS $96.96 $205.03 Totp� Bid Amount �6,:-J � "2.. Q.� 't>� t)Q. "\ '°'°' /1,oz.\30 WORKING DAYS TO COMPLETE AFTER RE IPT OF PIPE 02-Sep-21 Ext Price Totals(incl. bond 1%) $5,782.25 $5,782.25 $1,626.10 $1,626.10 $69,982.90 $69,982.90 $14,836.90 $14,836.90 $4,999.50 $4,999.50 $13,513.80 $13,513.80 $29,815.20 $29,815.20 $2,525.00 $2,525.00 $6,810.43 $6,810.43 $7,239.68 $7,239.68 BY OTHERS $9,696.00 $9,696.00 $3,280.48 $3,280.48 $170,108.24 PIPE PRICE GOOD FOR 4 DAYS FROM PROPOSAL DATE. PIPE MUST BE ORDERED WITHIN THE NEXT 4 DAYS TO GUARANTEE AVAILABILITY. IF ORDERED AS REQUIRED PIPE SHOULD DELIVER IN OCTOBER. CANNOT GURANTEE LESS THAN 5% SAGS ON SEWERLINE INSTALLED IN CASING BECAUSE IT WAS INSTALLED BY OTHERS FIBER MAY NEED TO BE ADJUSTED FOR INSTALLAT_ION OF 60' OF 15" SOR 26 WILL BE BY OTHERS 6" GAS LINE MAY CONFLICT WITH INSTALLATION OF 15" SOR 26 AT EXISTING MH DUE TO DEPTH CASING SP�iRS ARRIVE TWO WEEKS AFTER ORDER PLACED PIPE MID OCTOBERWORKING/ � s oo NOT INCLuoyNv M>.\U:TI'.Ts OF EXISTING UTILITIES sv OTHERS IF REQUIRED GREGO Y Confidential Bid Proposal Page 1 DocuSign Envelope ID: A7F49E5B-6F2E-47F6-8D6E-231973CF9C31