HomeMy WebLinkAbout033032 ORD - 05/09/2023Ordinance approving the amended Tax Increment Reinvestment Zone #3 Project & Financing Plans as approved by the Board of Directors of Reinvestment Zone Number Three, City of Corpus Christi, Texas on March 28, 2023, which amends the Downtown Living Initiative and Streetscape and Safety Improvement programs, adds eligible projects for public space, right-of-way, and streetscape development, and adds an additional incentive program named the Targeted Office to Residential Conversion Program. WHEREAS, in 2008, through Ordinance 027996, the City of Corpus Christi created a tax increment financing district, to be known as "Reinvestment Zone Number Three, Corpus Christi, Texas," over a portion of the city that includes the City's downtown area; WHEREAS, Ordinance 027996 included a preliminary reinvestment zone financing plan; WHEREAS, on August 25, 2015, the City Council passed Ordinance 030592, which approved the "Tax Increment Reinvestment Zone #3 Amended Project & Financing Plan;" WHEREAS, the "Tax Increment Reinvestment Zone #3 Amended Project & Financing Plan" was last amended by City Council on December 20, 2022; WHEREAS, on March 28, 2023, the Board of Directors of Reinvestment Zone Number Three passed a motion recommending an amendment to the "Tax Increment Reinvestment Zone #3 Amended Project & Financing Plan" that amends the Downtown Living Initiative and Streetscape and Safety Improvement programs, adds eligible projects for public space, right-of-way, and streetscape development, and adds an additional incentive program named the Targeted Office to Residential Conversion Program; WHEREAS, Texas Tax Code Section 311.011(d) provides that the governing body of the municipality that designated the zone must approve a project plan for a reinvestment zone by ordinance. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL FOR THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. The City Council approves the Project Plan and Reinvestment Zone Financing Plan for Tax increment Reinvestment Zone #3, Corpus Christi, Texas for the Reinvestment Zone Number Three, City of Corpus Christi, Texas, as approved by the Board of Directors of Reinvestment Zone Number Three on March 28, 2023. A copy of the Plan is attached hereto and incorporated by reference. 033032 SCANNED That the foregoing ordinance was read for the first time and passed to its second reading on this the )6 day of Apr; r 4 Paulette Guajardo Roland Barrera Sylvia Campos Gil Hernandez Michael Hunter n , 2023, by the following vote: Jim Klein Mike Pusley Everett Roy Dan Suckley Thatfle foregoing ordinance was read for the second time and passed finally on this the 1day of c-1 , 2023, by the following vote: Paulette Guajardo Roland Barrera Sylvia Campos Gil Hernandez Michael Hunter ;NThwN- Jim Klein 1 7 Mike Pusley A d Everett Roy Ay, Dan Suckley PASSED AND APPROVED on this the "t day of i ' , , 2023. ATTEST: e-04-W/N- 1661-6C12;l4pa441 Rebecca Huerta Paulette Guajardo City Secretary Mayor 033032 City of Corpus Christi / Corpus Christi Downtown Management District Downtown Corpus Christi Tax Increment Reinvestment Zone #3 Project and Financing Plan '1 City of Corpus Christi / Corpus Christi Downtown Management District Contents Introduction 3 Criteria for Zone Creation 3 A Consistent Vision for Downtown 3 Anticipated Zone Role in Downtown Improvements 4 Project Plan 4 Existing Uses and Conditions/Boundaries §311.01 (b) (1) 4 SEA District - 4 Uptown — 5 Marina Arts District (Downtown Management District) — 5 South Downtown — 5 Municipal Ordinances §311.011 (b) (2) 6 City Planned Improvements (Non Project Costs) §311.011 (b) (3) 6 Relocation §311.011 (b) (4) 6 Financing Plan 6 Estimated Project Cost Description (§311.011 (c) (1) & Kind, Number and Location of TIRZ Improvements §311.001 (c) (2) 6 Economic Feasibility Study §311.011 (c) (3) 10 Estimate of Bonded Indebtedness §311.011 (c) (4) 11 Timing of Incurring Costs or Monetary Obligation §311.011(c) (5) 11 Method of Financing and Sources of Revenue §311.011(c) (6) 11 Methods of Financing. 11 Sources of Revenue 11 Current Appraised Value & Estimated Captured Appraised Value §311.011(c)(7), (8) 12 Duration of the Zone §311.011(c)(9) 12 Exhibit B. - Legal Description of the Zone 14 Exhibit C. - Tracking List of Project Plan Changes By Year 16 Exhibit D. Downtown Development Projects 17 21 Page City of Corpus Christi / Corpus Christi Downtown Management District Introduction The Downtown Corpus Christi Tax Increment Reinvestment Zone #3 (TIRZ #3) will provide the programs, projects and financing needed to develop public improvements and support economic development activities associated with revitalization of the greater downtown Corpus Christi area. TIRZ #3 consists of a twelve person Board of Directors, is supported by the City's Economic Development staff and the Corpus Christi Downtown Management District (DMD). In 2008, through Ordinance 027996, the City of Corpus Christi created TIRZ #3 over a portion of the city that includes the DMD, as well as all blocks north east of Tancahua Street and Morgan Avenue. In 2015, Ordinance 03592 modified the scope of TIRZ #3, based on findings of the City's Downtown Area Development Plan (DADP). A timeline of subsequent amendments to this document can be found in Appendix. Criteria for Zone Creation The 2008 Project Plan stated that the defined area of TIRZ #3 qualifies for designation as a "Reinvestment Zone" because it suffers from "economic stagnation, inadequate infrastructure, and deteriorating properties. Without intervention by the public sector, private market forces will not be sufficient to generate significant development and redevelopment." Conditions that meet the Criteria of Chapter 311, Section 005 include: • A substantial number of substandard, slum, deteriorated, or deteriorating structures; • The predominance of defective or inadequate sidewalk or street layout; • Unsanitary or unsafe conditions; • The deterioration of site or other improvements; and • Conditions that endanger life or property by fire or other cause. According to Chapter 311, these conditions must "substantially arrest or impair the sound growth of the municipality or county creating the zone, retard the provision of housing accommodations, or constitute an economic or social liability and be a menace to the public health, safety, morals, or welfare in its present condition and use." A Consistent Vision for Downtown For decades, planning efforts have been made to improve and revitalize Downtown Corpus Christi, with various levels of success. The 2006 Downtown Redevelopment Vision resulted in the creation of TIRZ #3, but further implementation was limited. Other planning efforts have included: 2004— Bayfront Master Plan — City of Corpus Christi Planning Department 2006 — Downtown Redevelopment Report 2013 — Central Business Development Plan — City of Corpus Christi Planning Department 2014 — Regional Urban Design Assistance Team - UDAT 2014 — Three Year Strategic Plan — Downtown Management District 2015 — Downtown Area Development Plan — City of Corpus Christi Planning Department 2017 — Three Year Strategic Plan — Downtown Management District 2022 — 2027 Five Year Strategic Plan 3IP=ge City of Corpus Christi / Corpus Christi Downtown Management District The 2006 Redevelopment Report vision statement is consistent with the vision illustrated in the 2015 Downtown Area Development Plan. "Downtown Corpus Christi is a safe, clean, pedestrian friendly community comprised of a central business district, arts and culture, sports and entertainment areas. This unique vibrant waterfront community will provide local residents, tourists and families' opportunities to enjoy fine restaurants, shops and residential facilities." Anticipated Zone Role in Downtown Improvements The 2008 Market and Economic Study indicated the nature of the intervention and assistance needed to spur economic growth in different areas of TIRZ #3. It stated that the "current structure of Corpus Christi's economy, the aging of existing development, and inadequate public infrastructure and facilities together depress the viability of new development and redevelopment in Downtown." The 2014 Analysis of Residential Market Potential repeated those themes, with extra emphasis on residential development and introduction of the concept of gap financing. The primary functions of TIRZ #3 will be • To Support Private Sector Development & Investment • To Plan & Construct Public Improvements • To Provide Revitalization Focused Programs & Services The Zone is a key catalyst and funding source to change the public environment in Downtown. By establishing programmatic frameworks we are able to leverage private sector funding and serve the public purpose of eliminating blight. By improving and enhancing streets, sidewalks, and public spaces, and upgrading utilities, TIRZ #3 will facilitate vacant land development and the redevelopment or rehabilitation of existing uses. The intended result is a vibrant Downtown and economically vital urban waterfront district with a variety of residential, retail, and lodging uses, a strong office base, and popular public facilities. Project Plan Existing Uses and Conditions/Boundaries §311.01 (b) (1) TIRZ #3 includes approximately 856 acres wholly within the City of Corpus Christi. A very wide variety of land uses are present within the TIRZ. The boundaries and land uses within the Zone are shown in Exhibit A. The existing conditions within the Zone are described generally below. A legal description of the Zone with a specific accounting for the proposed boundaries is given in Exhibit B. In the 2015 DADP, the identities of neighborhoods in the Downtown were emphasized as way to build unifying identities and create distinct experiences. Each of those regions is described generally below. SEA District - A large area of publicly owned, cultural and entertainment facilities comprises the north end of the zone. These facilities include: • Port of Corpus Christi's Ortiz Center • Corpus Christi Museum of Science & History • Art Museum of South Texas 41 Page City of Corpus Christi / Corpus Christi Downtown Management District • Whataburger Field • Street Icehouse • American Bank Convention Center & Arena • Concrete Street Amphitheater • Harbor Playhouse • Railroad Seafood • Brewster • Heritage Park Moving south, the next few blocks vary between vacant, undeveloped land and low density residential, bordered to the west by Port facilities and storage space, southeast by the Port of Corpus Christi Offices and the Federal Courthouse. The southern portion of the SEA District also includes two restaurants, a vacant hotel, U -Haul, Fire Station #1 and the historic Nueces County Courthouse. IH 37 is the physical southern border of this area, with the transition from a highway to on and off ramps coming to surface grade. Uptown — South of IH 37, a natural bluff distinguishes the high-rise, office building core of the Uptown. Broadway Street marks a topographical change with a historically designated balustrade, one of the City's first infrastructure improvements. The higher elevation area to the west of the street north of Lipan Street is characterized mainly by professional office uses and 11 high-rise towers. TIRZ #3 picks up two blocks of Uptown, with Tancahua Street as the west border. Overall occupancy for the Downtown office market is around 70 percent. West of the TIRZ #3, Uptown continues to include major government anchors, including Corpus Christi Independent School District Offices, Nueces County Courthouse, a Regional Transportation Authority Service Center and Corpus Christi City Hall. Marina Arts District (Downtown Management District) — The area east of Broadway Street is lower in elevation and features a walkable pedestrian grid with a mix of land uses, including hotels, office, residential and retail. The boundary of this neighborhood is based on the petition of property owners that created the DMD in 1993. This area is the historic center of Corpus Christi, but many of the original buildings have been demolished, due to neglect or natural disasters. The last large wave of construction occurred in the 1980's. The most recent large scale private investment is a $27 million residential property with ground floor retail, the Cosmopolitan. The area is interspersed with surface parking lots and vacant, blighted property. In several places, public spaces and sidewalks are non existent or in deteriorated condition. Another unique feature of this neighborhood is the Corpus Christi Municipal Marina, spanning three man- made T -heads along the Bayfront. The Marina is comprised of over 600 slips, several restaurants and the Corpus Christi Yacht Club, the third oldest yacht club in the Gulf Coast. South Downtown — At Kinney Street, the Zone gets divided by a redundancy of roadways and a few vacant parcels. This portion of the Zone includes the YMCA, a Greek Orthodox Church, Episcopal Church, Methodist Church and several parks. Additionally, there is a mix of early 20th century single family homes and multi -family residential developments. The multi -family developments are truly a diverse mix, including high rise and mid -rise, market rate and affordable, ownership and rental, constructed at all different times with various architectural styles. Many of the original homes, especially at the south end of the neighborhood, have been converted to professional office use. This neighborhood would lend itself to the revitalization seen in older neighborhoods across the country, however an absence of neighborhood support services prevents the unification necessary to create this self identity. 51 Page City of Corpus Christi / Corpus Christi Downtown Management District A defining feature of this neighborhood is the 34 acres of park land called Water's Edge. The southeastern corner of the zone includes the Emerald Beach hotel and Marina del Sol condominiums. This neighborhood abuts the Christus Spohn Shoreline hospital complex. Christus Spohn Shoreline is just outside TIRZ #3 Boundaries and recently completed a $325 million upgrade. This area has had multiple district names.... Municipal Ordinances §311.011 (b) (2) Changes to municipal ordinances in TIRZ #3 may include: requirements for vacant buildings, requirements for vacant land, development codes to support residential and recreational activity, design requirements to support the downtown character. City Planned Improvements (Non -Project Costs) §311.011 (b) (3) The City operates a robust public improvement program, utilizing voter approved bond funds, capital improvement funds, and general fund improvements. Recently completed projects and planned projects are listed below. Project Source Timeframe Cost Status as of 1/2023 Shoreline Realignment Bond 2008 Ongoing $13,000,000 Done SEA District Pedestrian Bond 2012 2015-2016 $500,000 Done Improvements Chaparral Street Two Way Bond 2014 2015-2016 $9,000,000 Done Conversion Water Street Improvements Bond 2014 2015-2016 $5,000,000 Done Streetscape Improvements Bond 2014 2015-2015 $1,500,000 Done Wayfinding Program HOT Funds 2022 $500,000 In Progress Shoreline Crosswalks Bond 2018 2022 $850,000 In Progress Downtown Lighting Bond 2018 2023 $650,000 Pending Design Broadway Bluff Balustrade Bond 2022 2023 $2,600,000 Pending Design Stabilization Water Street Reimagined CIP & Estimated to Pending Design Future Bond Future cost $20,000,000 Relocation §311.011 (b) (4) No relocation of existing residents is anticipated to be required as part of the Project Plan. Financing Plan Estimated Project Cost Description (§311.011 (c) (1) & Kind, Number and Location of TIRZ Improvements §311.001 (c) (2) TIRZ #3 will participate in projects that support the development and economic activity projected in the DADP. With vast vacancy and deferred maintenance, these public private partnership programs provide frameworks that create a signal for private sector investment. The focus is on street level vibrancy, residential and mixed-use development. Generally, TIRZ #3 will aim to provide under 20% of project cost, but may provide up to 30% for catalytic projects and excessively blighted spaces. Exceptions may be made 61 Page City of Corpus Christi / Corpus Christi Downtown Management District to the guidelines below for catalytic projects with TIRZ #3 Board approval. The DMD is contracted through interlocal service agreement to manage the programs and initiatives below. Estimated project cost is $25 million, equivalent to the anticipated revenues. TIRZ #3 will make funding available for five targeted development programs and additional initiatives: 1. Targeted Vacant Property Improvement Grant Program (Created 2016) — This matching grant program will support and encourage private investment in the built environment along Chaparral Street and Mesquite Street. Due to its "Main Street" characteristics and its function of connecting the Marina Arts District and SEA Districts, Chaparral Street is a first phase priority for successful revitalization of TIRZ #3. Due to the vacancy rate and existing building stock along Mesquite, it is a second phase priority. TIRZ #3 will consider a 50/50, on renovation construction costs. 2. Commercial Finish -Out Grant Program (Created 2016) — To create more dining, retail and entertainment venues, TIRZ #3 will agree to reimburse approved new tenants and owner -occupied finish -outs at a maximum rate of $10 per square foot. For an owner -occupied business to qualify for finish out or remodels, the incentive, they must be established for at least 10 -years. Evidence of operation must be provided upon application submission. Qualified finish -out expenses include floor and wall upgrades, HVAC, kitchen equipment, and other permanent, semi-permanent fixtures. Grant is reimbursable to the Tenant, but written approval must come from Landlord in application. Landlord Policy — Due to severe lack of building maintenance, many buildings require significant mechanical, electrical, or plumbing repairs that cannot be funded by a small business tenant. Thus, 50% of Mechanical, Electrical or Plumbing Costs (Up to $20,000) will be available to the landlord with a new tenant if that landlord provides a 6 -month rent waived lease on first -floor, active street use projects. Micro Grant Policy - smaller scale, expedited $10,000 micro -grants can be approved by the City Manager, or his designee, and administered by DMD and City Staff. Approved agreements will be reported to TIRZ #3 Board at the next Regular Meeting following award. 3. Downtown Living Initiative (Created 2016) — The DADP stated that over the next 5 years, 1,850 new units could be absorbed in the greater downtown if the investor return made investment attractive. This figure has been confirmed in subsequent residential demand studies. To stimulate development, TIRZ #3 will provide a $30,000 per unit reimbursement grant for multi -family developments of over 3 units that meet the required design criteria. Additional per unit funds may be allocated, up to 30% of the per unit development cost for vacant building rehabilitation, office conversion or new construction. Depending on the scale of the project, this may be paid in a lump sum or over a period of several years from increment generated by the project. 4. Project Specific Development Agreement (Created 2016) — In situations where higher development costs create a financing gap, TIRZ #3 can provide assistance to property owners or developers through a Development Agreement for reimbursement of net new tax increment. A pro -forma is required to qualify for up to 75% reimbursement of the new taxes for 10 years if a development is 5,000 sq. ft or creating 25 or more new residential units. If further gap exists, staff will undertake additional third 71 Page City of Corpus Christi / Corpus Christi Downtown Management District party review to justify any additional reimbursement, based on the "but, for" principle. The qualifying cost elements for this Program include: • Environmental Remediation/Code Compliance • Historic Preservation • Structured Parking • Urban Design/Landscaping • Public Improvements/Utilities 5. Streetscape and Safety Improvement Program (Created 2018) — Following the 2017 Traffic & Planning Analysis, TIRZ #3 created a program to assist with improvements that increased quality of streetscapes and safety in the zone. This includes reimbursement of 50% of costs for exterior facade, patio improvements, parklets, sidewalk and patio cafes, lighting, security, and other items identified as meeting the spirit of the program. Additionally, the roof of a vacant structure will qualify if the scope of work includes activating the property. Smaller scale expedited $10,000 micro -grants can be approved by the City Manager, or his designee, and administered by DMD and City Staff. Approved agreements will be reported to TIRZ #3 Board at the next Regular Meeting following award. Projects supported through these programs will be updated in Exhibit E. Through an interlocal agreement with the DMD, TIRZ #3 will pursue development initiatives in four categories: 6. Site Management & Vacancy Development —TIRZ #3 developed a program to activate vacant properties within TIRZ #3, resulting in the adoption of a downtown vacant building ordinance in 2018. The program will establish minimum requirements for vacant properties and designate registered properties as eligible for incentives or emergency stabilization funding. Funding will be allocated to establish and administer the program. In order to activate strategically located properties, TIRZ #3 may place properties under option and work towards developing proposals for development, then assist in acquisition and development of the properties. Additionally, TIRZ #3 may purchase properties outright for redevelopment and dispose of properties, if approved by the Board. Under this initiative, funding may also be expended for stabilization or redevelopment of public, cultural and/or historic properties. Target properties include: • The Ritz Theater (1929) • The Montgomery Ward Building (1936) • Blacknall Auto Dealer (built 1912) 7. Parking Development— In 2016 TIRZ #3 conducted a study to develop a strategic approach for parking in the Downtown and fund implementation steps. TIRZ #3 will continue to fund implementation of this study, as well as further analysis to develop the parking system into a functional business model. This includes improving public parking facilities such as on -street spaces or off-street lots and structures. Additionally, TIRZ #3 may support any efforts for appropriate parking management infrastructure such as meters, lot improvements, structured garages, and occupancy monitoring systems. Wage City of Corpus Christi / Corpus Christi Downtown Management District 8. Public Space, Right of Way & Streetscape Development — In 2017, TIRZ #3 conducted a study to strategically approach traffic patterns and movement throughout the zone. TIRZ #3 may contribute to implementation of the study, infrastructure (repaving, repair, widening, redesign), traffic management infrastructure (signals, signs), and beautification (landscaping in medians, special lighting, etc.). Additionally, pedestrian accommodations and streetscapes will be a priority. Funds may also be expended on implementation of infrastructure improvements, as listed below: • Artesian Park & La Retama Park Rehabilitation - $150,000 in FY 20 and $50,000 Annually for new improvement projects. • Special Purpose or Pocket Parks, Including Norma Urban Park, Sherrill Park, and Spohn Park. • Two Way Street Conversions - $400,000 in FY 21 • Right of Way Maintenance - $100,000 Annually • Broadway Bluff Balustrade Maintenance and Repair Assessment • Water Street Reimagined - $25,000 in FY 21, Additional Funding for Implementation • Agnes Laredo Entrance Reimagined • Lighting Improvements • Pedestrian Improvements 9. Targeted Office to Residential Conversion Program (Created 2023) - Requirements Only the properties listed below will be eligible for this program. Properties not included on this list may be considered on an individual basis. The project requires a minimum improvement investment amount of $5,000,000 (not including the purchase of the building or demolition) and must create a minimum of 25 residential units. The total allowable reimbursement is not to exceed 30% of the construction cost associated with the conversion or in support of the conversion. Performance milestones will be included in the agreement and these milestones may include: • Securing financing • Permit submittal • Construction start • Project completion The project must include exterior design features such as architectural lighting and design -oriented landscaping. This program may be layered with the Downtown Living Initiative & Streetscape programs only. This program will expire on 12/31/25. Applications must be submitted prior to this date to be considered. Eligible Expenses for Reimbursement • 50% Reimbursement for Eligible Improvements include: o Mechanical, Electrical, & Plumbing o Structural (Exterior walls, roof, foundation, building core, and stairwells) o Fire Safety o Elevator (Cabin structure, cable & hydraulic systems, and mechanical or electrical systems) o Not intended for cosmetic or programming improvements o Environmental Remediation: i.e. asbestos, lead, and other recognized environmental conditions (RECs) o Parking Garage that includes a portion available for public parking • While reimbursement is intended for the residential conversion costs only, improvements to non-residential portions of the building may be deemed an eligible expense if they support 9IPa,_ City of Corpus Christi / Corpus Christi Downtown Management District the converted residential units and are included on the list of expenses eligible for reimbursement under this program. • Developer reimbursement payout to be within 5 years after the completion of the project but a shorter payout period may be considered. Reimbursement schedule dependent upon available TIRZ fund balances. Eligible Bui ding List Building Name Address Building Name Address Bayview Tower 400 Mann Park Tower 710 Buffalo Guaranty Title Bldg 921 N Chaparral The Chamberlain 807 N Upper Broadway Caller Times Bldg. 820 N Lower Broadway 802 NC 802 N Carancahua One Shoreline Plaza 801 N Shoreline Petroleum Tower 811 N Carancahua Furman Plaza 418 Peoples Former Wells Fargo Bldg 615 N Upper Broadway Peoples Street Bldg. 402 Peoples American Bank Plaza 711 N Carancahua Plains Capital Bank Tower 500 N Shoreline 600 Building 600 Leopard 1st Community Bank Tower 500 N Water Wilson Plaza 606 N Carancahua Former Supreme Lending Bldg. 325 Mesquite Tower II 555 N Carancahua Bay Building 101 N Shoreline Borden Insurance Bldg 210Carancahua 10. Technology, Innovation, and Startup Ecosystem Development — TIRZ #3 contains over 3,000,000 square feet of office space that has maintained a high level of vacancy since the late 1980's. TIRZ #3 will support the development of an ecosystem where technology, innovation, startups, and entrepreneurs may launch new enterprises and contribute to the economic development of the downtown area. Specific projects may include Wi-Fi expansion, a co -working space, business incubator, and other platforms, in partnership with the DMD, CCREDC, Texas A&M University Corpus Christi, Del Mar College, and other innovation -oriented institutions. Finally, TIRZ #3 will compensate the City and the DMD (subject to an interlocal agreement between the TIRZ #3 and the DMD) for the costs of ongoing administration of TIRZ #3, including but not limited to accounting, legal services, consulting services, document production and maintenance, and other administrative costs. Staff plans to strategically engage outside resources to evaluate revenue projections and continue to develop innovative, effective programs. Economic Feasibility Study §311.011 (c) (3) The 2008 Market and Economic Feasibility Study for TIRZ #3 was completed by CDS Market Research I Spillette. In support of the DADP, Goody Clancy completed additional studies that reflect the more recent environment, and emphasize the importance of residential development in any revitalization. Additional analysis have been undertaken to keep data updated. Those studies include: 101Page City of Corpus Christi / Corpus Christi Downtown Management District • 2014 Residential Market Potential (Zimmerman/Volk) • 2014 Retail Market Analysis & Strategy (Mike Berne) • 2014 Hotel, Office, Retail (W-ZHA, Sarah Woodworth) • 2014 Incentives & Development Economics (W-ZHA, Sarah Woodworth) • 2017 Residential Analysis - (RCLCO) • 2021 Residential Analysis - (RCLCO) • 2021 Retail Leakage Report— (The Retail Coach) Estimate of Bonded Indebtedness §311.011 (c) (4) It was not anticipated that TIRZ would issue bonded debt, but would be funded on a pay-as-you-go basis. If the annual revenue and available non -bonded debt financing are insufficient to address the needs of TIRZ #3, we may issue bonded debt commensurate with the specific project costs under consideration and anticipated annual revenues to support debt service payments. Timing of Incurring Costs or Monetary Obligation §311.011(c) (5) Costs will be incurred over the life of the TIRZ #3 based on its Board of Directors' identification of priority activities and projects, opportunities for implementation, and available revenues to sustain a pay-as-you- go project expenditure approach. Annual Budgets are included in Exhibit C. Method of Financing and Sources of Revenue §311.011(c) (6) Methods of Financing. TIRZ #3 will initially take a primarily pay-as-you-go approach to financing projects that could utilize the following methods: • Cash funds generated from existing property value increment, • Developer cash reimbursement agreements where the revenues from the TIRZ #3 property tax increment compensate a developer for fronting eligible expenditures in a specific taxable project. • If future TIRZ #3 revenues to support debt service payments are anticipated, the TIRZ #3 may also issue bonded debt, the term of which will not extend past the expected life of the TIRZ #3. Sources of Revenue. The primary source of revenue for TIRZ #3 will be funds from the contributed property tax collections of the City of Corpus Christi, Nueces County, and Del Mar College on the taxable property value increment within TIRZ #3. The City, County, and Del Mar College have agreed to participate in funding TIRZ #3 with 100% of the incremental property taxes collected over the life of the Zone. The assessed value base year for the City of Corpus Christi is 2009; the base year or Nueces County and Del Mar College is 2010. The 2018 adjusted projection of incremental property tax revenue contributed to the Zone is as follows: 111 Page City of Corpus Christi / Corpus Christi Downtown Management District These estimates will continue to be monitored and adjusted annually. Sources of Revenue Year Increment Value Tax Revenue Fiscal Year City County Del Mar Total City County Del Mar TOTAL FY 10 8,938,611 - - 8,938,611 50,400 -- 50,400 FY 11 21,931,959 4,698,427 4,674,139 31,304,526 127,703 16,488 12,059 156,251 FY 12 22,782,697 15,449,269 15,290,811 53,522,776 129,988 54,227 39,451 223,666 FY 13 43,910,295 38,987,148 38,041,488 120,938,931 250,533 136,845 98,148 485,526 FY 14 56,814,718 51,751,996 50,602,120 159,168,834 332,516 176,474 126,842 635,832 FY 15 61,641,842 57,170,457 55,257,674 174,069,974 359,150 189,203 137,079 685,432 FY 16 73,819,407 81,480,890 80,084,765 235,385,063 447,540 254,977 198,669 901,186 FY 17 82,672,144 96,768,777 95,440,711 274,881,633 501,211 294,266 234,936 1,030,413 FY 18 90,723,843 94,622,680 98,178,819 283,525,342 550,026 287,740 241,676 1,079,442 FY 19 96,280,721 110,962,179 117,040,051 324,282,951 583,715 337,427 288,105 1,209,247 FY 20 105,165,9511 111,267,007 123,927,631 340,360,589 637,583 338,354 305,059 1,280,996 FY 21 112,055,614 127,652,230 144,304,130 384,011,974 679,353 388,180 355,218 1,422,751 FY 22 121, 974, 293 130,414,841 155, 674, 539 408, 063, 674 739,486 396,581 383,207 1,519,274 FY 23 130,351,758 147,214,456 178,552,529 456,118,743 790,276 447,667 439,523 1,677,466 FY 24 141, 527, 057 152, 497, 010 194, 956, 096 488, 980,162 858,028 463,731 479,902 1,801,661 FY 25 151,580,816 170,089,008 221,442,870 543,112,694 918,980 517,227 545,102 1,981,309 FY 26 164,264,179 178,010,361 243,673,527 585,948,067 995,875 541,315 599,824 2,137,014 FY 27 176, 220,443 196, 790, 562 275, 051,046 648, 062, 051 1,068,361 598,424 677,063 2,343,848 FY 28 190, 697, 246 207, 528,945 304,184, 757 702,410,948 1,156,129 631,079 748,778 2,535, 986 FY 29 204, 825, 030 227,919,904 341, 971,692 774,716, 626 1,241,780 693,086 841,794 2,776, 661 Bold=Actuals $ 12,418,634 $ 6,763,292 $ 6,752,435 $25,934,361 Current Appraised Value & Estimated Captured Appraised Value §311.011(c)(7), (8) According to the Nueces County Appraisal District, the 2009 certified taxable appraised value for the Zone is $310,019,372. The table above projects taxable value increment captured by the Zone over the remainder of its duration, if all taxing entities continue participation. Due to differences in policies regarding exemptions and tax abatements, the captured increment differs among the three jurisdictions. Captured value projections assume a 2.5% annual value appreciation rate for existing development, based on actual property value growth and do not take into account future investments. Duration of the Zone §311.011(c)(9) TIRZ #3 will exist until 2028, however, City may extend the term of the TIRZ #3 by ordinance and other taxing entities may choose to participate for the additional term. 121 Page City of Corpus Christi / Corpus Christi Downtown Management District Exhibit A — Boundaries & Land Use • TIRZ Boundary O • SEA District • Uptown • Marina Arts District (DMD) • Bayshore Park 0 I 1 I I Tax Increment Finance District #3 1 a Legend omwa rl aiming Land U. • --" a:3.3 �.-„...... HearI r,rend Me P. 11111 Mogan Nat,* t City ul Cor�w Ch1'p u • r.�.cw.v r....n&at am msmaty ..,,ra"'” IMplmtlea .,..wa tiw (N. .ta•anw«ro utom, _ r.A.,..,.. rp Prepared By MBB Ponbn9 Date; Thursday, October 19. 2007 9:14:41 AM Project: Source: City of Corpus Christi- 0evelopment Semcas 131 Page City of Corpus Christi / Corpus Christi Downtown Management District Exhibit B. - Legal Description of the Zone BEGINNING AT A POINT on the center line of the Corpus Christi Ship Channel and commonly known as the Corpus Christi — Port Aransas Waterway at its intersection with the northerly extension of the West right-of-way line of Sam Rankin Street; Thence Easterly along the centerline of the Corpus Christi — Port Aransas Waterway to its intersection with the northerly extension of a line parallel with the breakwater 50' feet on the east side for a point in the Corpus Christi Bay and the Northeast corner; Thence Southerly along said line, being 50 feet on the East side and parallel with the breakwater, following the meanders of the breakwater in the Corpus Christi Bay to its intersection with an "A-2" zoning line approximately 1,000 feet from the shoreline and parallel with the East right-of-way line of Shoreline Boulevard for a point in the Corpus Christi Bay; Thence Southwesterly along said "A-2" zoning line extending parallel and approximately 1,040 feet from the East right-of-way line of South Shoreline Boulevard to its intersection with a second "A-2" zoning line extending parallel and approximately 1,000 feet from an existing 18 foot seawall easement, inside the Marina Del Sol Boat Harbor, for a point in the Corpus Christi Bay; Thence Southeasterly along said line 200 feet more or less past its intersection with the easterly extension of the south most boundary of Lot 3, Block 1 of Marina Del Sol Subdivision for a point in the Corpus Christi Bay and the Southeast corner; Thence Southwest along a line 200 feet more or less to the South and parallel with the extension of the south boundary of Lot 3, Block 1 of Marina Del Sol Subdivision to the Corpus Christi Bay Shoreline; Thence Northwest along the Corpus Christi Bay Shoreline to its intersection with the extension of the South most boundary of Lot 3, Block 1 of Marina Del Sol Subdivision; Thence Southwest along the South boundary of Lot 3, Block 1 of Marina Del Sol Subdivision, 540 feet more or less to the centerline of Ocean Drive for a point; Thence Northwest along the centerline of Ocean Drive to its intersection with the centerline of Morgan Avenue; Thence Southwest along the centerline of Morgan Avenue, to a point in the center line of Santa Fe Street for the Southwest corner; Thence Northwest along the centerline of Santa Fe Street to its intersection with the centerline of Hancock Street; Thence Southeast along the centerline of Hancock Street to its intersection with the centerline of South Tancahua Street:; Thence Northerly along the centerline of South Tancahua Street, passing Furman, Coleman, Park, Agnes, and Laredo Street, to a point in the centerline where South Tancahua becomes North Tancahua, and continuing along North Tancahua, passing Kinney, Blucher, Comanche, Lipan, Leopard, Antelope and Buffalo Street and continuing past IH 37 to its intersection with the centerline of the existing northwest frontage road of I.H. 37, for a point; Thence Northeast along the centerline of said existing northwest frontage road of I.H. 37 to its intersection with the South right-of-way line of West Broadway Street for a point; Thence along the South right-of-way line of West Broadway Street to its intersection with the westerly extension of the South right-of-way line of Concrete Street for a point; Thence Northeasterly along the South right-of-way line of Concrete Street extended, to its intersection with the north right-of- way line of West Broadway Street, for a point; Thence Northwesterly along the North right-of-way line of West Broadway Street to the Southeast property line of the City of Corpus Christi's Broadway Wastewater Treatment Plant; Thence Northeasterly along the City of Corpus Christi's Broadway Wastewater Treatment Plant Southeast property line to its intersection with the common South boundary line of Lots 1, Block 58 of the Beach Addition; Thence West along the South boundary line of Lot 1, Block 58 out of the Beach Addition, to its Southwest corner for a point; 141 Page City of Corpus Christi / Corpus Christi Downtown Management District Thence Northwest along the common, West boundary line of Lots 1 thru 6, Block 58, of the Beach Addition, to its intersection with the South right-of-way line of Resaca Street; Thence Northeast along the South right-of-way line of Resaca Street to its intersection with the centerline of Tancahua Street, for a point; Thence Northwest along the centerline of Tancahua Street to its intersection with the centerline of Port Avenue, for a point; Thence Southwest along the centerline of Port Avenue, to its intersection with the West right-of-way line of Sam Rankin Street for an outside corner; Thence Northerly along the West right-of-way line of Sam Rankin Street and its extension to its intersection with the centerline of the Corpus Christi — Port Aransas Waterway center line in the Corpus Christi Ship Channel to the POINT OF BEGINNING. Excluded properties to meet state statute prohibiting Tax Increment Financing Districts from containing 10% or more of the area used for residential purposes: Beach Addition Block 55 Lots 10 thru 12 151 Page City of Corpus Christi / Corpus Christi Downtown Management District Exhibit C. - Tracking List of Project Plan Changes By Year April 2009 — Expansion of Boundaries March 2012 - Correction of Termination Date August 2014 - Correction of Board Composition First Amendment (FY 2015) — Overhaul and update of the project and financing plan based upon new market information and the Downtown Area Development Plan findings. Second Amendment (FY 2017) — To continue and enhance the Zone's efforts, this Amendment provides for programming and services from the DMD; refines some of the Incentive Programs; and provides the ability for TIRZ funds to be expended for public, cultural and/or historic properties within the Zone. Updates also include the commitment from Del Mar College's extended participation to the end of the Zone. Note: Schedule of Project Expenditures (Page 7) updated as Exhibit C— FY2017 Project Plan Budget. Third Amendment (FY 2017) — this Amendment renames the (5) Site Assembly & Development category to (5) Site Management & Development and discusses a pilot vacant building program in the Reinvestment Zone. Additionally, both (6) Parking Management and (7) Traffic Pattern and Streetscapes expand to authorize funding for implementation. (8) Other Programs and Initiatives expands to include Cultural District Plan, upon Board's approval of the DMD's FY 2018 Scope of Services. Note: Schedule of Project Expenditures updated as Exhibit C— FY 2018 Project Plan Budget. Fourth Amendment (FY 2018) — this Amendment extends the four Incentive Programs for an additional 3 -year period and includes the new FY 2019 Budget as Exhibit C. It also provides an updated Sources of Revenue table showing the projected revenue of the TIRZ over time. Fifth Amendment (FY 2021) — this Amendment incorporates implementation that occurred in FY 2020 and refines parameters for more aggressive incentives for FY 21 based upon the remaining rehabilitation hurdles and economics. Sixth Amendment (FY 2021) this Amendment modifies two incentive programs to expand their impact — New Commercial Tenant Finish Out and Chaparral Street Property Improvement Grant. This Amendment modifies the Streetscape and Safety Improvement Program to extend eligibility to patio cafes as an exterior improvement. Seventh Amendment (FY 2022) this Amendment modifies the New Commercial Tenant Finish Out Program remove the "New" and "Tenant" from the qualifying requirements to become "Commercial Finish -Out Program" to expand the qualifying categories. Eighth Amendment (FY 2023) this Amendment adds Innovation and Tech Led Economic Development. Ninth Amendment (FY 2023) this Amendment increased per unit incentive for the Downtown Living Initiative to $30,000 or $30,000 of per unit development costs; added roofs as a qualifying category for Streetscape & Safety Program and added special use and pocket parks to Public Space, Right of Way and Streetscape Development. 16 !Page City of Corpus Christi / Corpus Christi Downtown Management District Exhibit D. Downtown Development Projects Completed Projects The Chamberlain Address 807 N Upper Broadway Incentive Project Specific TIRZ Meeting 9/17/19 Performance Deadline 3/31/21 Project Cost $ 11,000,000.00 Incentive Value $ 520,000 Incentive Paid Out $ 520,000 Frost Bank 5015 Shoreline Project Specific 10/24/17 3/31/21. $ 35,000,000.00 $ 600,000 $ 600,000 Marriott 309 N Shoreline Project Specific 11/15/16 11/30/19 $ 15,000,000.00 $ 940,000 $ 148,965 Stonewater (401 S Water) 401.5 Water Project Specific 5/15/18 6/30/19 $ 755,000.00 $ 200,000 $ 209000 Centre Theatre LLC (301 Chap) 301 N Chaparral Chap Street 7/24/18 4/30/19 $ 18,964.00 $ 9,482 $ 9,482 Centre Theatre LLC (305 Chap) 305 N Chaparral Chap Street 7/24/18 4/30/19 $ 18,964.00 $ 9,482 $ 9,482 H2O Market Trust - Lucy's 312 N Chaparral, Ste. A Chap Street 12/4/18 4/1/19 $ 72,465.00 $ 20,390 $ 20,390 Chels Marie 903 N Chaparral Chap Street 11/20/18 $ 16,878.00 $ 8,439 $ 8,439 Urbana 424 Chaparral Chap Street 1/26/16 $ 500,000.00 $ 72,000 $ 72,000 BUS 702 N Chaparral Chap Street 2/1/17 2/1/18 $ 940,000.00 $ 100,000 $ 100,000 Limerick Apts (Ronjo V) 2015 Chaparral DLI 9/17/19 8/31/20 $ 1,700,000.00 $ 220,000 $ 220,000 Studio44Apts 817 N Carancahua DU 4/12/16 7/31/19 $ 2,900,000.00 $ 185,000 $ 185,000 Muse Bistro (Tenant) 414 Starr New Tenant 1/28/20 10/31/20 $ 40,000.00 $ 7,888 $ 7,888 Fresco (Tenant) 619 N Chaparral New Tenant 3/19/19 7/31/19 $ 92,000.00 $ 22,640 $ 22,640 K Space (Tenant) 623 N Chaparral New Tenant 2/29/20 2/29/20 $ 32,450.00 $ 6,490 $ 6,490 Cre8ive Culture (Tenant) 423 William New Tenant 2/27/18 $ 34,548.00 $ 6,910 $ 6,910 Nueces Brewing (Tenant) 401 5 Water New Tenant 5/15/18 6/30/19 $ 1,070,000.00 $ 61,700 $ 61,700 Produce Art Gallery 419 Peoples New Tenant 9/29/20 7/31/21 $ 63,500.00 $ 7,500 $ 7,500 Elizabeth's Art Museum New Tenant 3/30/21 7/31/21 $ 95,533.00 $ 23,280 $ 23,280 Commons New Tenant (Admin) 4/30/21 $ 20,000.00 $ 5,475 $ 5,475 Americano Properties 415-419 Peoples Streetscape 8/27/19 8/31/20 $ 425,000.00 $ 93,450 $ 93,450 Dtown Carwash Club (Tenant) 417 Mesquite Streetscape 12/17/19 10/31/20 $ 500,000.00 $ 45,923 $ 45,923 Aka Sushi 415 N Water Streetscape 11/19/19 4/30/20 $ 434,000.00 $ 117,300 $ 117,300 Dokyo 424 N Chaparral Streetscape 9/17/19 1/31/20 $ 440,000.00 $ 36,527 $ 36,527 Shook 106 N Chaparral Streetscape 2/19/19 9/30/19 $ 6,164.00 $ 3,082 $ 3,082 HOR 623 Mesquite Streetscape 2/19/19 4/30/19 $ 15,572.00 $ 7,786 $ 7,786 The Goldfish Bar (Treiber) 724 Mesquite Streetscape 2/7/20 4/7/20 $ 85,000.00 $ 9,230 $ 9,230 H2O Market Trust -Oyster Bar 309 N Water Streetscape 9/23/19 1/31/20 $ 21,964.00 $ 10,000 $ 10,000 H2O Market Trust - Lucy's 312 N Chaparral, Ste. A Streetscape 3/5/19 4/5/19 $ 7,138.00 $ 3,569 $ 3,569 Tim Clower - K Space 623 N Chaparral Streetscape 8/27/19 3/31/20 $ 40,150.00 $ 20,075 $ 20,075 Visit CC 309 N Water, Ste. D Streetscape (Admin) 11/13/20 1/31/21 $ 465.00 $ 233 $ 233 Rockit's 709 N Chaparral Streetscape $ 21,200.00 $ 10,000 $ 10,000 IBC 2215 Shoreline Streetscape 9/30/18 $ 16,721.00 $ 8,360 $ 8,360 GoldFish (R. Cooper) 724 Mesquite Streetscape $ 2,534.00 $ 1,267 $ 1,267 Water Street Gardens Streetscape (Admin) 2/5/21 4/1/21 $ 22,000.00 $ 10,000 $ 10,000 AAdi 1001 2nd St Streetscape 4/27/21 9/30/21 $ 168,000.00 $ 24,036 $ 24,036 ESC K2 209 N Water Streetscape 7/27/21 10/31/21 $ 37,226.00 $ 18,613 $ 18,613 Aadi Mural 1001 2nd St Streetscape 1/24/22 5/30/22 $ 20,150.00 $ 9,825 $ 9,825 Vernon's 1030 3rd St Streetscape 10/22/21 9/21/21 $ 23,870.00 $ 10,000 $ 10,000 Private Wealth Group 1102 Santa Fe Streetscape 9/21/21 9/30/22 $ 133,500.00 $ 66,750 $ 66,750 Hypebyke 311 Peoples Commercial Finish Out 1/22/22 12/31/22 $ 34,825.00 $ 12,000 $ 12,000 Hybrid Records 417 Peoples Commercial Finish Out 1/22/22 4/30/22 $ 20,000.00 $7,040 $7,040 All Good Fitness 424 Schatzel Commercial Finish Out 5/24/22 1/31/22 $ 100,000.00 $ 39,000 $ 23,010 r$ 71,988,456 '$ 1,247,452 $ 1,205,952 This will be updated when project plan is amended. 171Page