Loading...
HomeMy WebLinkAboutM1992-169 - 07/14/1992Motions - 7/14/92 Motion authorizing a Contract for Engineering Services with Urban Engineering in the amount of $75,500 for; 1) Design and Construction Phase Services for the diversion of the flows from the Horne Road Lift Station to the Westside Wastewater Treatment Plant collection system and the construction of a force main along Staples Street from Louisiana Parkway to Texan Trail in lieu of rehabilitating the gravity trunk main; and 2) Design Phase Services of a force main between the Arcadia Lift Station and the Horne Road Lift Station to be constructed at a future date. M92-169